JE FULLER/HYDROLOGY AND GEOMORPHOLOGY, INC.
TEMPE, AZ 85284-2100
Visibility Score
39
Capabilities Narrative
ENGINEERING (CIVIL, ENVIRONMENTAL), HYDROLOGY, FLOOD STUDIES, FLOODPLAIN STUDIES, GEOMORPHOLOGY, RIVER ENGINEERING, SEDIMENTATION, BRIDGE HYDRAULICS, BRIDGE SCOUR, EROSION STUDIES, DRAINAGE, ARCHAEOLOGY - GEOARCHAEOLOGY, HYDROLOGIC MODELING, HYDRAULIC MOD
NAICS Codes
| Code | Description | Primary |
|---|---|---|
| 541330 | Engineering ServicesGeneral $22.50m Small Business Size Standard: [Yes]Special $41.50m Military and Aerospace Equipment and Military Weapons: [Yes]Special $41.50m Contracts and Subcontracts for Engineering Services Awarded Under the National Energy Policy Act of 1992: [Yes]Special $41.50m Marine Engineering and Naval Architecture: [Yes] (4) | |
| 541620 | Environmental Consulting Services |
Past Performance (5 contracts)
Keywords
ALERT, Civil, Drainage, Engineering, Erosion, Flood Warning, Floodplain, Fluvial, Geomorphology, Hydraulics, Hydrology, Rivers, Sedimentation, Dam, Water Resources, Hazard Mitigation, Planning, Studies, Restoration, Stream, Levee, Alluvial Fan
Contact Information
Business Details
- UEI
- UZWAC5DQAUG3
- CAGE Code
- 1UP94
- Year Established
- 1995
- Legal Structure
- Subchapter S Corporation
- Congressional District
- 04