Federal Contract Awards
Showing 1-50 of 20,548+ contract awards
1240BK24F0062
Mod P00004Department of Agriculture
CLOSEOUT MODIFICATION TO DE-OBLIGATE ONLY. THIS MODIFICATION MAKES THE FOLLOWING CHANGES. ITEM 0001 - A SECTION OF THE ROAD COULD NOT BE DONE. THE REMAINING FUNDS OF $321.10 ARE DROPPED FROM THIS PAY ITEM. ITEM 0002 - ABOUT 1 MILE OF LOG OUT WOR
697DCK24C00385
Mod P00001Department of Transportation
QJB PARKING LOT
12445525C0028
Mod P00002Department of Agriculture
WMF GILEAD TRAIL BRIDGE SUPERSTRUCTURE REPLACEMENT
1240BH25F0023
Mod P00001Department of Agriculture
GAOA SELKIRKS TO SURF TRANSPORTATION PACKAGE 1
127EAW25C0040
Mod P00001Department of Agriculture
FOUNTAIN PLACE ROAD REPAIRS FY 25 IS A PROJECT TO REPAIR ROADS DAMAGED DURING TIMBER OPERATIONS AFTER THE CALDOR FIRE RESPONSE. - NO COST MODIFICATION TO EXTEND THE POP
75H70126C00004
Department of Health and Human Services
U&O PAVEMENT (PROJECT PH23UO01C6)
12363N26F4000
Department of Agriculture
OCF BAER SUPPRESSION REPAIRS 12363N26F4000 RAIL RIDGE FIRE, CRAZY CREEK FIRE, AND WILEY FLAT FIRE - OCHOCO NF COR BRYAN KURTZ, CO CHAD BULLOCK
69056722F000034
Mod P00027Department of Transportation
WY NPS YELL 10(23), GRAND LOOP ROAD-OLD FAITHFUL TO WEST THUMB - CORE DRILLING MILLING, SUB EXCAVATION AND PAVING WORK FOR FROST HEAVE REPAIR ALONG WITH WARRANTY WORK OCCURRING ON THE PROJECT.
1240BH25F0038
Mod P00001Department of Agriculture
GAOA ROAD 13 RECONSTRUCTION
12443923D0017
Mod P00002Department of Agriculture
IDIQ ROAD MAINTENANCE CONTRACT FOR THE LEE, NORTH RIVER, JAMES RIVER / WARM SPRINGS, GLENWOOD-PEDLAR, EASTERN DIVIDE, MT. ROGERS AND CLINCH RANGER DISTRICTS LOCATED ON THE GEORGE WASHINGTON & JEFFERSON NATIONAL FOREST
1240LT24F0016
Mod P00002Department of Agriculture
MOD P00002 - INCORPORATES REDESIGN OF BRIDGE BASED ON GEOTECHNICAL INVESTIGATION FROM MOD P00001. ALSO EXTENDS THE POP TO ACCOMMODATE THE REDESIGN AND GOVERNMENT SHUTDOWN.
127EAX26C0003
Department of Agriculture
PROJECT IS TO CONSTRUCT ADDITIONAL PAVED PARKING AREAS AT THE CHINA WALL OHV STAGING AREA. PROJECT INCLUDES BUT IS NOT LIMITED TO, SITE CLEARING AND GRUBBING, GRADING, SAW CUTTING EXISTING ASPHALT, SUBBASE AND BASE PREPARATION, DRAINAGE FEATURES, AGG
6982AF25C000015
Mod P00008Department of Transportation
THIS MODIFICATION REDUCES THE DAYS FOR LIQUIDATED DAMAGES AND PROVIDES FOR A GLOBAL SETTLEMENT AGREEMENT OF THE PROJECT.
1240BK24F0043
Mod P00004Department of Agriculture
BPA CALL "MF-24-7 CEDAR CREEK FIRE ROAD MAINTENANCE
140FGA26C0003
Department of the Interior
LA-BAYOU SAUVAGE NWR-REHAB OBS DECKS
127EAW25C0011
Mod P00002Department of Agriculture
MORATORIUM CLASS EXCEPTION - ROAD TREATMENTS FOR EMERGENCY ROAD STABILIZATION THROUGHOUT THE ANGELES NATIONAL FOREST. NO COST MODIFICATION TO EXTEND THE POP
1240LT25C0036
Mod P00001Department of Agriculture
CRITICAL GAOA PAVING PROJECT TO PROTECT PUBLIC SAFETY, PROTECT EXISTING TRANSPORTATION INFRASTRUCTURE, AND REDUCE AIR BORNE PARTICULATE MATTER. THE AGENCY CONTRACTS THIS WORK BECAUSE IT IS HIGHLY EFFICIENT AND SPECIALIZED CONSTRUCTION.
69056723C000012
Mod P00010Department of Transportation
AK BLM GFO 2019(1), SOURDOUGH CAMPGROUND BRIDGE - CLOSEOUT MODIFICATION
69056722F000034
Mod P00028Department of Transportation
WY NPS YELL 10(23), GRAND LOOP ROAD-OLD FAITHFUL TO WEST FUNDING ACTION TO DE-OBLIGATE FUNDS
693C7325F00032N
Mod P00001Department of Transportation
VA NP ASIS BRG(1) CM #1 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO NOVEMBER 11, 2026
127EAX26F0002
Department of Agriculture
REPLACEMENT OF FAILED CULVERT WITH AN AQUATIC ORGANISM PASSAGE (AOP) ON THE BILTMORE CAMPUS TRAIL IN THE CRADLE OF FORESTRY IN AMERICA. DISASTER AND ERFO PROJECT
1240LT24C0033
Mod P00001Department of Agriculture
REMOVAL OF EXISTING 44' LONG TIMBER BRIDGE AND REPLACE WITH 80' LONG STEEL GIRDER BRIDGE.
1240LU26F0002
Department of Agriculture
THIS PROJECT WILL COMPLETE THE ROAD WORK TO BRING THE ROADS TO SAFE HAUL STATUS FOR THE DEAD POST TIMBER SALE BY REPLACING FAILING CULVERTS, MAINTAINING THE ROAD, AND IMPROVING DRAINAGE. DEAD POST TIMBER SALE IS CRITICAL FOR BOTH THE TIMBER TARGET F
1240BH25F0015
Mod P00001Department of Agriculture
THE PURPOSE OF THIS PROJECT INCLUDES BUT IS NOT LIMITED TO ASPHALT PATCHING, ASPHALT OVERLAY, DITCH CLEANING, AND CULVERT CLEANING AT THE BILLY BOB SNO-PARK.
6982AF25C000021
Mod P00003Department of Transportation
THIS MODIFICATION IS FOR ADDITIONAL WORK TO INSTALL REBAR, CONCRETE FOUNDATION AND CORRECTS AN ADMINISTRATIVE ERROR.
12363N26F0001
Department of Agriculture
PROPOSED WORK INCLUDES THE RESTORATION OF ROADWAY ACCESS FOLLOWING DAMAGE DUE TO WIND AND RAIN FROM HURRICANE HELENE. ROADWAY CLEARING, GRADING AND SURFACE REPLACEMENT ARE THE PRIMARY WORK ITEMS PROPOSED.
12445225F0029
Mod P00001Department of Agriculture
EMERGENCY ROAD REPAIRS TO 1.73 MILES OF ROAN MOUNTAIN ROAD INCLUDING MILLING, PATCHING AND OVERLAYS.
12445126F0001
Mod P00001Department of Agriculture
FY25-001824 APPROVED 9/18/2025 AR OUACHITA NF ROADS REPAIR AND MAINTENANCE
12363N24P4034
Mod P00001Department of Agriculture
THE GOVERNMENT IS IN NEED OF ROAD MAINTENANCE SERVICES AND MINOR REPAIR THAT WILL RESULT IN THE IMPROVED FUNCTIONALITY OF ROADBEDS, DITCH-LINES AND WATER DIVERSION STRUCTURES. THE SERVICES COVERED IN THIS CONTRACT INCLUDE THE FURNISHING OF ALL LABO
12445125F0027
Mod P00001Department of Agriculture
NRE-1974 APPROVED 06/11/2025 ARKANSAS SOUTH OUACHITA USDA ROAD CONSTRUCTION MATOC NO COST EXTENSION- WEATHER 080901C SO CON SPRING BLADING CADDO, WOMBLE, CS, POTEAU, MENA, OK 693820
1240LU25F0048
Mod P00001Department of Agriculture
MODIFICATION P00001 EXTEND POP END DATE AND ADDED WORK WITHIN SCOPE OF WORK FLATHEAD NF RED HAWK ROADS RECONSTRUCTION
140L4325P0179
Mod P00001Department of the Interior
RDO NBHMA WEST ENTRANCE PARKING LOT ASPHALTING FOR THE BLM-ROSEBURG DISTRICT OFFICE, OREGON
70Z03126CALAM0001
Department of Homeland Security
INSTALL GRAVEL PAD IN SUPPORT OF NATIONAL EMERGENCY AT THE SOUTHERN BORDER
36C24124C0079
Mod P00003Department of Veterans Affairs
ASPHALT AND CONCRETE REPAIRS.
693C7324C000012
Mod P00003Department of Transportation
VA NP COLO 1C14, 1D48, 1E15 CM #3 DECREASE CONTRACT AMOUNT BY $43,620.00. NO CHANGE TO CONTRACT TIME FINALIZE QUANTITIES
12445525F0066
Mod P00001Department of Agriculture
WHITE MOUNTAIN NATIONAL FOREST - ROCKY GORGE PATH - STORM REPAIR
12445525F0029
Mod P00001Department of Agriculture
MIDEWIN BOATHOUSE ROAD CULVERT REPLACEMENT
693C7324C000014
Mod P00004Department of Transportation
GA NP CHCH MULTI(1) / 693C7324C000014 - CM #4 THE PURPOSE OF THIS MODIFICATION IS TO: 1. INCREASE THE CONTRACT AMOUNT BY $54,465.81 FROM $5,008,361.26 TO $5,062,827.07. 2. ADDRESS THE ADDITION OF NEW GEOGRID PAY ITEM IN SCHEDULE B FOR STABILIZAT
1240BH25F0003
Mod P00002Department of Agriculture
SIOUXON TRAILHEAD RELOCATION AND ROAD MAINTENANCE
12445525C0004
Mod P00001Department of Agriculture
GAOA: REPLACEMENT OF MONDAY CREEK TRAILHEAD BRIDGE. MOD 01 -- REINCORPORATING EXISTING BEAMS INTO FINAL STRUCTURE.
693C7326F00006N
Department of Transportation
PROJECT NC NP BLRI 2M28; NC NP BLRI 2M29: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 336.7, 336.75, 336.85, 336.95, 337.2, 338.2 AND MP 338.4. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWAL
693C7326F00007N
Department of Transportation
PROJECT NC NP BLRI 2M30: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 342.7, 343.7 AND 343.8. THE WORK INCLUDES SLIDE REPAIRS, CULVERT REPLACEMENT AND CLEANING, STONE MASONRY HEADWALL INSTALLATION, RIPRAP PLACEMENT, CURB AND GUARDRAIL IN
693C7322F00109N
Mod P00004Department of Transportation
NP-BISC 10(2) THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO FINANCIALLY AND CONTRACTUALLY CLOSE THIS TASK ORDER CONTRACT IN ITS ENTIRETY IN THE AMOUNT OF $3,689,240.56.
140F0420C0012
Mod P00007Department of the Interior
REHAB PARKING AREAS AT LOXAHATCHEE NWR SETTLEMENT FUNDING OF $50,000
2023H424P00011
Mod P00001Department of the Treasury
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE $10,550.00 FROM ITEM LINE 0001.
6982AF25F00055N
Mod P00001Department of Transportation
THIS SUPPLEMENTAL AGREEMENT ADDS 78 CALENDAR DAYS TO THE CONTRACT CHANGES THE CONTRACT COMPLETION DATE TO JANUARY 17, 2026. NO CHANGE TO THE CONTRACT AMOUNT OR FUNDING IS MADE AS PART OF THIS AGREEMENT.
6982AF23C000037
Mod P00002Department of Transportation
THIS MODIFICATION IS A GLOBAL SETTLEMENT AGREEMENT BETWEEN FHWA AND EARTH WORK SOLUTIONS TO RESOLVE ALL ISSUES RELATING TO THE CONTRACT. THE GOVERNMENT AGREES TO ADD 37 CALENDAR DAYS TO THE CONTRACT PERIOD OF PERFORMANCE, EXTENDING THE CONTRACT COMPL
1240BF26F0004
Department of Agriculture
YRD ROAD MAINTENANCE AND SNOWPLOWING SERVICES - OPTION PERIOD 2 TASK ORDER FOR SNOWPLOWING SERVICES
1240LU24F0050
Mod P00001Department of Agriculture
MOD 0001 TO GAOA - HUNGRY HORSE CREEK AOP & DETOUR TASK ORDER IS A TIME EXTENSION WITHIN SCOPE TO COMPLETE THE FINAL 10% OF THE PROJECT. EARLY WINTER STORM MADE IT DIFFICULT TO FINISH ON TIME THEREFORE A NEW PERIOD ENDING DATE WILL BE 06/15/2025
1240LT24C0029
Mod P00002Department of Agriculture
CONSTRUCTION. BALD GNA TIMBER SALE ROAD RECONDITIONING. MODIFICATION TO EXTEND POP DUE GOVERNMENT SHUTDOWN.
Explore Related Data
Contract Award Resources
Federal contract award data is sourced from USAspending.gov and updated regularly. Use the filters above to narrow down awards by fiscal year, NAICS code, agency, and state.
Federal Contracting Resources
Learn more about contract awards and federal procurement
Frequently Asked Questions
Find answers to common questions
Articles & Research
In-depth guides and data-driven insights
Glossary
Learn the terminology
Free Tools
Helpful tools for federal contractors