WU & ASSOCIATES INC
MOUNT LAUREL, NEW JERSEY 080541718
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $17.09M | 55 |
| 238290 | $582K | 9 |
| 541330 | $0 | 1 |
Contract Awards
46 awards found
NATIONAL PARK SERVICE (NPS) AT SEQUOIA AND KINGS CANYON (SEKI) WILL REMOVE THE EXISTING HELIBASE BUILDING, WHICH CONSISTS OF THE DEMOLITION OF THE EXISTING BUILDING AND CONSTRUCTION OF THE NEW HELIBASE BUILDING, IN TULARE COUNTY, CALIFORNIA. MODI
NATIONAL PARK SERVICE (NPS) AT SEQUOIA AND KINGS CANYON (SEKI) WILL REMOVE THE EXISTING HELIBASE BUILDING, WHICH CONSISTS OF THE DEMOLITION OF THE EXISTING BUILDING AND CONSTRUCTION OF THE NEW HELIBASE BUILDING, IN TULARE COUNTY, CALIFORNIA.
REPLACE GENERATOR DIESEL
MODIFICATION IS FOR THE FOLLOWING PROPOSED CHANGE ORDER (PCO), PCO 0001, PCO 0002, PCO 0003, PCO 0004 AND PCO 0005.
TOHONO O'ODHAM DETENTION CENTER - PLUMBING FIXTURES UPGRADES
DEMOLITION OF THE EXISTING PRESERVATION OIL (PO) SYSTEM AND CANOPY AT B175 JET ENGINE TEST CELL.
FIRE ALARM REPLACEMENT TOHS
PCO 01 FOR REPAIR OF THE BUCKLING OF THE GYM FLOOR AND VOLLEYBALL LID AREAS.
ZION-TEMPLE OF SINAWAVA DAM REMOVAL-MODIFICATION TO REMOVE ADDITIONAL CONCRETE
REPLACE WAREHOUSE LIGHTS, BLDG. 140, NAS LEMOORE, CA
STEEL FENCING FOR SIHS
STEEL FENCING FOR SIHS
ZION-TEMPLE OF SINAWAVA DAM REMOVAL
B-941 FITNESS CENTER
INSTALL FOD ODN INFRASTRUCTURE PROJECT
RE-ROOF FACILITIES SHOP GREAT SAND DUNES NATIONAL MONUMENT (GRSA)
932, ADMIN GYM INDOOR BASKETBALL COURT NEEDS REFINISHING
STEEL FENCING FOR SIHS
EASTERN NEVADA JUSTICE CENTER - ROOF REPAIR
REPLACE GENERATOR DIESEL
THIS MODIFICATION IS FOR THE PURPOSE OF INCORPORATING FINA CONSTRUCTION CHANGES INTO THE GENERAL CONTRACTORS CONTRACT FOR THE ELEVATOR MODERNIZATION AT THE HAROLD WASHINGTON SOCIAL SECURITY ADMINISTRATION OFFICE IN CHICAGO ILLINOIS.
REHABILITATE VISITOR CENTER VIEW BUILDING THE PURPOSE OF THIS BILATERAL MODIFICATION P00003 IS TO CHANGE THE FUNDING ACCOUNTS FOR WORK ASSOCIATED WITH MODIFICATION P00001. THIS MODIFICATION ALSO PROVIDES ADDITIONAL FUNDING FOR THE COMPREHENSIVE E
REHABILITATE VISITOR CENTER VIEW BUILDING THE PURPOSE OF THIS BILATERAL MODIFICATION P00001 IS FOR ADDITIONAL WORK WITHIN SCOPE AND TO EXTEND THE PERIOD OF PERFORMANCE. A. ADDITIONAL IN-SCOPE WORK OF CRACK FILLER REPAIR TO UNFORESEEN CRACKS
REPLACE GENERATOR DIESEL
IMRO LW MABO MATOC 2023 MIN GUAR. PR
REHABILITATE VISITOR CENTER VIEW BUILDING
ELEVATOR INSTALLATION AT NORFORK POWERHOUSE.
THIS MODIFICATION IS TO COMPLETE A COST TRANSFER TO ADEQUATELY DESCRIBE HAZARDOUS MATERIAL WORK THAT WAS COMPLETED ON THE HAROLD WASHINGTON ELEVATOR MODERNIZATION PROJECT AT THE SOCIAL SECURITY ADMINISTRATION BUILDING IN CHICAGO ILLINOIS.
THIS MODIFICATION IS FOR THE PURPOSE OF COMPLETING A COST TRANSFER TO CORRECT INTERNAL ACCOUNTING FOR THE SOCIAL SECURITY ADMINISTRATION ELEVATOR MODERNIZATION PROJECT IN CHICAGO ILLINOIS.
THIS MODIFICATION IS FOR THE PURPOSE OF INCORPORATING CONSTRUCTION CHANGES AND REPAIRS INTO THE GENERAL CONTRACTORS CONTRACT FOR THE ELEVATOR MODERNIZATION AT THE HAROLD WASHINGTON SOCIAL SECURITY ADMINISTRATION OFFICE IN CHICAGO ILLINOIS.
MOD A00012 CONDUIT DELAY ONSITE CREW
THIS MODIFICATION IS FOR THE PURPOSE OF ADDING SERVICES TO REMOVE ABANDONED EQUIPMENT IN THE ELEVATOR SHAFTS TO THE GENERAL CONSTRUCTION CONTRACT FOR THE HAROLD WASHINGTON ELEVATOR MODERNIZATION PROJECT IN CHICAGO ILLINOIS.
THIS MODIFICATION #PS0016, IS HEREBY ISSUED TO REFLECT THE SETTLEMENT OF THE CLAIM OF CBCA 6760 WU VS. GSA.
THIS MODIFICATION IS TO INCORPORATE SOME CONSTRUCTION CHANGES INTO THE GENERAL CONTRACTOR CONTRACT FOR THE HAROLD WASHINGTON SOCIAL SECURITY ADMINISTRATION ELEVATOR MODERNIZATION PROJECT IN CHICAGO ILLINOIS.
MOD A00011 ELECTRICAL REROUTE
DEVA 227652, SCOTTY'S CASTLE VISITOR CENTER AND HACIENDA, MODIFICATION 14. THIS MODIFICATION DESCOPES THE FINAL ITEMS DUE TO THE FIRE.
CONTRACT FOR NF, INSTALL POWER PLANT ELEVATOR
P80 ADMIN DESIGN-BUILD
P80 ADMIN DESIGN-BUILD
DEVA 227652, SCOTTY'S CASTLE VISITOR CENTER AND HACIENDA, MODIFICATION 13. THIS MODIFICATION DESCOPES THE DOORS AND WINDOWS, UNFINISHED ITEMS LEFT AFTER THE FIRE RFP 28 AND CLOSES OUT RFP 2, COR 27 CONCRETE CORING AND COR 15 THE EMERGENCY WATER
CONTRACT FOR NF, INSTALL POWER PLANT ELEVATOR. REFERENCE NO. R00009 CC006 UFC DOD REQUIREMENTS
THIS MODIFICATION IS FOR THE PURPOSE OF INCORPORATING AFTER HOURS WORK AND WORK RELATED TO THE CEILING HATCH FOR THE GENERAL CONSTRUCTION CONTRACT FOR THE SOCIAL SECURITY ADMINISTRATION ELEVATOR MODERNIZATION PROJECT IN CHICAGO ILLINOIS.
CONTRACT FOR NF, INSTALL POWER PLANT ELEVATOR REFERENCE NO. R00008 CC009 DIFFERING SITE CONDITIONS FOR ASBESTOS
CONTRACT FOR NF, INSTALL POWER PLANT ELEVATOR REFERENCE NO. R00006 CC008 ADDITIONAL ABATEMENT QUANTITIES
CONTRACT FOR NF, INSTALL POWER PLANT ELEVATOR REFERENCE NO. R00005 CC007 ADD QUANTITIES FOR ASBESTOS ABATEMENT
P80 ADMIN DESIGN-BUILD
Business Details
- UEI
- MLSMLM5BFMW5
- CAGE Code
- 0P2R2
- Address
- 100 GAITHER DR SUITE C
STE C
MOUNT LAUREL, NJ 080541718 - Congressional District
- NJ-03
- Phone
- 8568571639
Parent Company
WU & ASSOCIATES INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov