URBAN ELECTRIC, INC
ALTAMONTE SPRINGS, FLORIDA 327013451
Contract Awards
50 awards found
DE-OBLIGATING THE INSTALLATION FUNDS PER THE FST PMO DUE TO BUDGETARY CONSTRAINTS AND PROJECT COMPLETION DELAYS AT DAL-FT WORTH, TX (BXN) ALS, JCN: 22009439
CHANGE ORDER INCLUDES THE ADDITIONAL REQUIRED HYDRO VAC EQUIPMENT, LABOR (16) HRS. (5) MEN (16) HOURS OF OT, PROJECT DELAYS DUE RELOCATION OF UST SPOILS TO CERTIFIED LANDFILL AND URBAN TO PROVIDE & INSTALL NEW GROUND PLATE FOR ERMS AT JACKSON, M
IIJA FUNDS. CHANGE ORDER BASED ON SITE-SPECIFIC REQUIREMENTS, INCLUDING REMOVAL OF 1,000-GALLON PROPANE TANK, UNDERGROUND SUPPLY FUEL LINES TO THE VAPORIZER/REGULATOR, FUEL MONITORING SYSTEM, FENCE AND CONCRETE DEAD MEN; AND INSTALLATION OF 1,450-GAL
SITE SURVEY AND DESIGN FOR EG LED POWER SYSTEM REPLACEMENT OAHU WAIMANALO, HI (QQI) ASDE JCN:235985
SITE SURVEY AND DESIGN FOR THE 2025 OUTDOOR EG BASELINE AT AGANA, GU (GUMC) RTR JCN:22002410
POWER SYSTEM MODIFICATION DESIGN AND TRANSFORMER INSTALLATION PROJECT AT JAX ATCT JCN 20000125
IIJA FUNDS: DE-OBLIGATION DUE TO THE FST PMO OFFICE THE TANK WAS RECENTLY REPLACED AND NOT DUE FOR REPLACEMENT. AT DULLES, VA (SGC) ALS JCN: 22008403
SITE SPECIFIC INSTALLATION COST TO INCLUDING REMOVAL OF THE EXISTING 175KW INDOOR EG, SUPPLY AND RETURN UNDERGROUND FUEL LINES, (1) 2,500-GALLON DIESEL UST, CONCRETE SUPPORT PAD AND FUEL MONITORING SYSTEM; AND INSTALLATION OF A NEW OUTDOOR 200KW EG,
IIJA FUNDS. SITE SPECIFIC INSTALLATION INCLUDES THE REMOVAL OF 1,000-GALLON AST, ABOVEGROUND SUPPLY AND RETURN FUEL LINES TO THE DAY TANK, DAY TANK REMOVAL, FUEL MONITORING SYSTEM, (13) BOLLARDS, AND CONCRETE FST PAD; AND INSTALLATION OF 1,000-GALLON
IIJA FUNDS. SITE SPECIFIC INSTALLATION COST TO INCLUDE THE REMOVAL OF 1,000-GALLON AST, ABOVEGROUND SUPPLY AND RETURN FUEL LINES TO THE DAY TANK, DAY TANK REMOVAL, FUEL MONITORING SYSTEM, (2) BOLLARDS, (1) LIGHT POLE AND THICKER CONCRETE FST PAD; AN
ADDING THE 2025 DIESEL BASELINE FOR THE TRAVEL, SITE SURVEY REPORT AND DESIGNS, CHANGING THE LOCATION TO COVENTRY, RI (PVDR) ASR JCN: 18028078
SITE SPECIFIC TO INCORPORATE THE ADDITIONAL DESIGN FUNDS FOR CDCB TANK, INSTALLATION COST TO REMOVE OF 4,000-GALLON AND 2,000-GALLON AST, UG AND ABOVEGROUND SUPPLY AND RETURN FUEL LINES, CONCRETE PAD, FUEL MONITORING SYSTEM, AND (7) BOLLARDS. INSTALL
IIJA FUNDS. SITE-SPECIFIC INSTALLATION COST TO REMOVE THE EXISTING 175KW EG AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 200KW EG 120/208V, 3PH IAW THE APPROVED DRAWINGS DATED 1/28/2025 AND THE 2022 125KW EG OUTDOOR BASELINE AND A FULL POWER SYST
IIJA FUNDS, CHANGE ORDER FOR THE DEMOBILIZATION AND REMOBILIZATION DUE TO THE PROJECT DELAYS DUE TO POOR WEATHER CONDITIONS AND RESCHEDULING THE CUTOVER AT WASHINGTON, DC (DCAG) TDWR, JCN: 1503089
IIJA FUNDS. CHANGE ORDER TO INCLUDE ASBESTOS TESTING, REPLACEMENT OF THE CONDUIT AND WIRE FOR THE MAIN SERVICE, AND ADDITIONAL DAYS OF EQUIPMENT AND LABOR REQUIRED FOR THE DEMO OF THE CONCRETE AT CROSSVILLE, TN (QRV) ATCBI JCN: 24011158
IIJA FUNDS. REMOVAL OF THE EXISTING 35KW INDOOR EG, SUPPLY AND RETURN ABOVE GROUND FUEL LINES, (2) 500-GALLON PROPANE AST, CONCRETE SUPPORT PAD AND SIDEWALK, (5) BOLLARDS AND FUEL MONITORING SYSTEM. INSTALLATION OF A NEW OUTDOOR 50 KW EG, UG ELECTRIC
CHANGE ORDER FOR THE EG AND FST DESIGN PACKAGE AND FOR THE FULL POWER SYSTEMS STUDIES AND LABELS (POWER LOAD-FLOW ANALYSIS, SHORT-CIRCUIT ANALYSIS, PROTECTIVE DEVICE COORDINATION ANALYSIS, FULL ARC FLASH RISK ASSESSMENT) FOR THE NEW SYSTEM TO BE INS
IIJA FUNDS: CHANGE ORDER TO ALLOCATE ADDITIONAL DESIGN FUNDING TO INCLUDE REPLACING THE VINYL FLOOR AND EXISTING LIGHTING FIXTURE IN THE EG ROOM, AS WELL AS INCORPORATING AN ADVANCED METERING SYSTEM INTO THE DESIGN PACKAGE FOR RALEIGH, NC (RDUC) ATCT
IIJA FUNDS, FUEL DISPOSAL AND ESCORTING REQUIREMENTS DURING CONSTRUCTION FOR EAST BOSTON, MA (BOSC) ALS, JCN: 1502971
IIJA FUNDS, SITE SPECIFIC PROPANE INSTALLATION AT WASHINGTON, DC (DCAG) TDWR, JCN: 1503089
CHANGE ORDER TO FIX NEC VIOLATIONS. SITE WAS USING PANELS AS PULL BOXES AT BANGOR, ME (BGRA) ATCT JCN:1603000
IIJA FUNDS: SITE SPECIFIC INSTALLATION COST AT KNOXVILLE, TN (TYS) ATCT JCN: 18028292
IIJA FUNDS: CHANGE ORDER THE ADVANCED METER UTILITY OUTAGE AT WILMINGTON, NC (ILM) JCN: 1503279
IIFA FUNDS, SITE SPECIFIC INSTALLATION FUNDS FOR EAST BOSTON, MA (BOSC) ALS, JCN: 1502971
(IIJA) FUNDED SITE SURVEY AND TRAVEL, SITE SPECIFIC: BATTLE MOUNTAIN, NV (BAM) ARSR, JCN:19004378, PER LPGBS, PMO.
NEW THERMOSTAT AND ADVANCED METERING INSTALLATION IAW THE SOW TITLED SOW SITE SURVEY, DESIGN, AND INSTALLATION OF ADVANCED METERS BANGOR, ME (BGRA) ATCT JCN:1603000
SITE SPECIFIC INSTALLATION OF 500-GALLON PROPANE AT EL CAJON CA (SEE) TOWB JCN 18027539
FUNDING FOR POWER SYSTEM MODIFICATION DESIGN PROJECT AT JAX ATCT JCN 20000125
IIJA FUNDS, ONE DAY DELAY DUE TO PRESIDENT JIMMY CARTER REMEMBRANCE DAY AND ONE DAY DELAY DUE TO KOHLER START UP BEING PUSHED BECAUSE SSC DIDN'T HAVE ENOUGH PERSONNEL FOR FT MYERS, FL (RSWA) ASR JCN:22001381
FST CHANGE ORDER TO ADD THE 2024 OUTDOOR EG AND ERMS INSTALLATION BASELINE FOR CHICAGO, IL (TSL) ALS JCN: 18026873
IIJA FUNDS: SITE SPECIFIC INSTALLATION, ERMS AND ADVANCED METERING COST AT WILMINGTON, NC (ILM) JCN: 1503279
IIJA FUNDS (INFRASTRUCTURE INVESTMENT AND JOBS ACT). CHANGE ORDER BASED ON ADDITIONAL REQUIREMENTS AT BATTLE MOUNTAIN (BAM) ARSR JCN: 1501595
THE VOR WAS DECOMMISSIONED, AND THE PROJECT WILL BE CANCELLED AT SIOUX CITY, IA (SUXA) VOR JCN: 18026845
BIL FUNDED LPGBS SITE SPECIFIC: DAYTONA BEACH, FL (DAB)ASR-9 UPGRADE INSTALL (JCN:22009420)
SITE SURVEY & DESIGN FOR POWER SYSTEM REPLACEMENT AT MARY'S PEAK, OR (QSK) RCLR JCN: 22000596
THE PROPANE TANK IS NOT FAA OWNED AND PROJECT IS CANCELLED FOR FORT DODGE, IA (FODA) VOR JCN 22002459.
(BIL) FUNDED LPGBS SITE SPECIFIC: ORLANDO, FL (MCO) ASR-9 INSTALLATION JCN:23000758
BIL FUNDING, SITE SPECIFIC OUTDOOR EG INSTALLATION AND FULL POWER SYSTEM STUDY FUNDING FOR FT MYERS, FL (RSWA) ASR JCN:22001381
BIL FUNDS, 2024 OUTDOOR EG WITH SUBBASE TANK SITE SURVEY/DESIGN/INSTALL FOR WICHITA, KS (TWIA) ALS JCN:19005988
FST SITE SPECIFIC INSTALLATION FOR ONTARIO, CA (ONTD) ASR JCN:18027246
FST SITE SPECIFIC INSTALL FOR BAY POINT, CA (QSM) RCLR JCN: 19001080
(BIL) FUNDED LPGBS SITE SPECIFIC: ORLANDO, FL (MCO) ASR-9 INSTALLATION JCN:23000758
CHANGE ORDER TO REMOVE THE EXISTING CONCRETE SUPPORT PAD AT PENSACOLA, FL (PNS) ASR JCN: 18028064.
BIL FUNDS SITE SPECIFIC LPGBS UPGRADE INSTALLATION AT DAYTONA BEACH, FL (DAB) ATCT JCN:24017065 (OLD JCN 18064951)
(BIL) AND (IIJA) FUNDS LPGBS SITE SPECIFIC: FT. LAUDERDALE, FL (FLL) ASR-9 INSTALLATION UPGRADE JCN:22009429
(BIL) AND (IIJA) FUNDS SITE SPECIFIC: SARASOTA, FL, (SRQ) ASR-9 UPGRADE INSTALLATION JCN:23000770
ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT DAL-FT WORTH, TX (BXN) ALS, JCN: 22009439
ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT DOUGLASTON, NY (QDG) RCLR, JCN: 1503559
UPS DESIGN CHANGE ORDER FOR IMPLEMENTING DESIGN UPDATES TO CONSTRUCTION DRAWINGS IAW THE SOW TITLED "RUSSELLVILLE, AR (QXR) ARSR UPS REPLACEMENT PROJECT". THE ADDITIONAL SOW IDENTIFIES NECESSARY UPDATES TO HELP IMPROVE RELIABILITY, MAINTAIN
*BIL*: INCLUDING SUB-CONTRACTOR INCREASED INSURANCE LIMITS TO MEET NFTA AIRPORT REQUIREMENTS ($14M GENERAL LIABILITY COVERAGE)R AT BUFFALO, NY (BUFA) ALS. JCN: 1502990
Business Details
- UEI
- C4DSLZNYMPV3
- CAGE Code
- 3G7L5
- Address
- 370 CENTER POINTE CIR STE 1196
ALTAMONTE SPRINGS, FL 327013451 - Congressional District
- FL-07
- Phone
- 4073324700
Parent Company
URBAN ELECTRIC, INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov