SYGNOS INC
SAN DIEGO, CALIFORNIA 921225778
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $63.66M | 92 |
| 237110 | $24.07M | 92 |
| 624221 | $23K | 1 |
| 238990 | $15K | 1 |
Contract Awards
50 awards found
PROJECT NO. 691-21-120 WILL PROVIDE A DEDICATED FIRE SUPPRESSION WATER DISTRIBUTION SYSTEM THROUGHOUT THE NORTH CAMPUS.
CONSTURCTION SERVICES FOR THE ENERGY MANAGEMENT CONTROLS INTEGRATION 1, PROJECT NO.. 664-18-320 LOCATED AT VA SAN DIEGO HEALTHCARE SYSTEM, SAN DIEGO, CA.
MOD INSTALLATION OF ONE 400A DISTRIBUTION PANEL BOARD.
CTRS SWING SPACE EXPANSION
PROJECT NO. 691-23-120, WILL PROVIDE A DEDICATED FIRE SUPPRESSION WATER DISTRIBUTION SYSTEM
BUILDING SYSTEMS REPLACEMENT AT THE LOS ANGLES AMBULATORY CARE CENTER (LAACC) LOS ANGELES, CA
N62473-24-D-2620 WATER AND SEWER JOC CONTRACT WR#11266938 REPLENISH FILTER MEDIA IN FIVE VESSELS IM PLANT 24, AT BLDG. 240162, ON MCB CAMP PENDLETON, CA
CONSTRUCTION SERVICES FOR ELECTRONIC HEALTH RECORD MANAGEMENT (EHRM) INFRASTRUCTURE UPGRADES PROJECT 664-20-501 AT VA SAN DIEGO HEALTHCARE SYSTEM, SAN DIEGO, CA.
N62473-24-D-2620 WATER UTILITIES JOC CONTRACT WR#11393895 REPAIR ROTOMAT SCREEN AT TAPS-12, SEWAGE PUMP STATION, AT BLDG. 62831U1 (62 AREA SN MATEO), ON MCB CAMP PENDLETON, CA
WR#11546227 (URGENT) REPAIR ALL THREE 8-INCH DISCHARGE PIPES FOR WET WELL, ON MCB CAMP PENDLETON, CA
N62473-24-D-2620 JOC - WATER AND SEWER CONTRACT (SYGNOS INC.) WR#11283137 INSTALL BACKFLOW DEVICES IN AREA 31 AND 32, ON MCB CAMP PENDLETON, CA
WR#11253644 REPLACE END CAP SEALS, AND VICTAULIC COUPLINGS ON R.O. TRAIN 1 MEMBRANES VESSELS, AT BLDG. 2470B1, ON MCB CAMP PENDLETON, CA
WR#11539718 (URGENT) 24 IM PLANT REPLACE/REPAIR EFFLUENT HIGHLINE, AT BLDG. 2484210 (POTABLE WATER DISTRIBUTION LINES, 24 AREA), ON MCB CAMP PENDLETON, CA
PROJECT NO. 691-21-120 WILL PROVIDE A DEDICATED FIRE SUPPRESSION WATER DISTRIBUTION SYSTEM THROUGHOUT THE NORTH CAMPUS.
PROJECT NO. 691-23-120, WILL PROVIDE A DEDICATED FIRE SUPPRESSION WATER DISTRIBUTION SYSTEM
WR#11537837 (URGENT) UNDERGROUND WATER LEAK AT LAS PULGAS BOOSTER STATION AT BLDG. 41503, ON MCB CAMP PENDLETON, CA
WR#11537854 (URGENT) REPLACE EXISTING DAMAGED C-900 8"X8"X6" TEE WITH DUCTILE IRON TEE AND RE-INSTALL ISOLATION VALVE IN 20-AREA, 1201 BEGONIA ST, ON MCB CAMP PENDLETON, CA
WR#11537851 (URGENT) REPAIR 16" HDPE RECLAIM WATER LINE AND INSTALL 16" ELBOW (YSIDORA FLATS), ON MCB CAMP PENDLETON, CA
MOD INSTALLATION OF ONE 400A DISTRIBUTION PANEL BOARD.
WR#11250383 REPLACE CRACKED SHOWER PANS AND REPAIR WATER DAMAGE IN MULTIPLE ROOMS AT BLDG. 130117, ON MCB CAMP PENDLETON, CA
WR#11249675 REPAIR WATER DAMAGED (MULTIPLE) ROOMS / PROJECT WORK AT BLDG. 130117, ON MCB CAMP PENDLETON, CA
ACCESS ROAD PAVING
WR#11357459B MODIFICATION TO CANCEL TASK ORDER-24F4806, REPAIR IM24 RECLAIM TANK LEAK (5-10 GPM), AT BLDG. 240162, ON MCB CAMP PENDLETON, CA
PROJECT NO. 691-23-120, WILL PROVIDE A DEDICATED FIRE SUPPRESSION WATER DISTRIBUTION SYSTEM
MOD INSTALLATION OF ONE 400A DISTRIBUTION PANEL BOARD.
CTRS FIRE ALARM
PROJECT NO. 691-21-120 WILL PROVIDE A DEDICATED FIRE SUPPRESSION WATER DISTRIBUTION SYSTEM THROUGHOUT THE NORTH CAMPUS.
PROJECT NO. 691-21-120 WILL PROVIDE A DEDICATED FIRE SUPPRESSION WATER DISTRIBUTION SYSTEM THROUGHOUT THE NORTH CAMPUS.
PROJECT NO. 691-23-120, WILL PROVIDE A DEDICATED FIRE SUPPRESSION WATER DISTRIBUTION SYSTEM
WR#11344327A, BLDG. 22112 MOD REQ TO INCREASE FUNDS IN THE AMOUNT OF $6,672.72. IN ORDER TO PROPERLY REMOVE, MANIFEST AND DISPOSE OF THE HAZARDOUS ASBESTOS PIPE
PROJECT NO. 691-21-120 WILL PROVIDE A DEDICATED FIRE SUPPRESSION WATER DISTRIBUTION SYSTEM THROUGHOUT THE NORTH CAMPUS.
WR#11407097 REPAIR AND RELINE WET WELL AT CDC 2052_2052U3, ON MCB CAMP PENDLETON, CA
WR#11439396 UM REPLACE SEWER LINE CONNECTIONS TO GAME WARDEN FACILITIES, AT BLDGS. 2648, 2649, & 26049, ON MCB CAMP PENDLETON, CA
CONSTRUCTION SERVICES FOR ELECTRONIC HEALTH RECORD MANAGEMENT (EHRM) INFRASTRUCTURE UPGRADES PROJECT 664-20-501 AT VA SAN DIEGO HEALTHCARE SYSTEM, SAN DIEGO, CA.
CONSTRUCTION SERVICES FOR ELECTRONIC HEALTH RECORD MANAGEMENT (EHRM) INFRASTRUCTURE UPGRADES PROJECT 664-20-501 AT VA SAN DIEGO HEALTHCARE SYSTEM, SAN DIEGO, CA.
WR#11175525A DEDUCTIVE MOD (24$) INSTALL BACKFLOW DEVICES IN AREAS 13 & 14, AT BLDG. 1384210 ON MCB CAMP PENDLETON, CA
WR#11175913A DEDUCTIVE MOD (23$WRD) INSTALL BACKFLOW METER, AT BLDG. 17081, 1700T1 AND 1700T2, ON MCB CAMP PENDLETON, CA
WR#11076724 PE2509M, REPAIR STORM DRAIN AT SANTA FE AVE 21-AREA, ON MCB CAMP PENDLETON, CA
DEOB MOD TO RECOUP UNUSED OBLIGATED FUNDS ($3,884.00) WR#11293378 SRTTP LEMON GROVE POND PFAS TREATMENT - ION EXCHANGE
PROJECT NO. 691-21-120 WILL PROVIDE A DEDICATED FIRE SUPPRESSION WATER DISTRIBUTION SYSTEM THROUGHOUT THE NORTH CAMPUS.
CTRS FIRE ALARM
WR#11107754 RELOCATE CHILLED/HOT DOMESTIC WATER LINES & GAS LINES AT BLDG. 43258, ON MCB CAMP PENDLETON, CA
WR#11125021 RM 107 AND 207 INSPECT FOR LEAK, SHOWER BULKHEAD IS WARPED AND CAVING IN AT BLDG. 24015, ON MCB CAMP PENDLETON, CA
PERIMETER FENCE AND ROSE GARDEN FENCE
WR#11357459 REPAIR IM24 RECLAIM TANK LEAK (5-10 GPM), AT BLDG. 240162, ON MCB CAMP PENDLETON, CA
WR#11136636 SECOND FLOOR 0.75" & 2.5" COPPER PIPE REPLACEMENT, BLDG. 524100, ON MCB CAMP PENDLETON, CA
WR#10920961 REPLACE CATHODIC PROTECTION SYSTEM RESERVOIR AT BLDG. 2491, ON MCB CAMP PENDLETON, CA
WR#11248479, URGENT INSTALL GAC AT THE NORTH WATER TREATMENT PLAN
WR#11199099A RFI-01-R1 REPLACE GALLEY DRAIN LINE AT BLDG. 31906 ON MCB CAMP PENDLETON, CA
WR#11344327 REPAIR 6" FIRE SUPPLY LINE AND RELATED VOID, BLDG. 22112, ON MCB CAMP PENDLETON, CA
Business Details
- UEI
- DN6TFNNHU3B3
- CAGE Code
- 1X5B9
- Address
- 3996 MAHAILA UNIT D
SAN DIEGO, CA 921225778 - Congressional District
- CA-50
- Phone
- 8585520314
Parent Company
SYGNOS INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov