VELOCITY/CFM JV, LLC
SAN ANTONIO, TEXAS 782082038
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $4.10M | 52 |
Contract Awards
25 awards found
RND-DS-INSTALL 12 SM DIVERSE PATH FOR CORE NODE (CN) 990 TO CORE EDGE BUILDING (CEB) 900, JOINT BASE SAN ANTONIO (JBSA)-RANDOLPH, TX
RENOVATE COMMAND SECTION FOR ITAC B2081
ENGINEER, FURNISH, INSTALL, AND TEST JBSA-CAMP BULLIS BLDG. 6104 AND BLDG. 5031 FIBER OPTIC EXPANSION PROJECTS IAW SOW.
B907 HVAC REPLACEMENT SYSTEM AT FSH
RENOVATE COMMAND SECTION FOR ITAC B2081
JOINT BASE SAN ANTONIO (JBSA) NON-COMPLEX CONSTRUCTION (NC2) INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ). THE REPLACEMENT OF TWO (2) COOLING TOWERS AT BLDG 9225, ON JBSA-LACKLAND, TX.
JOINT BASE SAN ANTONIO (JBSA) NON-COMPLEX CONSTRUCTION (NC2) INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ)
JOINT BASE SAN ANTONIO (JBSA) NON-COMPLEX CONSTRUCTION (NC2) INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ)
B581 19TH AF FLOORING
MATOC FY23 REQUIREMENT - WO 171310 - FSIS/FMD2 - 22128140R37 - CONVERT ROOMS 1208 -1210 TO CONFERENCE ROOM MODIFICATION 1 - ADDITIONAL LINE ITEMS AND QUANTITIES
WO 171844 INSTALL 460V / 3 PHASE / 60HZ ELECTRICAL POWER FOR EACH OF TWO NEW DISINTEGRATORS THAT ARE COMING FOR INSTALLATION, HORSEPOWER OF THE MACHINES WILL BE 40HP.EACH.
JBSA-LACKLAND KELLY FIELD RUNWAY RUBBER REMOVAL
REPAINT RUNWAY MARKINGS
WO171589 - FAS/FMD4 - 23128140R10 REASONABLE ACCOMMODATION REQUIREMENT. NEED A STROBE LIGHT ADDED TO THE FIRE ALARM SYSTEM IN ROOM 5930 SO THAT DEAF AND/OR HARD OF HEARING STAFF RECEIVE NOTIFICATION IN THE EVENT OF A FIRE EMERGENCY.
BONA FIDE FY22 REQUIREMENT; WO171146 FSIS/FMD2 22128140R37 THIS PROJECT IS TO ADD THE ELECTRICAL FOR THE CONFERENCE RM. FLOOR AND HIGH WALL OUTLETS FOR TABLE AND MONITORS. OUTLETS FOR SPEAKERS AND PROJECTORS.
MATOC FY23 REQUIREMENT - WO 171310 - FSIS/FMD2 - 22128140R37 - CONVERT ROOMS 1208 -1210 TO CONFERENCE ROOM
THE PURPOSE OF THIS PROJECT IS TO REMOVE AND REPLACE THE EXISTING PUMP AND 7 1/2 HORSEPOWER MOTOR, REMOVE EXISTING 2-INCH STEEL PIPING, AND REPLACE EXISTING AIRLINE TO PUMP LEVEL FOR WATER WELL 4
REMOVAL OF EXISTING CARPET AND REPLACEMENT WITH AN EPOXY FLOORING IN BUILDING 5725, JBSA-LACKLAND
MULTI-WORK BUILDING 592 RENOVATION.
THE PURPOSE OF THIS PROJECT IS TO REMOVE AND REPLACE THE EXISTING PUMP AND 7 1/2 HORSEPOWER MOTOR, REMOVE EXISTING 2 INCH STEEL PIPING, AND REPLACE EXISTING AIRLINE TO PUMP LEVEL FOR WATER WELL 4 LOCATED AT CANYON LAKE, TX.
REMOVE EXISTING FIRE PUMP AND CONTROLLER, JOCKEY PUMP AND CONTROLLER, TWO 6-INCH VALVE AND REPLACE WITH EQUAL OR BETTER. REPAIR CONCRETE PAD AS NEEDED FOR FIRE PUMP.
NOIC ANTENNA ARRAY JBSA CAMP BULLIS
MULTI-WORK BUILDING 592 RENOVATION.
REVISED THE SOW TO FIX A FEW HOLES FOUND IN THE FOUNDATION. ADDED ADDITIONAL FUNDING TO FUND THE EQUITABLE ADJUSTMENT AND EXTENDED THE POP
MESQ DFAC SHORING
Business Details
- UEI
- HT1ZDGHH96N5
- CAGE Code
- 7JSS9
- Address
- 426 SEGUIN ST
SAN ANTONIO, TX 782082038 - Congressional District
- TX-35
- Phone
- 4105332502
Parent Company
VELOCITY/CFM JV, LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov