50 awards found
MOD P00002 - INCORPORATES REDESIGN OF BRIDGE BASED ON GEOTECHNICAL INVESTIGATION FROM MOD P00001. ALSO EXTENDS THE POP TO ACCOMMODATE THE REDESIGN AND GOVERNMENT SHUTDOWN.
PERFORM ROADWAY RECONDITIONING ALONG PROJECT LENGTH (7 MILES OF RECONDITIONING FROM MP 21 TO MP 28 OF FSR 101). CRUSH, MIX, HAUL, AND PLACE SURFACE COURSE AGGREGATE ALONG PROJECT LENGTH (7 MILES OF SURFACING FROM MP 21 TO MP 28 OF FSR 101).
BONNALIE LOGGING LLC IDNCF000495 E50
BONNALIE LOGGING LLC IDNCF000495 E50
ERFO RED LODGE AREA BRIDGE REPLACEMENTS & ROAD REPAIRS WPAP 675015
REPLACE MAAH DAAH HEY TRAIL BRIDGE AND MP 143 WHICH IS IN FAILURE MODE AND IS A CRITICAL PART OF THE NATIONALLY RECOGNIZED, POPULAR AND WORLD CLASS NON MOTORIZED TRAIL. THE EXISTING BRIDGE IS LOCATED APPROXIMATELY 1 MILE SOUTH OF THE RECENTLY RENOVAT
UNDER 20% MORATORIUM ACCEPTANCE - CHANGE ORDER INCREASES QUANTITY OF CONCRETE TO REFLECT AMOUNT ACTUALLY USED, DUE TO DIFFERING SITE CONDITIONS DURING UNINTERRUPTABLE PROCESS OF THE AWARD. QUANTITY REQUIRED AND USED WAS WITHIN THE SCOPE OF THE CONTR
BONNALIE LOGGING LLC IDNCF000495 E50
REPLACEMENT OF MORES CREEK BRIDGE. EXISTING BRIDGE HAS SIGNIFICANTLY DEGRADED AND IS BECOMING A PUBLIC SAFETY HAZARD.
GEOTECHNICAL INVESTIGATION AND ANALYSIS: PERFORM A GEOTECHNICAL INVESTIGATION AND PROVIDE RECOMMENDATIONS FOR THE PURPOSE OF A BRIDGE FOUNDATION DESIGN ACCORDING TO AASHTO STANDARDS AND TASK ITEMS PRESENTED IN THIS STATEMENT OF WORK.
DISASTER SUPPLEMENT; DALY CREEK BRIDGE REPLACEMENT AND ROAD REPAIR
SPOTTED DOG & SLATE ROAD GRINDING MODIFICATION P00002 IS TO CORRECT A MISTAKE IN ORIGINAL OFFER.
KERSEY LAKE ROAD FLOOD REPAIRS THAT INCLUDES ROAD RECONDITIONING AND A STREAM CROSSING
TASK ORDER FOR FLTP COPPER CREEK ROAD IMPROVEMENTS ON THE LEWIS & CLARK NATIONAL FOREST
MOD 0003 TO GAOA GREEN BAY CAMPGROUND RENOVATIONS ON THE IDAHO PANHANDLE NATIONAL FORESTS IS A SUPPLEMENTAL AGREEMENT FOR WORK IN SCOPE. SEE SHEET 2 OF THE SF-30 FOR ITEM DETAILS.
THE INTENT OF THIS PROJECT IS TO IMPROVE ROAD DRAINAGE AND RECONDITION NFSR 181 (BLOODY DICK ROAD) ON THE DILLON RANGER DISTRICT OF THE BEAVERHEAD DEERLODGE NATIONAL FOREST. THE WORK INCLUDES BUT IS NOT LIMITED TO; ROAD RECONDITIONING, PLACING BRUSH
MOD 0003 TO GAOA GREEN BAY CAMPGROUND RENOVATIONS ON THE IDAHO PANHANDLE NATIONAL FORESTS IS A SUPPLEMENTAL AGREEMENT FOR WORK IN SCOPE. SEE SHEET 2 OF THE SF-30 FOR ITEM DETAILS.
MODIFICATION 0001 TO ERFO CHICKEN CREEK BRIDGE & WEST ROSEBUD #2072 BRIDGE REPLACEMENTS & ROAD REPAIRS IS A SUPPLEMENTAL AGREEMENT FOR WORK IN SCOPE DUE TO CHANGED SITE CONDITION AT EXISTING CULVERT. SEE PG. 2 OF SF-30 FOR DETAILS.
0413 CONST PINE CREEK #2 CRITICAL REHABILITATION - SCOUR REPAIR OF NFSR 60030 MP 19.7 BRIDGE INCLUDING CONCRETE CUTOFF WALL, RIPRAP, AND CUSTOM STREAM FEATURES.
ST. JOE ROAD IMPROVEMENT TASK ORDER MOD P00003, SUPPLEMENTARY WORK WITHIN THE SCOPE
FERM BPA: BEARTOOTH RANGER DISTRICT ROAD MAINTENANCE TASK ORDER FY25
CONSTRUCTION OF 26' SPAN MULTI-PLATE PIPE ARCH SET ON PRECAST CONCRETE FOOTINGS. UTILIZE THE R4 CIVIL CONSTRUCTION MATOC, ZONE 1. CONTRACT NUNMBERS 1284M820D0016, 1284M820D0019, 1284M82020021.
HLF ENG LRT ADAMS CREEK AOP IMPLEMENTATION
IPF AQUA NZ GROUSE CK RD DECOM FSR 280 PHASE II
SPOTTED DOG & SLATE ROAD GRINDING
PRICE CONTRACTING INC MTBRF024261 E153
GAOA FOREST LAKE ROAD RECONDITIONING HLCNF
BALL CREEK ROAD REPAIR AND RESTORATION
DIRECT THE CONTRACT TO USE AGGREGATE FROM A DIFFERENT GOVERNMENT STOCKPILE. CONTRACTOR IS DIRECTED TO HAUL AGGREGATE FROM STOCKPILE IN THE SPECIFIED QUANTITIES TO COVER THE SHORTAGE FOR COMPLETING WORK ASSOCIATED WITH THE 626/653 ROAD IMPROVEMENTS PR
0412 CONST MOBILE ROCK CRUSHING, BASE
THIS PROJECT IS FOR THE REMOVAL OF EXISTING STEEL PIPE AND INSTALLING NEW SQUASH PIPE.
0402 CONST ROCK CREEK CULVERT REPLACEMENT - UPPER
0412 CONST MANN CREEK CULVERT REPLACEMENT UTILIZING FERM BPA PAYETTE NATIONAL FOREST - REGION 4 - ZONE 4
THE GAOA FOREST LAKE ROAD RECONSTRUCTION PROJECT CONSISTS OF CONDUCTING ROAD RECONSTRUCTION TO FOREST ROAD NO. 66.
THE PROJECT WILL GRIND EXISTING MATERIAL ON ROAD 5635 SODA SPRINGS IN ACCORDANCE WITH SOI AND SOW.
673691 - SKIDWAY CAMPGROUND ROAD RECONDITIONING
BAER: STEEP GULCH CULVERT REPLACEMENT WILL REPLACE AN UNDERSIZED CULVERT TO ALLOW INCREASED FLOWS TO PASS UNDER THE ROAD WITHOUT CAUSING DAMAGE TO THE CROSSING.
MOD 0002 TO GAO GREEN BAY CAMPGROUND RENOVATIONS ON THE IDAHO PANHANDLE NATIONAL FORESTS IS A SUPPLEMENTAL AGREEMENT FOR WORK IN SCOPE.
0412 CONST D6 SF RAMP TRAVEL MANAGEMENT/ROAD DECOMMISSIONING, BASE
WOODS CREEK CULVERT REPLACEMENTS TO ON THE BITTERROOT NATIONAL FOREST
GAOA "500 MILES" ROAD RECONDITIONING ON THE BEAVERHEAD-DEERLODGE NATIONAL FOREST, ACROSS SOUTHWEST MONTANA BASE AWARD + OPTION ITEMS 1,2,4,8,11,12 AND 14
GAOA MEMORIAL WAY ROAD RECONSTRUCTION HELENA-LEWIS & CLARK NATIONAL FOREST
FLAT CREEK CULVERT REPLACEMENT - THIS PROJECT IS FOR THE REMOVAL OF 2 EACH EXISTING 30 DIA. X 45 LONG CORRUGATED METAL PIPES (CMPS) AND INSTALLING NEW 87-WIDE X 63 HIGH X 40 LONG 12 GAUGE ARCH-PIPE (SQUASH PIPE).
HLF GAOA TRD CROW CREEK ROAD IMPROVEMENTS
0402 SIL CONST BOISE BRIDGE 236 REPLACEMENT
HAYES CREEK ROAD CONSTRUCTION AND RECONSTRUCTION
673691 - SKIDWAY CAMPGROUND ROAD RECONDITIONING
HLF JOINT CHIEFS ELKHORN ROAD AND CULVERT WORK
THE PROJECT WILL GRIND EXISTING MATERIAL ON ROAD 5635 SODA SPRINGS IN ACCORDANCE WITH SOI AND SOW.
GAOA "500 MILES" ROAD RECONDITIONING ON THE BEAVERHEAD-DEERLODGE NATIONAL FOREST, ACROSS SOUTHWEST MONTANA BASE AWARD + OPTION ITEMS 1,2,4,8,11,12 AND 14
Business Details
- UEI
- KXVHR7Z986H3
- CAGE Code
- 3DGH0
- Address
- 1237 HANLAN LN
STEVENSVILLE, MT 598706149 - Congressional District