Performance management

168 terms

Oversight roles, quality assurance, and contractor performance monitoring terminology.

ACOR

Technical oversight role

Alternate Contracting Officer's Representative

An Alternate Contracting Officer's Representative is an individual formally designated in writing to support or act in place of the primary COR in overseeing contractor performance on a specific contract or order. The ACOR's responsibilities typically include monitoring technical performance, inspecting and accepting deliverables when authorized, verifying that services meet the requirements of the statement of work or performance work statement, and documenting performance issues for the contracting officer. Unlike the contracting officer, an ACOR cannot unilaterally change contract terms or increase funding, but operates within a delegated authority defined in the designation letter and training requirements. The position provides continuity of surveillance when the primary COR is unavailable and helps maintain consistent, documented oversight.

Read more

EVM

Management methodology

Earned Value Management

Earned Value Management is a project management methodology integrating scope, schedule, and cost data to objectively measure project performance and progress. EVM compares planned value, earned value, and actual costs to identify variances and forecast completion. DoD and other agencies require EVM on major contracts, with specific system requirements defined in agency supplements. Contractors must maintain EVM-compliant systems that produce accurate, timely performance data. EVM metrics like Cost Performance Index (CPI) and Schedule Performance Index (SPI) provide early warning of problems and support proactive management.

Read more

AFEB

Evaluation body

Award Fee Evaluation Board

The Award Fee Evaluation Board is a group of government officials responsible for evaluating contractor performance under award fee contracts. The AFEB assesses performance against established criteria and recommends fee amounts to the Fee Determination Official based on the quality of work delivered.

Read more

COTR

Government role

Contracting Officer's Technical Representative

A Contracting Officer's Technical Representative is an alternative title for a COR, emphasizing the technical oversight responsibilities. The COTR monitors contractor technical performance, reviews deliverables, and provides technical guidance while reporting to the contracting officer on performance issues.

Read more

EVMS

Management system

Earned Value Management System

An Earned Value Management System is a contractor's integrated management control system that meets government criteria for planning, scheduling, budgeting, and measuring contract performance. EVMS certification is required for major acquisitions to ensure reliable performance data for oversight.

Read more

QA

Process

Quality Assurance

Quality Assurance encompasses systematic activities to ensure products and services meet specified requirements. In government contracting, QA includes surveillance by government personnel and contractor quality control processes to verify compliance with contract standards.

Read more

QAE

Government role

Quality Assurance Evaluator

A Quality Assurance Evaluator is a government employee responsible for monitoring and documenting contractor performance against quality standards. QAEs conduct surveillance per the QASP, identify deficiencies, and provide performance information to contracting officers and CORs.

Read more

QASP

Planning document

Quality Assurance Surveillance Plan

A Quality Assurance Surveillance Plan documents how the government will monitor contractor performance under a service contract. The QASP identifies performance standards, surveillance methods, acceptable quality levels, and procedures for addressing performance issues.

Read more

QCP

Contractor document

Quality Control Plan

A Quality Control Plan is the contractor's documented approach for ensuring deliverables meet contract requirements. The QCP describes inspection procedures, testing methods, corrective action processes, and internal controls the contractor will implement for quality management.

Read more

SLA

Contract element

Service Level Agreement

A Service Level Agreement defines measurable performance standards for services, including response times, availability, and quality metrics. SLAs establish expectations, measurement methods, and consequences for performance that exceeds or fails to meet targets.

Read more

SOP

Process document

Standard Operating Procedure

A Standard Operating Procedure is a documented process that establishes step-by-step instructions for routine operations. SOPs ensure consistency, compliance, and quality in performing recurring tasks and are often required as contract deliverables or compliance documentation.

Read more

SPI

Performance metric

Schedule Performance Index

The Schedule Performance Index is an earned value metric calculated as earned value divided by planned value. SPI measures schedule efficiency, with values above 1.0 indicating ahead-of-schedule performance and values below 1.0 indicating schedule slippage.

Read more

WBS

Planning tool

Work Breakdown Structure

A Work Breakdown Structure is a hierarchical decomposition of project work into manageable components. WBS defines deliverable-oriented work packages used for planning, scheduling, budgeting, and performance measurement. Well-defined WBS is essential for earned value management.

Read more

WP

Planning document

Work Plan

A Work Plan is a detailed document describing how contract work will be organized, scheduled, and executed. Work plans identify tasks, milestones, resources, and dependencies, serving as the basis for performance tracking and management decision-making.

Read more

GAT

Testing process

Government Acceptance Testing

Government Acceptance Testing is the formal testing process by which the government verifies that deliverables meet contract requirements before acceptance. GAT procedures, criteria, and documentation requirements are typically defined in the contract's quality assurance provisions.

Read more

FSR

Report type

Federal Status Report

A Federal Status Report provides periodic updates on contract performance, financial status, or program progress. FSRs are commonly required deliverables that keep the government informed of contractor activities and any issues affecting performance.

Read more

OJT

Training method

On-the-Job Training

On-the-Job Training is hands-on training provided in the actual work environment. OJT requirements in contracts specify how contractor personnel will be trained and may include provisions for training government employees or transitioning staff.

Read more

SMR

Report type

Summary Monthly Report

A Summary Monthly Report provides consolidated monthly status information on contract performance, expenditures, and activities. SMRs are standard deliverables that keep program offices informed of progress and emerging issues.

Read more

QMP

Planning document

Quality Management Plan

A Quality Management Plan documents the contractor's approach for ensuring quality throughout contract performance. QMPs describe quality policies, procedures, roles, and metrics used to achieve and verify conformance with requirements.

Read more

RCA

Analysis method

Root Cause Analysis

Root Cause Analysis is a problem-solving method to identify the underlying cause of defects or failures. RCA is used in contract performance to diagnose problems, prevent recurrence, and improve processes after incidents or quality issues.

Read more

TPM

Performance metric

Technical Performance Measure

Technical Performance Measures are metrics tracking achievement of technical requirements during system development. TPMs provide early warning of potential problems by measuring actual performance against planned values for critical parameters.

Read more

WPA

Authorization

Work Plan Approval

Work Plan Approval is formal government authorization of a contractor's proposed approach before work begins. WPA ensures the government concurs with the contractor's planned methodology, schedule, and resource allocation for contract performance.

Read more

DMS

Information system

Document Management System

A Document Management System provides electronic storage, retrieval, and tracking of documents. In government contracting, DMS requirements address contractor and government systems for managing proposal, contract, and deliverable documentation.

Read more

GIDEP

Data sharing program

Government-Industry Data Exchange Program

The Government-Industry Data Exchange Program facilitates sharing of technical data between government and industry participants. GIDEP provides alerts on parts problems, failure experiences, and product quality information to prevent repeated issues.

Read more

GPS

Technology system

Global Positioning System

The Global Positioning System is a satellite-based navigation system operated by the U.S. Space Force. GPS technology requirements appear in many defense and civilian contracts for navigation, timing, and location-based applications.

Read more

APM

Program role

Assistant Program Manager

An Assistant Program Manager supports the Program Manager in overseeing all aspects of a government program or major contract effort. The APM typically manages day-to-day operations, coordinates with technical teams and stakeholders, and may assume PM responsibilities in the PM's absence. APMs often focus on specific functional areas such as technical performance, business operations, or schedule management. On contractor teams, the APM role may be a proposal requirement, with qualifications and experience evaluated during source selection. Effective APMs maintain program continuity and provide depth to the management team.

Read more

AQ

Quality concept

Acquisition Quality

Acquisition Quality refers to the standards, processes, and practices that ensure procured goods and services meet specified requirements and performance standards. AQ encompasses quality assurance planning, inspection procedures, acceptance criteria, and corrective action processes throughout the acquisition lifecycle. Quality requirements are defined in contracts through quality assurance surveillance plans, inspection clauses, and technical specifications. Contractors must demonstrate adequate quality management systems, and government quality assurance representatives verify compliance. Strong acquisition quality practices reduce defects, rework, and performance issues.

Read more

BCL

Program management concept

Baseline Control Level

Baseline Control Level refers to the management authority level at which changes to program baselines must be approved. Different BCLs are established for cost, schedule, and technical baselines, with higher-value or higher-impact changes requiring approval at higher organizational levels. In Earned Value Management systems, baseline changes must be processed through formal change control procedures. Minor changes may be approved at the contractor level, while significant changes require government approval. Establishing appropriate BCLs ensures proper oversight of baseline integrity while allowing flexibility for routine adjustments.

Read more

BPI

Service category

Business Process Improvement

Business Process Improvement refers to systematic efforts to analyze, measure, and enhance organizational processes to increase efficiency, reduce costs, and improve quality. BPI initiatives are common requirements in management consulting, IT modernization, and organizational support contracts. Government BPI efforts often involve documenting current-state processes, identifying inefficiencies and bottlenecks, recommending improvements, and supporting implementation. Contractors providing BPI services typically use methodologies such as Lean, Six Sigma, or process mapping to deliver measurable improvements in agency operations.

Read more

BPR

Service category

Business Process Reengineering

Business Process Reengineering is the fundamental rethinking and radical redesign of business processes to achieve dramatic improvements in critical measures of performance such as cost, quality, service, and speed. Unlike incremental BPI, BPR involves comprehensive transformation of how work is performed. Federal agencies undertake BPR initiatives when existing processes are fundamentally broken or when major system implementations require new ways of working. BPR contracts typically involve current-state assessment, future-state design, gap analysis, change management, and implementation support. Successful BPR requires strong executive sponsorship and organizational change management.

Read more

BSC

Management framework

Balanced Scorecard

A Balanced Scorecard is a strategic performance management framework that measures organizational performance across four perspectives: financial, customer, internal processes, and learning and growth. BSC provides a balanced view beyond purely financial metrics to assess overall organizational health. Government agencies and contractors use BSC frameworks to align activities with strategic objectives, improve communication, and monitor performance against goals. Contract performance metrics may incorporate BSC principles to ensure comprehensive evaluation across multiple dimensions including mission outcomes, stakeholder satisfaction, operational efficiency, and workforce development.

Read more

BTR

Government role

Buyer Technical Representative

A Buyer Technical Representative is a government employee designated to provide technical expertise and support to the contracting officer during the acquisition process. The BTR assists with developing technical requirements, evaluating proposals, and providing technical oversight during contract performance. BTRs typically have subject matter expertise in the goods or services being procured. Their role is advisory to the Contracting Officer and may include reviewing contractor deliverables, attending progress meetings, and recommending technical decisions. BTRs do not have authority to direct contractor work or modify contract terms without CO delegation.

Read more

CAP

Contract documentation

Corrective Action Plan

A Corrective Action Plan is a formal document that identifies deficiencies in contractor performance, specifies the root causes, and outlines the actions the contractor will take to remedy the problems and prevent recurrence. CAPs are typically required when the government identifies significant performance issues or contract compliance failures. Effective CAPs include specific corrective actions with responsible parties and completion dates, metrics to verify effectiveness, and procedures to sustain improvements. Contracting Officers may require CAPs in response to CPARS evaluations, quality deficiencies, or audit findings. Failure to implement adequate corrective actions may result in cure notices, termination, or negative past performance ratings.

Read more

CBR

Review process

Cost and Business Review

A Cost and Business Review is a formal periodic review examining contractor cost performance, business systems adequacy, and financial health on major contracts. CBRs assess whether actual costs align with planned budgets, evaluate the effectiveness of contractor management systems, and identify cost risks requiring attention. CBRs typically involve analysis of Earned Value Management data, review of indirect rate performance, assessment of subcontract management, and evaluation of contractor corrective actions. Government program managers use CBR findings to inform contract decisions and identify areas requiring increased oversight. Contractors should prepare thoroughly for CBRs as findings may impact future funding decisions.

Read more

CCTV

Security system

Closed-Circuit Television

Closed-Circuit Television refers to video surveillance systems used for security monitoring where signals are transmitted to a limited set of monitors rather than publicly broadcast. CCTV systems are common requirements in facility security, physical access control, and protective services contracts. Government CCTV procurements may involve system design, installation, monitoring services, and maintenance. Security-related CCTV contracts often include requirements for recording retention, integration with access control systems, and compliance with privacy regulations. Recent focus on supply chain security has increased attention to CCTV equipment sourcing and restrictions on certain foreign-manufactured components.

Read more

PIM

Performance concept

Performance Improvement Metric

A Performance Improvement Metric is a quantifiable measure used to track progress toward performance objectives and identify opportunities for enhancement. PIMs establish baselines, set targets, and monitor trends in contractor or program performance over time. In performance-based contracts, PIMs may be linked to incentive payments, award fees, or other consequences based on measured results. Effective PIMs are specific, measurable, achievable, relevant, and time-bound. Contractors should understand how PIMs will be calculated, what data sources feed the measurements, and how performance against metrics affects contract outcomes and past performance evaluations.

Read more

RAP

Planning document

Risk Assessment Plan

A Risk Assessment Plan is a document that identifies potential risks to program or contract success, analyzes their likelihood and impact, and defines strategies for risk mitigation, monitoring, and response. RAPs are often required deliverables on complex contracts and demonstrate the contractor's proactive approach to managing uncertainty. Effective RAPs include risk identification methodologies, risk categorization schemes, probability and impact assessments, mitigation strategies, and triggers for risk response activation. Regular risk assessment updates track how risks evolve throughout contract performance. Strong risk management practices documented in RAPs support successful program execution and positive past performance evaluations.

Read more

RBM

Management approach

Results-Based Management

Results-Based Management is a management strategy focused on achieving defined outcomes and using performance information to improve decision-making. RBM emphasizes accountability for results rather than activities, aligning resources and processes with measurable objectives. Government agencies increasingly apply RBM principles to contract management, defining clear outcomes, establishing performance metrics, and evaluating contractors based on achieved results rather than compliance with prescribed processes. RBM aligns with performance-based acquisition strategies and supports the shift from prescriptive to outcome-oriented contracting approaches.

Read more

RGM

Government role

Requiring Government Manager

A Requiring Government Manager is the government official responsible for defining requirements and overseeing the technical aspects of contract performance from the customer organization's perspective. The RGM represents the end user's interests and ensures contractor deliverables meet operational needs. RGMs work closely with Contracting Officer's Representatives and program managers but focus specifically on ensuring requirements are properly defined and contractor performance meets user expectations. Building strong relationships with RGMs helps contractors understand evolving needs and deliver solutions that satisfy actual operational requirements.

Read more

SIP

Information system

Schedule Input Program

A Schedule Input Program is a software application or standardized process used to submit contractor schedule data to government program management systems. SIPs enable consistent formatting and electronic transfer of Integrated Master Schedule data for analysis and reporting. SIP tools validate schedule data against required formats and business rules before submission, reducing errors and rework. Contractors on major programs must often submit schedule updates through designated SIPs that feed government earned value and program management systems. Understanding SIP requirements and maintaining compliant schedule data is essential for programs requiring formal schedule reporting.

Read more

TLO

Government role

Task Lead Officer

A Task Lead Officer is the government representative responsible for day-to-day oversight and coordination of work performed under a specific task order. The TLO serves as the primary point of contact for contractor task order performance, similar to a COR role but specific to individual task orders. TLOs monitor progress, review deliverables, coordinate with the contractor's task lead, and report performance issues to the Contracting Officer. On large IDIQ contracts with multiple concurrent task orders, each task order may have a designated TLO while a program-level COR maintains overall contract oversight. Effective TLO relationships are essential for successful task order performance.

Read more

TTP

Planning document

Test and Transition Plan

A Test and Transition Plan is a document describing how contractor solutions will be tested, validated, and transitioned into operational use. TTPs address testing methodologies, acceptance criteria, transition activities, training requirements, and cutover procedures. TTPs are critical deliverables for system development and IT modernization contracts where successful transition from development to operations determines program success. Well-developed TTPs identify transition risks, define roles and responsibilities, establish success criteria, and plan for contingencies. Government evaluators assess TTP quality as an indicator of contractor understanding and likelihood of successful deployment.

Read more

UHF

Technical specification

Ultra High Frequency

Ultra High Frequency refers to the radio frequency band from 300 MHz to 3 GHz, used extensively in military communications, satellite systems, and tactical networks. UHF specifications appear in defense contracts for communications equipment, radios, and related systems. UHF communications capabilities are common requirements in defense and public safety contracts. Contractors providing communications systems, equipment maintenance, or spectrum management services should understand UHF technical requirements and regulatory considerations. UHF systems often require frequency coordination and compliance with spectrum management regulations.

Read more

WIT

Project management tool

Work Item Template

A Work Item Template is a standardized format or structure used to define and track discrete units of work within project management and workflow systems. WITs establish consistent fields, attributes, and processes for capturing work requirements, assignments, status, and completion criteria. In government IT and agile development contracts, WITs may be required deliverables or specified in contract data requirements. Templates ensure consistent work tracking across teams and enable meaningful reporting on progress and productivity. Understanding customer WIT requirements helps contractors configure their project management tools and processes for contract compliance.

Read more

WMA

Information system

Workforce Management Application

A Workforce Management Application is software used to manage employee scheduling, time tracking, attendance, labor forecasting, and workforce optimization. WMAs help organizations align staffing levels with workload demands and ensure compliance with labor regulations. Government contracts for WMA systems or services support agency human capital management functions. Contractors providing staffing services may be required to use government-specified WMAs for timekeeping and attendance. Understanding WMA capabilities and integration requirements is important for both technology providers and service contractors managing labor-intensive contracts.

Read more

ACTEDS

Training program

Army Civilian Training, Education, and Development System

The Army Civilian Training, Education, and Development System is the Army's framework for developing civilian workforce competencies through structured training, education, and career development programs. ACTEDS establishes career paths, training requirements, and development opportunities for Army civilian employees including acquisition professionals. Contractors providing training services to the Army may support ACTEDS program implementation. Understanding ACTEDS helps contractors appreciate Army civilian workforce development priorities and the structured approach to building acquisition competencies within the Army customer base.

Read more

AQL

Quality standard

Acceptable Quality Level

Acceptable Quality Level is the maximum percentage or proportion of defective units or defects that can be considered satisfactory for acceptance sampling purposes. AQL establishes the quality threshold below which delivered products are considered acceptable. AQL specifications appear in contracts for manufactured goods, particularly defense items subject to formal quality assurance procedures. Understanding AQL requirements helps contractors design quality control processes to meet acceptance criteria and avoid lot rejections. AQL sampling plans determine inspection intensity and acceptance/rejection decisions.

Read more

ATR

Review process

After-Action Review

An After-Action Review is a structured review process conducted after a project, event, or activity to capture lessons learned and identify opportunities for improvement. ATRs examine what happened, why it happened, and how future performance can be improved. Government programs may require contractor participation in ATRs following contract completion, major milestones, or significant events. ATR findings inform process improvements and may affect past performance evaluations. Conducting effective ATRs demonstrates commitment to continuous improvement and provides documentation supporting future proposals.

Read more

BIA

Planning document

Business Impact Analysis

A Business Impact Analysis is an assessment that identifies critical business functions and the potential consequences of disruption to those functions. BIA supports continuity planning by quantifying impacts of outages and establishing recovery priorities and timeframes. Government contracts, particularly for IT and mission-critical services, may require BIA documentation as part of continuity of operations planning. BIA identifies recovery time objectives, recovery point objectives, and resource requirements for maintaining essential functions. Strong BIA practices demonstrate contractor commitment to service reliability and risk management.

Read more

BMMP

Program type

Business Management Modernization Program

A Business Management Modernization Program is an initiative to transform and improve an organization's business processes, systems, and capabilities through technology and process improvements. BMMPs address enterprise resource planning, financial management, human resources, and other business functions. Government BMMP contracts support major IT modernization efforts that replace legacy systems with integrated solutions. These programs are typically large, complex, and multi-year efforts requiring strong program management, change management, and technical capabilities. Understanding BMMP scope and challenges helps contractors develop realistic approaches for business transformation engagements.

Read more

BRM

Organizational role

Business Relationship Manager

A Business Relationship Manager is a role focused on developing and maintaining productive relationships between an organization and its stakeholders, partners, or customers. BRMs bridge business needs with service delivery capabilities and facilitate communication and collaboration. In contractor organizations, BRMs may focus on customer relationships, helping maintain engagement between contract performance and business development. Government organizations may designate BRMs to coordinate with industry partners. Effective BRM functions support customer satisfaction, opportunity identification, and long-term partnership development.

Read more

BSM

Program type

Business Systems Modernization

Business Systems Modernization refers to initiatives that upgrade or replace legacy business systems with modern technology solutions to improve efficiency, reduce costs, and enhance capabilities. BSM programs address financial management, human resources, logistics, and other enterprise functions. BSM contracts are complex undertakings requiring expertise in system integration, data migration, process reengineering, and change management. Government BSM efforts often span multiple years and involve significant risk. Contractors pursuing BSM opportunities must demonstrate relevant experience and robust methodologies for managing large-scale transformation programs.

Read more

CAB

Governance body

Change Advisory Board

A Change Advisory Board is a governance body that reviews, evaluates, and approves or rejects proposed changes to IT systems, configurations, or processes. CABs ensure changes are properly assessed for risk, impact, and alignment with business needs before implementation. Government IT contracts often require CAB participation for system changes. Understanding CAB processes helps contractors plan change implementation timelines and prepare appropriate documentation. CAB governance supports system stability and ensures changes are coordinated across stakeholders.

Read more

CAV

Oversight activity

Contractor Assistance Visit

A Contractor Assistance Visit is a government visit to contractor facilities to provide guidance, review systems, assess capabilities, or support problem resolution. CAVs are constructive engagements aimed at improving contractor performance rather than formal audits or investigations. CAVs may address topics such as quality systems, earned value management, security compliance, or manufacturing processes. Contractors should view CAVs as opportunities to demonstrate capabilities and receive expert guidance. Preparing thoroughly for CAVs and implementing recommendations supports positive relationships and improved performance.

Read more

CCB

Governance body

Configuration Control Board

A Configuration Control Board is a governance body that reviews, evaluates, and approves or disapproves proposed changes to system baselines, configurations, or controlled items. CCBs ensure changes are properly assessed and documented before implementation. CCB processes are particularly important in system development and IT contracts where configuration management is critical. Understanding CCB requirements helps contractors plan change proposals and implementation schedules. CCB documentation supports traceability and ensures all stakeholders are aware of baseline changes.

Read more

CDI

Technical issue

Critical Design Issue

A Critical Design Issue is a significant technical problem or risk identified during design review that must be resolved before proceeding to the next development phase. CDIs require focused attention, root cause analysis, and documented resolution. CDI tracking demonstrates program management discipline and supports informed milestone decisions. Contractors should proactively identify and address CDIs rather than allowing them to become late-discovered problems. Effective CDI management builds customer confidence and supports successful program execution.

Read more

CDR

Technical review

Critical Design Review

A Critical Design Review is a major technical review that evaluates the maturity of a detailed design, assesses risk, and determines readiness to proceed with fabrication, manufacturing, or construction. CDR examines whether the design meets all requirements and is producible. CDR is a key milestone in system development programs, typically required before authorizing production activities. Successful CDR demonstrates design completeness, manufacturing readiness, and acceptable technical risk. Contractors must thoroughly prepare for CDR, addressing all design documentation, analysis, and test requirements.

Read more

CEP

Technical specification

Circular Error Probable

Circular Error Probable is a measure of weapon system accuracy, defined as the radius of a circle within which half of all projectiles or missiles are expected to fall. CEP is a key performance specification in weapons system contracts and testing requirements. CEP requirements appear in development and production contracts for precision munitions, missiles, and guided weapons. Understanding CEP specifications helps contractors develop systems that meet accuracy requirements and design test programs to validate performance. CEP improvements are often program objectives in weapons modernization efforts.

Read more

CIP

Process document

Corrective Improvement Plan

A Corrective Improvement Plan is a structured approach for addressing identified deficiencies in processes, systems, or performance. CIPs document the problem, root causes, corrective actions, responsible parties, timelines, and metrics for verifying effectiveness. CIPs may be required in response to audit findings, quality deficiencies, or performance issues. Strong CIP development and execution demonstrates contractor commitment to continuous improvement. Effective CIPs address root causes rather than symptoms and include verification measures to confirm problem resolution.

Read more

CM

Management discipline

Configuration Management

Configuration Management is a discipline that establishes and maintains consistency of a product's performance, functional, and physical attributes with its requirements, design, and operational information throughout its life. CM ensures all changes are properly identified, evaluated, approved, and tracked. CM is essential for complex systems where changes must be controlled to maintain system integrity. CM requirements in contracts specify how baselines are established, changes are processed, and configuration status is maintained. Strong CM practices support quality, traceability, and effective program management.

Read more

CMMI

Process framework

Capability Maturity Model Integration

Capability Maturity Model Integration is a process improvement framework that provides organizations with essential elements of effective processes. CMMI models address development, services, and acquisition domains, with maturity levels indicating organizational process capability. CMMI appraisals assess organizational maturity levels, with higher levels indicating more mature and capable processes. Some government contracts require specific CMMI maturity levels as qualification criteria. Understanding CMMI requirements helps contractors invest appropriately in process improvement and demonstrate organizational capability.

Read more

CMP

Planning document

Configuration Management Plan

A Configuration Management Plan is a comprehensive document that describes how Configuration Management will be implemented for a specific program, project, or contract. CMPs define CM organization, responsibilities, procedures, tools, and activities for establishing and maintaining configuration control throughout the system lifecycle. CMPs typically address configuration identification, change control, status accounting, and audits. Understanding CMP requirements helps contractors develop compliant CM systems and demonstrate capability to manage complex configurations. Well-executed CMPs support system integrity, change traceability, and effective program management.

Read more

CPAM

Guidance document

Contract Performance Assessment Manual

A Contract Performance Assessment Manual provides guidance and procedures for conducting contractor performance assessments and documenting results in CPARS or other evaluation systems. CPAMs establish standards, rating criteria, and processes for consistent performance evaluation. Understanding CPAM guidance helps contractors anticipate evaluation criteria and demonstrate performance effectively. CPAMs specify rating definitions, assessment timelines, and contractor response procedures. Familiarity with CPAM requirements supports proactive performance management and effective responses to assessment findings.

Read more

CPARS-SR

Reporting function

CPARS Statistical Reporting

CPARS Statistical Reporting provides aggregate analysis and metrics on contractor performance assessment data across the federal government. CPARS-SR supports government-wide visibility into contractor performance trends, assessment completion rates, and rating distributions. CPARS-SR data informs policy development and acquisition management decisions. Understanding CPARS-SR metrics helps contractors appreciate performance assessment importance and benchmark their ratings against government-wide data. CPARS-SR reports may influence government emphasis on performance evaluation compliance and quality.

Read more

CPM

Project management methodology

Critical Path Method

The Critical Path Method is a project management technique that identifies the longest sequence of dependent activities determining minimum project duration. CPM analysis highlights activities where delays directly impact project completion, enabling focused management attention. CPM scheduling is often required for complex government contracts, particularly construction and systems development. Understanding CPM helps contractors develop realistic schedules, identify risk areas, and manage projects effectively. CPM analysis supports schedule claims, delay analysis, and proactive project management.

Read more

DAT

Testing process

Data Acceptance Test

A Data Acceptance Test is a formal evaluation to verify that data deliverables meet specified requirements for accuracy, completeness, format, and quality. DATs ensure data products conform to contract specifications and are suitable for their intended purpose. DAT procedures typically include sampling methodologies, acceptance criteria, and rejection protocols. Understanding DAT requirements helps contractors develop quality assurance processes for data deliverables. Successful DAT completion is often a prerequisite for data delivery approval and associated payments.

Read more

DM

Management discipline

Data Management

Data Management encompasses the policies, procedures, and practices for collecting, storing, organizing, protecting, and maintaining data throughout its lifecycle. DM ensures data quality, accessibility, security, and compliance with applicable requirements. DM requirements in government contracts address data governance, technical data rights, storage standards, and delivery specifications. Understanding DM obligations helps contractors develop compliant data handling practices. Effective DM supports contract performance, knowledge transfer, and long-term data preservation.

Read more

DOT&E

Government role

Director, Operational Test and Evaluation

The Director, Operational Test and Evaluation is the principal advisor to the Secretary of Defense on operational testing. DOT&E oversees operational test planning and reporting for major defense acquisition programs to ensure systems meet operational requirements. DOT&E assessments significantly influence major program decisions and milestone approvals. Understanding DOT&E role helps contractors appreciate the importance of operational test success. DOT&E reports affect program progression and may identify issues requiring contractor resolution.

Read more

DPI

Performance metric

Data Performance Indicator

A Data Performance Indicator is a metric used to measure and track performance in data-related activities such as quality, timeliness, completeness, and accuracy. DPIs support data governance and continuous improvement of data management practices. DPI tracking helps contractors demonstrate data management effectiveness and identify improvement opportunities. Understanding customer DPI requirements helps contractors develop appropriate metrics and reporting. Strong DPI performance supports overall contract success and customer satisfaction.

Read more

DR

Quality document

Deficiency Report

A Deficiency Report is a formal document identifying a condition that does not meet specified requirements, standards, or expectations. DRs document quality issues, non-conformances, or performance shortfalls requiring investigation and corrective action. DR management is essential for maintaining quality and compliance. Understanding DR processes helps contractors respond effectively to identified issues. Timely DR resolution demonstrates commitment to quality and supports positive performance assessments. DR trends may inform quality improvement initiatives.

Read more

DT

Testing phase

Developmental Test

Developmental Testing is the evaluation of systems or components during development to verify design meets technical specifications and performance requirements. DT occurs earlier in the acquisition lifecycle than operational testing and focuses on engineering performance. DT results inform design decisions and readiness for operational testing. Understanding DT requirements helps contractors plan test programs and demonstrate technical compliance. Successful DT is typically required before progressing to operational test phases.

Read more

ECM

Management discipline

Enterprise Content Management

Enterprise Content Management encompasses strategies, methods, and tools for capturing, managing, storing, preserving, and delivering content and documents related to organizational processes. ECM systems support document control, workflow, and information governance. ECM requirements in contracts address document management, records retention, and information access. Understanding ECM capabilities helps contractors develop compliant content management approaches. ECM solutions support efficient contract administration and regulatory compliance.

Read more

ECP

Change document

Engineering Change Proposal

An Engineering Change Proposal is a formal document proposing a change to the design, configuration, or documentation of a product or system. ECPs describe the proposed change, rationale, impacts, and implementation approach for government evaluation and approval. ECP processes control changes to technical baselines and ensure proper evaluation of change impacts. Understanding ECP requirements helps contractors develop complete proposals and navigate approval processes. Well-prepared ECPs facilitate timely change approvals and minimize disruption.

Read more

EMA

Analysis methodology

Earned Value Management Analysis

Earned Value Management Analysis is the process of analyzing EVM data to assess program performance, identify variances, and forecast future performance. EMA provides insights into cost efficiency, schedule status, and management attention areas. EMA supports informed program management decisions and corrective actions. Understanding EMA techniques helps contractors interpret performance data and respond to customer concerns. Strong EMA capabilities demonstrate management sophistication and support performance improvement.

Read more

EPMO

Organizational unit

Enterprise Program Management Office

An Enterprise Program Management Office provides centralized program management oversight, standards, and support across an organization's portfolio of programs and projects. EPMOs establish methodologies, governance frameworks, and performance metrics for program execution. EPMO guidance affects how programs are managed and reported. Understanding EPMO requirements helps contractors align their program management approaches with customer expectations. EPMO oversight supports consistent program execution and enterprise-level visibility into program performance.

Read more

EVMSI

Implementation process

Earned Value Management System Implementation

Earned Value Management System Implementation refers to the process of establishing and deploying an EVM system that meets government requirements. EVMSI involves system design, tool selection, process development, training, and validation against EIA-748 guidelines. Successful EVMSI requires significant organizational commitment and expertise. Understanding EVMSI requirements helps contractors develop compliant systems efficiently. EVMSI is typically followed by surveillance reviews to verify continued system compliance during contract performance.

Read more

FCA

Audit process

Functional Configuration Audit

A Functional Configuration Audit is a formal examination to verify that a configuration item's actual performance meets its functional and allocated baseline requirements. FCAs ensure systems perform as specified before acceptance. FCAs are typically conducted before production decisions or system acceptance. Understanding FCA requirements helps contractors prepare documentation and demonstrate performance compliance. Successful FCA completion is often a contractual milestone affecting program progression and payments.

Read more

FDR

Technical review

Functional Design Review

A Functional Design Review is a technical review examining whether a system's functional design meets specified requirements and is ready for detailed design development. FDRs assess functional architecture, interface definitions, and requirements allocation. FDR success is typically required before progressing to detailed design phases. Understanding FDR requirements helps contractors prepare thorough review packages. FDRs may be contractual milestones affecting payment and program schedule.

Read more

FMSCR

Review process

FMS Case Review

An FMS Case Review is an evaluation of Foreign Military Sales case implementation status, including financial execution, delivery performance, and case closure progress. FMSCRs ensure proper management of FMS transactions and identify issues requiring resolution. FMSCR findings may affect contractor performance assessments and future FMS opportunities. Understanding FMSCR processes helps contractors maintain strong FMS performance. Regular FMSCRs support effective case management and customer satisfaction with FMS programs.

Read more

GFR

Government role

Government Flight Representative

A Government Flight Representative is a government employee designated to represent the government's interests in flight operations and aircraft-related contractor activities. GFRs provide oversight for flight safety, test operations, and aircraft maintenance. GFR involvement affects flight test and aviation support contracts. Understanding GFR roles helps contractors navigate aviation-related contract requirements. GFR approval may be required for flight operations, maintenance actions, and airworthiness determinations.

Read more

GUI

Technical element

Graphical User Interface

A Graphical User Interface is the visual component of software that enables users to interact with applications through graphical elements rather than text commands. GUI design affects user experience, productivity, and system adoption in government IT systems. GUI requirements appear in IT contracts specifying user interface design and usability standards. Understanding GUI standards helps contractors develop user-friendly applications meeting government requirements. Section 508 accessibility requirements apply to GUI design for government systems.

Read more

IFC

Design milestone

Issued for Construction

Issued for Construction designates design documents that have been approved and released for construction execution. IFC documents represent the final design baseline from which construction proceeds in design-build and construction contracts. IFC release is a significant milestone in design-build projects, transitioning from design to construction phases. Understanding IFC requirements helps contractors manage design-build transitions. IFC document control ensures construction proceeds from approved, current designs.

Read more

KPI

Performance metric

Key Performance Indicator

A Key Performance Indicator is a quantifiable metric used to evaluate success against critical performance objectives. KPIs in government contracts measure contractor performance, service quality, and achievement of program goals. KPI selection and achievement directly affect contract performance ratings and incentive determinations. Understanding KPI requirements helps contractors focus performance improvement efforts. Well-designed KPIs align contractor incentives with government objectives and program outcomes.

Read more

LAT

Testing process

Logistics Acceptance Test

A Logistics Acceptance Test is a formal evaluation verifying that logistics support elements meet specified requirements. LATs assess supportability features, documentation, training, and supply support before system acceptance. LAT success is typically required for logistics system acceptance. Understanding LAT requirements helps contractors prepare logistics deliverables and demonstrate supportability. LAT findings affect warranty obligations and transition to operational support.

Read more

LED

Engineering discipline

Logistics Engineering Development

Logistics Engineering Development involves the engineering activities supporting system supportability, including reliability analysis, maintainability design, and logistics support planning. LED integrates supportability considerations into system design and development. LED activities affect life-cycle costs and operational sustainability. Understanding LED requirements helps contractors develop supportable systems. LED outputs include logistics support analysis, maintenance concepts, and support system designs.

Read more

LER

Knowledge document

Lessons Encountered Report

A Lessons Encountered Report documents experiences, observations, and insights from program execution that may benefit future efforts. LERs capture both positive practices and challenges encountered during contract performance. LER development supports organizational learning and continuous improvement. Understanding LER value helps contractors contribute to knowledge sharing. LER content may inform future acquisitions, proposal development, and program planning.

Read more

IID

Planning document

Incremental Implementation Document

An Incremental Implementation Document details the approach for phased implementation of systems, capabilities, or contract requirements. IIDs specify increments, deliverables, milestones, and success criteria for each implementation phase. IID development supports manageable implementation of complex programs. Understanding IID requirements helps contractors plan phased deliveries and demonstrate progress. IIDs enable government visibility into implementation status and support risk management through incremental approaches.

Read more

IMR

Review process

Implementation Milestone Review

An Implementation Milestone Review is a formal assessment evaluating progress against planned implementation milestones. IMRs verify that implementation activities are on track, identify issues, and confirm readiness to proceed to subsequent phases. IMR success may be required for continued funding or contract progression. Understanding IMR criteria helps contractors prepare for milestone demonstrations. IMRs provide government oversight of implementation progress and support informed decision-making.

Read more

LL

Knowledge management

Lessons Learned

Lessons Learned are documented knowledge gained from experience that can improve future performance on similar activities. LL capture both successful practices and challenges encountered, supporting organizational learning and continuous improvement. LL collection and sharing are often contract requirements. Understanding LL value helps contractors contribute to knowledge management efforts. Effective LL programs prevent repeated mistakes and propagate successful approaches across programs and organizations.

Read more

LSS

Process methodology

Lean Six Sigma

Lean Six Sigma is a methodology combining Lean manufacturing principles with Six Sigma quality management to eliminate waste and reduce variation in processes. LSS applications in government contracts support process improvement and efficiency enhancement. LSS expertise is valued in process improvement and management consulting contracts. Understanding LSS methodologies helps contractors propose effective improvement approaches. LSS certifications demonstrate practitioner competency in structured improvement methods.

Read more

MC

Readiness metric

Mission Capability

Mission Capability is a measure of system readiness to perform assigned missions, typically expressed as a percentage of time or systems available for operations. MC rates are key performance metrics for weapon systems and operational equipment. MC requirements affect sustainment contract design and performance metrics. Understanding MC drivers helps contractors develop effective support strategies. MC improvement is often a primary objective of logistics and sustainment contracts.

Read more

MET

Mission element

Mission Essential Task

A Mission Essential Task is a collective task that an organization must perform to accomplish its mission. METs define required capabilities and drive training, readiness, and resource allocation decisions. MET identification affects contract requirements for mission support services. Understanding customer METs helps contractors align solutions with mission priorities. MET-focused proposals demonstrate understanding of customer operational requirements.

Read more

MMR

Review process

Monthly Management Review

A Monthly Management Review is a periodic assessment of contract performance, program status, and management issues. MMRs provide regular oversight ensuring programs remain on track and issues are identified and addressed promptly. MMR preparation demonstrates management attention to contract performance. Understanding MMR content and format helps contractors provide meaningful status information. MMR participation supports transparency and effective government-contractor communication.

Read more

NRM

Management discipline

Network Requirements Management

Network Requirements Management encompasses the processes for identifying, documenting, and managing network infrastructure and connectivity requirements. NRM supports network planning, capacity management, and service delivery optimization. NRM disciplines help ensure network capabilities meet user needs. Understanding NRM processes helps contractors support network planning activities. NRM documentation supports network design, procurement, and implementation decisions.

Read more

OJT-Plan

Training document

On-the-Job Training Plan

An On-the-Job Training Plan documents the structured approach for training employees through actual work performance under supervision. OJT plans specify training objectives, duration, evaluation criteria, and supervisor responsibilities. OJT plan development may be required for contracts with training components or workforce development requirements. Understanding OJT planning helps contractors meet labor compliance requirements. Effective OJT programs support skill development and employee retention.

Read more

OLA

Service agreement

Operating Level Agreement

An Operating Level Agreement defines the working relationships and responsibilities between internal support groups that enable service delivery. OLAs establish internal commitments supporting external Service Level Agreements with customers. OLA development ensures internal coordination supports contract performance. Understanding OLA requirements helps contractors structure internal service relationships. OLA metrics and reporting align internal operations with customer service commitments.

Read more

ORA

Risk management process

Operational Risk Assessment

Operational Risk Assessment is the systematic process of identifying, analyzing, and evaluating risks to mission operations. ORA supports decision-making by quantifying operational risks and identifying mitigation strategies. ORA capabilities are valuable in performance risk management and mission assurance contracts. Understanding ORA methodologies helps contractors support government risk management programs. ORA expertise differentiates proposals requiring risk assessment services.

Read more

ORR

Review milestone

Operational Readiness Review

An Operational Readiness Review is a formal evaluation determining whether a system is ready for operational deployment. ORRs assess system performance, support capabilities, training completion, and documentation adequacy. ORR preparation is a significant contractor responsibility for system deliveries. Understanding ORR criteria helps contractors plan development and transition activities. Successful ORR completion is typically required before full operational capability declaration.

Read more

OT

Test phase

Operational Test

Operational Test is the formal evaluation of a system under realistic operational conditions to assess effectiveness and suitability. OT results inform production and deployment decisions for defense acquisition programs. OT support is a significant contractor responsibility for defense systems. Understanding OT requirements helps contractors prepare systems and documentation for testing. OT deficiencies may delay production decisions and require corrective action.

Read more

PACE

Planning methodology

Primary Alternate Contingency Emergency

PACE is a communications planning methodology establishing multiple communication paths in priority order. PACE planning ensures mission continuity through redundant communication capabilities. PACE methodology applies to contractor communication planning for critical programs. Understanding PACE requirements helps contractors develop robust communication solutions. PACE plans demonstrate thorough contingency planning in proposals.

Read more

PAM

Evaluation guide

Program Assessment Manual

A Program Assessment Manual provides standardized criteria and procedures for evaluating program performance and compliance. PAMs establish consistent evaluation frameworks across programs and organizations. PAM familiarity helps contractors understand evaluation standards. Program assessment criteria inform performance management priorities. PAM-aligned self-assessments support continuous improvement and audit readiness.

Read more

PBM

Management approach

Performance-Based Management

Performance-Based Management is a systematic approach focusing on achieving measurable outcomes and results. PBM emphasizes accountability, continuous improvement, and data-driven decision-making. PBM frameworks support contract performance management and reporting. Understanding PBM principles helps contractors demonstrate value through measurable results. PBM metrics and reporting align contractor activities with customer priorities.

Read more

PSR

Review process

Program Status Review

A Program Status Review is a periodic assessment of program progress, performance, and health conducted with stakeholders. PSRs evaluate schedule status, cost performance, technical progress, and risk posture. PSR preparation is a significant contractor responsibility for program management. Understanding PSR expectations helps contractors present status effectively. PSR outcomes influence program decisions and customer confidence.

Read more

PVT

Test phase

Production Verification Test

Production Verification Test is formal testing conducted on production units to verify that manufacturing processes produce items meeting design specifications. PVT validates production readiness and quality control effectiveness. PVT planning is critical for contracts transitioning from development to production. Understanding PVT requirements helps contractors prepare manufacturing processes. Successful PVT completion enables full-rate production decisions.

Read more

QA-Plan

Planning document

Quality Assurance Plan

A Quality Assurance Plan documents the systematic activities ensuring that quality requirements are fulfilled. QA plans define quality standards, inspection procedures, corrective action processes, and quality metrics. QA plan development demonstrates commitment to quality outcomes. Understanding QA plan requirements helps contractors develop compliant quality programs. QA plan implementation supports consistent performance and customer satisfaction.

Read more

QC

Quality process

Quality Control

Quality Control encompasses the operational techniques and activities used to verify that quality requirements are met. QC includes inspection, testing, and monitoring of processes and products to identify defects. QC program implementation is essential for contract performance. Understanding QC requirements helps contractors develop effective inspection processes. QC metrics demonstrate quality performance and support continuous improvement.

Read more

QMS

Management system

Quality Management System

A Quality Management System is the organizational structure, procedures, processes, and resources needed to implement quality management. QMS frameworks like ISO 9001 provide standardized approaches to quality assurance. QMS certification may be required for certain government contracts. Understanding QMS requirements helps contractors develop compliant quality programs. QMS implementation supports consistent quality outcomes and customer confidence.

Read more

QSR

Review process

Quarterly Status Review

A Quarterly Status Review is a periodic assessment of contract or program status conducted every three months. QSRs evaluate performance against plans, identify issues, and establish corrective actions. QSR preparation requires comprehensive performance data compilation. Understanding QSR expectations helps contractors present status effectively. QSR outcomes influence customer satisfaction and option exercise decisions.

Read more

QTRR

Review process

Quarterly Technical and Risk Review

A Quarterly Technical and Risk Review is a periodic assessment examining technical progress and risk status. QTRRs evaluate technical performance, emerging risks, mitigation effectiveness, and schedule impacts. QTRR preparation demonstrates technical management maturity. Understanding QTRR requirements helps contractors present technical status comprehensively. QTRR outcomes inform technical direction decisions and risk responses.

Read more

R&R

Management documentation

Roles and Responsibilities

Roles and Responsibilities documentation defines the duties, authorities, and accountabilities assigned to individuals or organizations. R&R clarity prevents confusion, ensures coverage, and supports effective coordination. R&R definition is essential for proposals and project management plans. Understanding R&R requirements helps contractors demonstrate organizational capability. Clear R&R documentation supports effective teaming arrangements and subcontract management.

Read more

RACI

Planning tool

Responsible Accountable Consulted Informed

RACI is a responsibility assignment matrix identifying who is Responsible, Accountable, Consulted, and Informed for each task or decision. RACI charts clarify roles and support effective coordination. RACI development demonstrates organizational planning maturity in proposals. Understanding RACI methodology helps contractors define clear accountability structures. RACI charts support effective project governance and stakeholder management.

Read more

RAM

Engineering discipline

Reliability Availability Maintainability

Reliability, Availability, and Maintainability are system characteristics measuring operational dependability. RAM analysis predicts system performance, identifies improvement opportunities, and supports logistics planning. RAM expertise is valuable for systems engineering and logistics contracts. Understanding RAM requirements helps contractors develop supportable system designs. RAM predictions inform warranty provisions and sustainment planning.

Read more

RASCI

Planning tool

Responsibility Assignment Matrix

RASCI extends RACI by adding Support as a responsibility category for those providing assistance. RASCI matrices provide more granular role definition for complex projects with multiple support relationships. RASCI development clarifies support relationships in proposals. Understanding RASCI application helps contractors define comprehensive accountability structures. RASCI charts support effective coordination in multi-team environments.

Read more

RBI

Inspection methodology

Risk-Based Inspection

Risk-Based Inspection is an inspection methodology prioritizing examination based on risk assessment rather than fixed schedules. RBI focuses resources on higher-risk items while reducing inspection of lower-risk elements. RBI expertise is valuable for maintenance and inspection contracts. Understanding RBI methodology helps contractors optimize inspection programs. RBI approaches improve efficiency while maintaining safety and quality standards.

Read more

RCA-Root

Analysis methodology

Root Cause Analysis Detailed

Root Cause Analysis Detailed refers to comprehensive investigation techniques identifying fundamental causes of problems or failures. RCA methodologies include fishbone diagrams, five-why analysis, and fault tree analysis. RCA expertise demonstrates problem-solving capability in proposals. Understanding RCA techniques helps contractors develop effective corrective actions. Thorough RCA prevents problem recurrence and supports continuous improvement.

Read more

RIR

Management tool

Risk Issue Register

A Risk Issue Register is a comprehensive log tracking identified risks and active issues. RIRs document risk descriptions, assessments, mitigation strategies, and status updates. RIR management demonstrates risk management maturity in proposals. Understanding RIR requirements helps contractors implement effective risk tracking. Active RIR maintenance supports proactive risk management throughout contract performance.

Read more

RM

Staff role

Risk Manager

A Risk Manager is the individual responsible for implementing and maintaining risk management processes. RMs facilitate risk identification, assessment, mitigation planning, and monitoring activities. RM roles are essential for complex programs and contracts. Understanding RM responsibilities helps contractors develop effective risk management approaches. RM expertise demonstrates risk management capability in proposals.

Read more

RMM

Risk tool

Risk Management Matrix

A Risk Management Matrix is a tool displaying risks by probability and impact to support prioritization. RMMs visualize risk portfolio status and guide risk response resource allocation. RMM development demonstrates systematic risk management in proposals. Understanding RMM construction helps contractors communicate risk posture effectively. RMM updates support ongoing risk monitoring and management decisions.

Read more

ROP

Inventory concept

Reorder Point

Reorder Point is the inventory level triggering replenishment action. ROP calculations consider lead time, demand variability, and safety stock requirements to prevent stockouts. ROP management is essential for supply chain and logistics contracts. Understanding ROP methodology helps contractors maintain appropriate inventory levels. Effective ROP systems support contract performance and customer satisfaction.

Read more

RTM

Engineering tool

Requirements Traceability Matrix

A Requirements Traceability Matrix links requirements through design, implementation, and verification. RTMs demonstrate that all requirements are addressed and provide audit trails for requirement satisfaction. RTM development is essential for systems engineering contracts. Understanding RTM methodology helps contractors demonstrate requirements compliance. RTM maintenance supports verification planning and acceptance testing.

Read more

RTS

Certification milestone

Release To Service

Release To Service is the formal authorization allowing a system or product to enter operational use. RTS certification confirms that all requirements, testing, and documentation prerequisites are satisfied. RTS achievement is a major contract milestone for system deliveries. Understanding RTS criteria helps contractors plan development and test activities. RTS preparation requires comprehensive documentation and verification evidence.

Read more

SCM

Management discipline

Supply Chain Management

Supply Chain Management encompasses the planning, execution, and control of material flows from suppliers through delivery to customers. SCM optimization improves efficiency, reduces costs, and enhances responsiveness. SCM expertise is valuable for logistics and acquisition support contracts. Understanding SCM principles helps contractors develop effective supply solutions. SCM capabilities support contract performance and customer satisfaction.

Read more

SCMP

Planning document

Supply Chain Management Plan

A Supply Chain Management Plan documents the strategy and procedures for managing material flows supporting contract performance. SCMPs address supplier management, inventory control, and logistics coordination. SCMP development demonstrates supply chain management capability. Understanding SCMP requirements helps contractors develop comprehensive logistics approaches. SCMP implementation supports efficient material management and risk mitigation.

Read more

SD

Engineering process

System Design

System Design is the process of defining architecture, components, interfaces, and data flows to satisfy system requirements. SD activities translate requirements into implementable technical solutions. SD expertise is essential for systems engineering contracts. Understanding SD methodologies helps contractors develop effective technical approaches. SD documentation supports implementation, testing, and sustainment activities.

Read more

SDD

Technical document

System Design Document

A System Design Document describes the technical architecture, design decisions, and implementation approach for a system. SDDs provide the technical blueprint guiding development and integration activities. SDD development is a key deliverable for systems engineering contracts. Understanding SDD requirements helps contractors produce compliant design documentation. SDD quality affects downstream development efficiency and system quality.

Read more

SE

Engineering discipline

Systems Engineering

Systems Engineering is the interdisciplinary approach to designing, integrating, and managing complex systems throughout their lifecycle. SE processes ensure systems meet stakeholder needs while balancing technical and programmatic constraints. SE capabilities are highly valued in defense and federal contracting. Understanding SE principles helps contractors develop effective technical solutions. SE expertise differentiates proposals for complex system acquisitions.

Read more

SOM

Operations document

Service Operations Manual

A Service Operations Manual documents standard operating procedures for service delivery. SOMs define processes, workflows, responsibilities, and quality standards for consistent service performance. SOM development demonstrates operational maturity in proposals. Understanding SOM requirements helps contractors develop comprehensive service approaches. SOM implementation supports consistent quality and efficient service delivery.

Read more

SPC

Quality methodology

Statistical Process Control

Statistical Process Control uses statistical methods to monitor and control processes for quality improvement. SPC identifies variation, detects trends, and supports continuous improvement efforts. SPC expertise is valuable for quality management and manufacturing contracts. Understanding SPC methodology helps contractors implement effective quality controls. SPC capabilities demonstrate process management maturity in proposals.

Read more

SPM

Management process

Supplier Performance Management

Supplier Performance Management encompasses processes for evaluating, monitoring, and improving supplier performance. SPM programs track delivery, quality, and responsiveness metrics to ensure supply chain effectiveness. SPM expertise is valuable for supply chain management contracts. Understanding SPM requirements helps contractors develop effective supplier oversight. SPM capabilities support contract performance and risk mitigation.

Read more

SPR

Status report

System Performance Report

A System Performance Report documents system operational status, performance metrics, and issues. SPRs provide visibility into system health supporting maintenance and improvement decisions. SPR development is common for systems operation contracts. Understanding SPR requirements helps contractors implement effective performance monitoring. SPR quality affects customer visibility and satisfaction.

Read more

SR

Review process

Systems Review

A Systems Review is a formal examination of system design, development, or operational status. SRs evaluate technical progress, identify issues, and support decision-making at program milestones. SR preparation is a significant contractor responsibility. Understanding SR criteria helps contractors prepare effective review presentations. SR outcomes affect program direction and customer confidence.

Read more

SRD

Requirements document

System Requirements Document

A System Requirements Document specifies the functional and performance requirements a system must satisfy. SRDs establish the technical baseline driving design, development, and verification activities. SRD development is fundamental to systems engineering contracts. Understanding SRD methodology helps contractors develop comprehensive requirements documentation. SRD quality affects downstream development efficiency and system success.

Read more

SRR

Review milestone

System Requirements Review

A System Requirements Review is a formal milestone examining the completeness and correctness of system requirements. SRRs verify requirements traceability, feasibility, and adequacy before proceeding to design. SRR preparation demonstrates systems engineering discipline. Understanding SRR criteria helps contractors develop review-ready requirements documentation. Successful SRR completion is prerequisite for design phase entry.

Read more

STAR

Report format

Status Tasks Accomplishments Risks

STAR is a report format presenting current status, ongoing tasks, recent accomplishments, and identified risks. STAR reports provide concise program visibility for management and customer communication. STAR report development supports effective program communication. Understanding STAR format helps contractors present status clearly. STAR reports demonstrate organized program management and transparency.

Read more

SWA

Quality discipline

Software Assurance

Software Assurance encompasses activities ensuring software is free from vulnerabilities and functions as intended. SWA includes secure coding practices, code analysis, testing, and vulnerability management. SWA expertise is essential for software development contracts. Understanding SWA requirements helps contractors implement secure development practices. SWA capabilities differentiate proposals for security-sensitive software systems.

Read more

TAC

Support function

Technical Assistance Center

A Technical Assistance Center provides technical support and expertise to users and organizations. TACs offer help desk services, troubleshooting, and technical guidance for systems and products. TAC operation is common in IT support contracts. Understanding TAC requirements helps contractors develop effective support solutions. TAC performance metrics typically include response time, resolution rate, and customer satisfaction.

Read more

TDP-Rev

Documentation process

Technical Data Package Revision

A Technical Data Package Revision is an updated version of technical documentation reflecting design changes or corrections. TDP revisions maintain configuration control and ensure documentation accuracy. TDP revision management is essential for engineering contracts. Understanding TDP revision processes helps contractors maintain documentation currency. TDP revision control supports configuration management and production accuracy.

Read more

TDS

Strategy document

Test and Demonstration Strategy

A Test and Demonstration Strategy outlines the approach for verifying system performance through testing and demonstrations. TDS documents define test objectives, methods, resources, and schedules. TDS development demonstrates test planning capability. Understanding TDS requirements helps contractors develop comprehensive verification approaches. TDS quality affects test program effectiveness and customer confidence.

Read more

TE

Test activity

Test Event

A Test Event is a scheduled testing activity evaluating specific system capabilities or performance characteristics. TEs are planned activities within the overall test program with defined objectives and success criteria. TE planning is essential for systems development contracts. Understanding TE requirements helps contractors prepare systems and resources for testing. TE execution and reporting demonstrate system performance and maturity.

Read more

TECHEVAL

Evaluation process

Technical Evaluation

Technical Evaluation is the formal assessment of system technical performance under operational or test conditions. TECHEVAL determines whether systems meet technical requirements and performance specifications. TECHEVAL preparation is critical for system acceptance. Understanding TECHEVAL criteria helps contractors ensure systems meet performance requirements. TECHEVAL results affect production and deployment decisions.

Read more

TFT

Maintenance activity

Temporary Fix Task

A Temporary Fix Task addresses immediate issues pending permanent solutions. TFTs provide workarounds or interim fixes while root cause analysis and permanent corrections are developed. TFT management is common in maintenance and support contracts. Understanding TFT processes helps contractors implement effective temporary solutions. TFT tracking ensures temporary fixes are replaced with permanent corrections.

Read more

TIO

Organizational unit

Technical Integration Office

A Technical Integration Office coordinates technical activities across multiple programs, systems, or organizations. TIOs ensure interoperability, resolve technical conflicts, and maintain technical coherence. TIO coordination affects multi-system integration contracts. Understanding TIO functions helps contractors navigate complex technical environments. TIO engagement supports effective integration and interface management.

Read more

TIR

Test documentation

Test Incident Report

A Test Incident Report documents anomalies, failures, or unexpected results discovered during testing. TIRs capture incident details, analysis, and resolution for tracking and corrective action. TIR management is essential for test program execution. Understanding TIR processes helps contractors implement effective incident tracking. TIR analysis supports problem resolution and product improvement.

Read more

TL

Staff role

Team Lead

A Team Lead is the individual responsible for directing and coordinating a team's activities. TLs provide day-to-day supervision, task assignment, and first-line management for team members. TL positions are common across contract labor categories. Understanding TL responsibilities helps contractors develop appropriate staffing structures. TL qualifications typically include technical expertise and leadership experience.

Read more

TMR

Review process

Technical Management Review

A Technical Management Review assesses technical progress, issues, and plans at program milestones. TMRs evaluate technical performance against plans and identify management actions needed. TMR preparation demonstrates technical management capability. Understanding TMR criteria helps contractors present technical status effectively. TMR outcomes affect program direction and customer confidence.

Read more

TP

Planning document

Test Plan

A Test Plan documents the strategy, resources, and schedule for testing system capabilities. TPs define test objectives, methods, responsibilities, and success criteria for verification activities. TP development is essential for systems development contracts. Understanding TP requirements helps contractors develop comprehensive test approaches. TP quality affects test program effectiveness and system acceptance.

Read more

TR

Test documentation

Test Report

A Test Report documents the execution, results, and analysis of testing activities. TRs provide evidence of system performance and verification of requirements satisfaction. TR development is essential for systems development contracts. Understanding TR requirements helps contractors produce effective test documentation. TR quality affects system acceptance and customer confidence.

Read more

TSR

Status report

Task Status Report

A Task Status Report provides periodic updates on task order performance, progress, and issues. TSRs communicate work status, accomplishments, and plans to contracting officers and customers. TSR development is common for task order contracts. Understanding TSR requirements helps contractors provide effective status communication. TSR quality affects customer visibility and satisfaction.

Read more

TTC

Schedule metric

Time To Complete

Time To Complete measures the duration required to finish a task, project, or milestone. TTC tracking supports schedule management, resource planning, and performance measurement. TTC estimation affects proposal schedules and pricing. Understanding TTC factors helps contractors develop realistic schedules. TTC monitoring supports proactive schedule management and customer communication.

Read more

TTL

Schedule metric

Total Time Lapsed

Total Time Lapsed measures the cumulative duration from a reference point to the current date or milestone. TTL tracking supports schedule variance analysis and trend identification. TTL monitoring helps identify schedule performance issues. Understanding TTL patterns supports proactive schedule management. TTL analysis informs corrective actions and schedule recovery planning.

Read more

UG

Documentation type

User Guide

A User Guide is documentation providing instructions for operating or using a system, product, or service. UGs explain features, procedures, and troubleshooting for end users. UG development is a common deliverable for system contracts. Understanding UG requirements helps contractors produce effective user documentation. UG quality affects system adoption and user satisfaction.

Read more

UIP

Planning document

Unit Improvement Plan

A Unit Improvement Plan documents specific actions to enhance organizational capability or performance. UIPs identify improvement objectives, actions, responsibilities, and timelines. UIP support may be required under organizational development contracts. Understanding UIP processes helps contractors provide effective improvement assistance. UIP implementation tracking demonstrates continuous improvement commitment.

Read more

ULS

System concept

Unified Logistics System

A Unified Logistics System integrates multiple logistics functions and data sources into a coordinated framework. ULS approaches improve visibility, efficiency, and coordination across logistics operations. ULS expertise is valuable for logistics transformation contracts. Understanding ULS concepts helps contractors develop integrated logistics solutions. ULS implementation supports improved supply chain performance.

Read more

VAL

Review process

Validation Review

A Validation Review assesses whether requirements, designs, or solutions meet stakeholder needs and intended purposes. VAL activities confirm that the right product or service is being developed. VAL participation supports requirements development contracts. Understanding VAL methodology helps contractors demonstrate requirement satisfaction. VAL results affect acceptance decisions and customer satisfaction.

Read more

VDC

Construction methodology

Virtual Design and Construction

Virtual Design and Construction uses digital models and simulations to plan and coordinate construction projects. VDC enables visualization, clash detection, and construction sequence planning before physical work begins. VDC capabilities are valuable for construction and facilities contracts. Understanding VDC methodology helps contractors propose advanced construction approaches. VDC implementation improves project quality and reduces costly changes.

Read more

VMI

Supply chain approach

Vendor Managed Inventory

Vendor Managed Inventory is a supply chain arrangement where the vendor monitors and replenishes customer inventory. VMI shifts inventory management responsibility to the supplier based on usage data. VMI expertise is valuable for supply chain and logistics contracts. Understanding VMI requirements helps contractors implement effective inventory solutions. VMI arrangements improve supply efficiency and reduce customer burden.

Read more

WAR

Status report

Weekly Activity Report

A Weekly Activity Report summarizes work accomplished, issues encountered, and plans for the upcoming week. WARs provide regular visibility into contract progress and team activities. WAR development is common for services contracts. Understanding WAR requirements helps contractors provide effective status communication. WAR quality affects customer visibility and relationship management.

Read more

WBS-D

Planning document

Work Breakdown Structure Dictionary

A Work Breakdown Structure Dictionary provides detailed descriptions of each WBS element including scope, deliverables, and acceptance criteria. WBS dictionaries ensure common understanding of work package content. WBS dictionary development supports effective project planning. Understanding WBS dictionary requirements helps contractors define work scope clearly. WBS dictionary quality affects earned value management and scope control.

Read more

WIG

Strategy concept

Wildly Important Goal

A Wildly Important Goal is a critical objective requiring focused effort and priority attention. WIG methodology concentrates resources on the most essential outcomes for organizational success. WIG alignment helps contractors focus on customer priorities. Understanding WIG frameworks supports strategic planning and resource allocation. WIG achievement demonstrates delivery of critical value.

Read more

WL

Resource metric

Workload Level

Workload Level measures the volume of work assigned to personnel or organizations. WL assessment supports resource planning, capacity management, and workload balancing. WL analysis affects staffing and resource allocation decisions. Understanding WL patterns helps contractors develop appropriate workforce plans. WL monitoring supports workload management and performance optimization.

Read more

WM

Management discipline

Work Management

Work Management encompasses the planning, scheduling, tracking, and control of work activities. WM systems and processes ensure efficient resource utilization and timely work completion. WM expertise supports operations and maintenance contracts. Understanding WM requirements helps contractors implement effective work control systems. WM capabilities demonstrate operational management maturity.

Read more

WOS

Management system

Work Order System

A Work Order System manages the creation, tracking, and completion of work requests. WOS capabilities support maintenance operations, service delivery, and work status visibility. WOS implementation is common for maintenance and support contracts. Understanding WOS requirements helps contractors develop effective work management solutions. WOS integration supports efficient operations and reporting.

Read more

WP-Detail

Planning element

Detailed Work Package

A Detailed Work Package provides comprehensive task-level planning including scope, schedule, resources, and budget at the lowest WBS level. WP details support accurate planning and earned value management. WP detail development demonstrates project management maturity. Understanding WP requirements helps contractors develop comprehensive task planning. WP detail quality affects schedule accuracy and cost control.

Read more

WT

Work tracking

Work Ticket

A Work Ticket documents a specific task assignment including work description, priority, and completion requirements. WTs provide task-level tracking for work management and reporting. WT management supports operations and maintenance contracts. Understanding WT processes helps contractors implement effective task tracking. WT data supports performance reporting and workload analysis.

Read more

WV

Performance metric

Work Variance

Work Variance measures the difference between planned and actual work performance. WV analysis identifies schedule and cost deviations requiring management attention and corrective action. WV monitoring supports earned value management. Understanding WV calculation helps contractors identify performance issues early. WV analysis informs corrective actions and performance improvement efforts.

Read more

ZCL

Configuration document

Zero-Change Letter

A Zero-Change Letter formally documents that no changes are required to a baseline document or configuration. ZCLs confirm review completion without modifications and maintain configuration control records. ZCL processing supports configuration management compliance. Understanding ZCL requirements helps contractors maintain proper documentation. ZCL records demonstrate configuration discipline and change control.

Read more

ZL

Baseline concept

Zero-Level Baseline

A Zero-Level Baseline establishes the initial reference point for project planning and performance measurement. ZL baselines define starting conditions against which progress and changes are measured. ZL establishment is essential for earned value management. Understanding ZL requirements helps contractors establish proper performance baselines. ZL accuracy affects meaningful performance measurement and variance analysis.

Read more

ZR

Risk concept

Zero-Residual Risk

Zero-Residual Risk represents a risk management target where all identified risks are fully mitigated. ZR goals acknowledge that complete risk elimination is often impractical but drive thorough risk management. ZR concepts support risk management planning discussions. Understanding ZR limitations helps contractors set realistic risk targets. ZR analysis identifies residual risks requiring acceptance or further mitigation.

Read more