WEST COAST CONTRACTORS, INC.
DBA: WEST COAST CONTRACTORS INC
COOS BAY, OREGON 974206386
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 237310 | $14.22M | 23 |
| 236220 | $10.04M | 26 |
| 237990 | $7.04M | 37 |
| 238220 | $614K | 5 |
| 238990 | $34K | 2 |
| 238190 | $5K | 1 |
Contract Awards
47 awards found
THE PURPOSE OF THIS CONTRACT MODIFICATION (CM) IS TO DE-OBLIGATE REMAINING FUNDS ($107,652.34) AND CLOSEOUT THE CONSTRUCTION CONTRACT.
CA ERFO NP YOSE 2023-2(1) JOHN MUIR TRAIL ICE CUT CONSTRUCTION CONTRACT
THE PURPOSE OF THIS TASK ORDER IS TO REPLACE THE TRAIL BRIDGE IN THE ANSEL ADAMS WILDERNESS AREA OF THE INYO NATIONAL FOREST LOCATED IN MADERA COUNTY, CALIFORNIA.
CA ERFO NP SEKI 2023-2(2) CRYSTAL CAVE REPAIRS CRYSTAL CAVE PERMANENT ROAD CONSTRUCTION REPAIRS
MULTIPLE AWARD TASK ORDER CONTRACT-INDEFINITE DELIVERY/INDEFINITE QUANTITY
GRAND FORKS AFBS BUILDING B542 IS AT 560 EIELSON STREET. THIS PROJECTS WORK WILL REMOVE THE BUILDINGS TWO COMPUTER ROOM AIR CONDITIONING (CRAC) UNITS 1.7 AND 1.8 FROM ROOM 136.
MULTIPLE AWARD TASK ORDER CONTRACT-INDEFINITE DELIVERY/INDEFINITE QUANTITY
THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO DE-OBLIGATE REMAINING FUNDS, $7,093.02, AND CLOSING OUT THE CONSTRUCTION CONTRACT.
MOD FOR BOILER UPGRADE.
MOD FOR ADDITIONAL WORK.
MULTIPLE AWARD TASK ORDER CONTRACT-INDEFINITE DELIVERY/INDEFINITE QUANTITY. THIS PROJECT IS TO REMOVE THE EXISTING CRAC UNIT PUMPS AND INSTALL TWO NEW EQUALLY SIZED PUMPS PER CRAC. THERE ARE 21 PUMPS SERVING 11 CRACS AND 22 PUMPS WILL BE INSTALLED.
MULTIPLE AWARD TASK ORDER CONTRACT-INDEFINITE DELIVERY/INDEFINITE QUANTITY
CRANE OPERATIONS FOR HELO HOIST
REPAIRS TO SMALL BOAT STATION PILINGS CLOSE TO FAILURE
EMERGENT REPAIRS TO BOAT HOUSE PILING THAT HAS RISK OF FAILING
SUPPLEMENTAL WORK WITH SCOPE OF WORK: INCREASE QUANTITY.
MULTIPLE AWARD TASK ORDER CONTRACT-INDEFINITE DELIVERY/INDEFINITE QUANTITY PLEASE REFER TO APPLICABLE ATTACHMENTS TO THIS TASK ORDER FA465924F0054.
MATOC IDIQ THE PURPOSE OF THIS PROJECT IS TO INSTALL A DUCTLESS MINI-SPLIT AIR CONDITIONING SYSTEM (MINI-SPLIT AC SYSTEM) AND RELATED COMPONENTS IN ALARM ROOM 119 IN GRAND FORKS AFBS BUILDING 339 AT 463 STEEN BLVD, GRAND FORKS AFB, ND 58205.
MATOC / IDIQ GRAND FORKS AFBS BUILDING 313 IS AT 375 STEEN BOULEVARD. THIS PROJECTS WORK WILL REMOVE THE FACILITYS EXISTING BOILER AND INSTALL TWO EQUALLY SIZED NATURAL GAS BOILERS DESIGNED TO THE HEATING REQUIREMENTS OF THE FACILITY.
SAND CREEK CULVERT REPLACEMENT BLM MEDFORD DISTRICT, OREGON
MULTIPLE AWARD TASK ORDER CONTRACT-INDEFINITE DELIVERY/INDEFINITE QUANTITY
IRA HINSDALE PEDESTRIAN BRIDGE REPLACEMENT
BILATERAL MODIFICATION TO ADJUST UNIT QUANTITIES. THE FINAL COMPLETION DATE REMAINS UNCHANGED AS 6/28/2024.
GAOA_PARKINGLOTCRACKSEAL_MEDFORD
LOFTON FISHING PIER REPLACEMENT
BELCOURT REPLACE STEAM BOILER DESIGN BUILD
MULTIPLE AWARD TASK ORDER CONTRACT-INDEFINITE DELIVERY/INDEFINITE QUANTITY. THIS PROJECT IS TO REMOVE THE EXISTING CRAC UNIT PUMPS AND INSTALL TWO NEW EQUALLY SIZED PUMPS PER CRAC. THERE ARE 21 PUMPS SERVING 11 CRACS AND 22 PUMPS WILL BE INSTALLED.
FY24 OVERHEAD - IDIQ THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE THE $10,000 MINIMUM GUARANTEE FOR THE IDIQ CONTRACT. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. THIS ADMINISTRATIVE MODIFICATION UPDATES CLIN 00002 TO REFLECT F
THIS PROJECT IS TO REMOVE THE NONCONDENSING BOILER AND REPLACE WITH A CONDENSING BOILER IN GRAND FORKS AFBS BUILDING 201 AT 511 HOLZAPPLE STREET.
BILATERAL MODIFICATION TO INCREASE UNIT QUANTITIES OF WORK AND EXTEND THE PERIOD OF PERFORMANCE FROM 3/30/2024 TO 6/30/2024.
REPAIR/RENOVATE MAIN ENTRYWAY MILITARY FAMILY READINESS CENTER B207
BOILER INSTALLATION FOR 319 FINANCE BUILDING 101 AT GRAND FORKS AIR FORCE BASE.
CA ERFO FS ELDOR 2021-02(4) ALDER CREEK BRIDGE ERFO DAMAGE REPAIRS
CA ERFO FS SEQUI 2021-02(2) POWDERHORN BRIDGE
UDO DEOBLIGATION - CARPENTER CREEK CULVERT REPLACEMENTS, BLM COOS BAY DISTRICT, OREGON, DEOBLIGATION
CALIFORNIA ROAD & BRIDGE CONSTRUCTION MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR ROAD AND BRIDGE CONSTRUCTION.
NESTUCCA BYWAY SLOPE REPAIR MP 13.1 & DA
C EMERG ESR ALMEDA ROAD GEO HAZ
MATOC POST AWARD CONFERENCE ATTENDANCE
BLM NORTHWEST OREGON DISTRICT GAOA SMITH CREEK PAVING & TRIBUTARY BRIDGE
BLM NORTHWEST OREGON DISTRICT GAOA CROOKED CREEK TRIBUTARY AQUATIC ORGANISM PASSAGE CULVERT REPLACEMENT, LINN COUNTY, OR
CARPENTER CREEK CULVERT REPLACEMENTS
GAOA SPRAGUE TANK REMOVAL
BOULDER CREEK SLIDE REPAIR, BLM ROSEBURG DISTRICT OREGON
THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDS AND CLOSE OUT THE CONTRACT.
MURPHY GULCH BRIDGE REPLACEMENT - DEOBLIGATION
BRIDGE REPAIRS PHASE 1 BLM COOS BAY DISTRICT OFFICE, OREGON
Business Details
- UEI
- E2L8M92EYXL7
- CAGE Code
- 08BT4
- Address
- 61050 HWY 101
COOS BAY, OR 974206386 - Congressional District
- OR-04
- Phone
- 5412677689
Parent Company
WEST COAST CONTRACTORS, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov