| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $1.92B | 1,075 |
| 238990 | $5.34M | 5 |
| 236210 | $4.90M | 4 |
| 541990 | $283K | 1 |
| 237990 | $237K | 1 |
| 238220 | $173K | 9 |
| 237310 | $124K | 6 |
Contract Awards
50 awards found
MODIFICATION PS59 ISSUED AS A PRICE TO BE DETERMINED LATER FOR THE EQUIPMENT COSTS ASSOCIATED WITH A SECOND ELECTRICAL RISER FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH.
BILATERAL MODIFICATION IS ISSUED TO INCORPORATE CMR 006 PERFORMANCE OF WORK INTO THE EXISTING TASK ORDER.
STIPEND
MODIFICATION PS58 ISSUED FOR MISCELLANEOUS ADDITIONS FOR WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH.
C115440 THIS MOD IS TO PERFORM MCC STUDY, RECOMMEND REPLACEMENTS, AND BEGIN INSTALLATION. IF THE ACTION DOES NOT OCCUR, IT WILL LEAD TO A NON-FUNCTIONAL AND NON-COMPLIANT BUILDING, RENDERING IT UNOCCUPIABLE.
C115440 THIS MOD IS TO UPGRADE TO 1600A BREAKERS, UPGRADE VAULT 7 AND WEST RISER, AND PERFORM EAST AND WEST VAULT SWITCHGEAR REPAIRS. IF THE ACTION DOES NOT OCCUR, IT WILL LEAD TO A NON-FUNCTIONAL AND NON-COMPLIANT BUILDING, RENDERING IT UNOCCUPIABLE
DESIGN/BUILD RECAPITALIZE CENTRAL STEAM DISTRIBUTIONS AT UNITED STATES COAST GUARD ACADEMY, NEW LONDON, CT
C115441 THIS MOD INCORPORATES PRE-ACTION SPRINKLER SYSTEM FOR VAULTS 8 AND 9, AND VAULT 9 UPGRADE TO ELECTRICAL INFRASTRUCTURE. IF THE ACTION DOES NOT OCCUR, IT WILL LEAD TO A NON-FUNCTIONAL AND NON-COMPLIANT BUILDING, RENDERING IT UNOCCUPIABLE.
MODIFICATION PS57 ISSUED FOR MISCELLANEOUS ADDITIONS FOR SUPPLEMENTAL WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH.
C100883 MOD.IS TO INCORPORATED VARIOUS CHANGE NOTIFICATIONS. THE PROCUREMENT IS ESSENTIAL & ALLOWED TO PROCEED AS CONSTRUCTION CHANGE ODER. THE PROJECT WOULD NOT BE COMPLETE & USABLE WITHOUT THIS MOD.
MODIFICATION P00007 IS ISSUED TO ADDRESS DIFFERING SITE CONDITIONS.
C100883: THE SUBJECT CONTRACT IS MODIFIED TO INCORPORATE UNILATERAL MOD. P00008. THE PROCUREMENT IS ESSENTIAL & ALLOWED TO PROCEED AS CONSTRUCTION CHANGE ODER. THE PROJECT WOULDN'T BE COMPLETE & USABLE WITHOUT MOD.
MOD IS CREATED TO TO PROVIDE FUNDS FOR CES 004, 005, 007, 023, 026, 029, 037, 039, 041R2, 053, 070, 072, 076, 077, 081, 087, 088R1, 089, 090R1, 092, 094R1, 095, 097, 099, 100, 101, 103R1, 106, 107, 108, 109, 110, 111, 114, 115, 116, 118, 119
C100663: THE SUBJECT CONTRACT IS HEREBY MODIFIED TO INCORPORATED MULTIPLE CNS REQUIRED TO ACCOMMODATE EXISTING CONDITIONS AND DESIGN CHANGES NECESSARY TO ENSURE THE PROJECT IS CONDUCTED TO NIH REQUIREMENTS.
PHASE 7 & 8 FLOOR MODERNIZATION DE-OBLIGATION LOCATED AT THE RONALD REAGAN BUILDING 1300 PENNSYLVANIA AVE, NW WASHINGTON, DC
MODIFICATION P00015 IS ISSUED TO INCORPORATE CMR 010 - HURRICANE MILTON PAVEMENT/EROSION CONTROL REPAIRS/ELECTRICAL SHORE TIE.
TECHNICAL ACCEPTANCE OF PROPOSAL FOR KITCHEN FFE AND PERIOD OF PERFORMANCE EXTENSION FROM 9.30.2025 TO 3.17.2026
BILATERAL MODIFICATION IS ISSUED TO INCORPORATE REA 002 PERFORMANCE OF WORK INTO THE EXISTING TASK ORDER.
W-T WBER COR-028, COR-029 T&M, HAZARDOUS MATERIAL ALLOWANCE AND CHANGE IN POP.
NZP-DC RENEW CHEETAH CONSERVATION STATION AFRICA TRAIL (CCS-AT)
IDIQ MATOC FOR G-10 RENOVATIONS
BILATERAL MODIFICATION IS ISSUED TO INCORPORATE REA 002 PERFORMANCE OF WORK INTO THE EXISTING TASK ORDER.
IDIQ MATOC TO DIGITAL MEDIA CENTER RENOVATION.
IDIQ MATOC TASK ORDER FOR XRAY DOOR REPAIR AND REPLACEMENT
POWELL ENVELOPE CONSTRUCTION PROJECT - POWELL FEDERAL BUILDING, RICHMOND, VA. MODIFICATION INCORPORATES ADDITIONAL RFP'S REQUIRED FOR CONTRACT COMPLETION.
NZP-DC RENEW CHEETAH CONSERVATION STATION AFRICA TRAIL (CCS-AT)
USAID PHASE 7 & 8 DEOBLIGATION AND ADDITIONAL WORK AT THE RONALD REAGAN BUILDING
MOD PS56 ISSUED FOR MISCELLANEOUS ADDITIONAL WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH.
MODIFICATION PS0053: INCORPORATE CE5041. CONSTRUCTION MANAGER AS CONSTRUCTOR FOR VETERANS BENEFITS ADMINISTRATION RENOVATION BACKFILL PROJECT, CELEBREZZE FEDERAL BUILDING, CLEVELAND, OH
THIS MODIFICATION IS ISSUED TO INCORPORATE CMR 009: OPC MOORING FEASIBILITY & LIGHT POLE.
DESIGN-BUILD CONSTRUCT NEW C-130J TENSION MEMBRANE HANGAR AT AIR STATION BARBERS POINT IN KAPOLEI, HI (TAS: 7021/250613)
MODIFICATION PC55 ISSUED AS A PRICE TO BE DETERMINED LATER, FOR A STUDY TO DETERMINE IF A SLIGHTLY LARGER ELEVATOR COULD BE INSTALLED RATHER THAN THE CURRENT IN CONTRACT, FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX IN TOLEDO, OH.
B280 STRENGTH & CONDITIONING COMPLEX (SCC)
MOD P00006: ADD LINE FOR CMR 004 BRICK REPAIR.
MODIFICATION PS0052: INCORPORATE CE5039.01 UNDER DOMESTIC WATER SYSTEM REPLACEMENT, CELEBREZZE FEDERAL BUILDING, CLEVELAND, OH
POWELL ENVELOPE CONSTRUCTION PROJECT - POWELL FEDERAL BUILDING, RICHMOND, VA. MODIFICATION INCORPORATES CREDITS AND ADDITIONAL RFP'S REQUIRED FOR CONTRACT COMPLETION.
PCO 024 - BUILDING 1 MAIN ENTRANCE CANOPY
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE REA-12 AND CMR-76 FOR THE VALUE OF $70,392.93. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
MODIFICATION PS54 ISSUED FOR ADDITIONAL SUPPLEMENTAL WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH.
PCO 016 - CREDIT MOD RESPONSES TO RFI D-0085 AND RFI C-0022
CERCLA CLEAN-UP EFFORT AND WATERFRONT RECAPITALIZATION AT BASE SEATTLE TO SUPPORT THE HOMEPORTING OF NEW USCG POLAR SECURITY CUTTERS.
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CMR 010 FOR ADDITIONAL PILE REMOVAL.
TARGETING CENTER BUILDING, JBLE PAYMENT OF SETTLEMENT AGREEMENT
P495 - DESIGN-BUILD, CHAMBERS FIELD MAGAZINE RECAP, PHASE I, NAVAL STATION NORFOLK, NORFOLK, VIRGINIA
TECHNICAL ACCEPTANCE OF WORK FOR REA 6: REPLACE THE DEAD BREAK ELBOWS, AND RE-TEST THE CABLES AND CONDUCTORS.
DESIGN-BUILD CONSTRUCTION SERVICES TO COMPLETE THE SITKA WATERFRONT IMPROVEMENTS AT US COAST GUARD STATION SITKA IN SITKA, AK (PN 7198749)
PCO 015 FINAL FF E PACKAGE DATED 7/9/2025 REV 2
MINIMUM GUARANTEE FOR W9127825D0038 WHITING-TURNER
P-913 COMMUNICATION CENTER AT NAVAL STATION NORFOLK, NORFOLK, VA
MODIFICATION PS53 ISSUED FOR THE INCORPORATION OF THE ANNEX LIGHTING CONTROL SYSTEM FOR THE ART IN ARCHITECTURE INSTALLATION FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH.
Business Details
- UEI
- VEP4UN7LDMK5
- CAGE Code
- 0DW43
- Address
- 300 E JOPPA RD
BALTIMORE, MD 212863020 - Congressional District
- MD-02
- Phone
- 4104942756
Parent Company
WHITING-TURNER CONTRACTING COMPANY, THE
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov