SUPPLIED INDUSTRIAL SOLUTIONS, INC.
GRANITE CITY, ILLINOIS 620401839
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $16.34M | 85 |
| 237990 | $14.45M | 39 |
| 332510 | $5.90M | 6 |
| 333618 | $3.89M | 3 |
| 532412 | $2.59M | 5 |
| 237110 | $2.47M | 6 |
| 212319 | $1.99M | 2 |
| 326122 | $1.65M | 7 |
| 333991 | $1.37M | 2 |
| 333995 | $1.30M | 5 |
Contract Awards
50 awards found
COAL CREEK LEVEE REPAIR
JB CHAPEL REHABILITATION MOD A00001
MIDEWIN BOATHOUSE ROAD CULVERT REPLACEMENT
MCCAULEY CRANE REPAIRS AS LISTED IN THE PWS
CORALVILLE OFFICE TRAILERS, BASE
MODIFICATION P00003 TO LOCK 25 DEWATERING SUPPLY CONTRACT ADDS ONE ADDITIONAL MONTH TO A CRANE RENTAL TO COMPLETE THE SCOPE OF WORK AND DEOBLIGATES FUNDS FOR ITEMS THAT WERE NOT USED AND RENTALS THAT WERE RETURNED EARLY.
TOW BOAT SERVICE FOR LAGRANGE LOCK AND DAM: MOD TO ADD FUNDING
HORIZONTAL RESURFACING OF LOCK WALL MOD A00002
LOCK 25 DEWATERING SUPPLY CONTRACT POP EXTENSION
MODIFICATION FOR PORCH ROOF CONTRACT FOR FORT SCOTT CARETAKER RESIDENCE/VISITOR CENTER RENOVATION (VA) AT FORT SCOTT, KANSAS.
MODIFICATIONS FOR FLOORING, STAIR RAILS, FINISHES TO CONTRACT FOR FORT SCOTT CARETAKER RESIDENCE/VISITOR CENTER RENOVATION (VA) AT FORT SCOTT, KANSAS.
FY24 LOCKPORT DEWATERING SUPPLY CONTRACT - ADD CONCRETE AND CONCRETE CUTTING TO REPAIR LOCK.
CORALVILLE OFFICE TRAILERS, OPTION PERIOD SIX
MODIFICATION FOR PORCH STAIRS TO CONTRACT FOR FORT SCOTT CARETAKER RESIDENCE/VISITOR CENTER RENOVATION (VA) AT FORT SCOTT, KANSAS.
SUPPLY, DELIVERY, AND OFFLOADING OF A PRE-CAST CONCRETE FLUSH/SHOWER ON A CUSTOMER PREPARED SITE TO MEET ADA STANDARDS FOR SUGAR BOTTOM CAMPGROUND
FY24 LOCKPORT DEWATERING SUPPLY CONTRACT - ADD ADDITIONAL SUPPLIES ACCORDING TO SOW DATED 18 FEBRUARY 2025 AND EXT POP UNTIL 28 APRIL 2025.
MODIFICATION FOR 12TH STREET PS SECURITY TO CONTRACT FOR KCL ARM PS REPAIR AT KANSAS CITY, KANSAS
FY25 DEMO BARRIER AHU REPLACEMENT
MODIFICATION FOR MILL BPU UPGRADE FEES TO CONTRACT FOR KCL ARM PS REPAIR AT KANSAS CITY, KANSAS
FY24 LOCKPORT DEWATERING SUPPLY CONTRACT - P00002 - ADD ADDITIONAL AND REMOVE SUPPLIES ACCORDING TO SOW DATED 16 JANUARY 2025.
MODIFICATION FOR STAIRWELL CHANGES TO CONTRACT FOR FORT SCOTT CARETAKER RESIDENCE/VISITOR CENTER RENOVATION (VA) AT FORT SCOTT, KANSAS
HORIZONTAL RESURFACING OF LOCK WALL GUIDE WALL CART PATH CONCRETE WORK MOD
FY24 LOCKPORT DEWATERING SUPPLY CONTRACT FOR ADDITIONAL SUPPLIES AND EXERCISE OPTION
MODIFICATION FOR REDIRECTING WATER FROM LODGE TO CONTRACT FOR FORT SCOTT CARETAKER RESIDENCE/VISITOR CENTER RENOVATION (VA) AT FORT SCOTT, KANSAS.
LOCK 25 DEWATERING SUPPLY CONTRACT
MODIFICATION FOR 12TH ST PS MOTORS PART 2 TO CONTRACT FOR KCL ARM PS REPAIR AT KANSAS CITY, KANSAS.
FY24 LOCKPORT DEWATERING SUPPLY CONTRACT
PURCHASE OF 2 OVERHAUL BALLS FOR USE WITH CRANE RENTAL
OPTION #13 DESIGN AND CONSTRUCTION MOD A00002
DRESDEN ISLAND SEPTIC SYSTEM REPAIR - ELECTRICAL WORK
MODIFICATION FOR HARDWARE AND DOORS CONTRACT FOR FORT SCOTT CARETAKER RESIDENCE/VISITOR CENTER RENOVATION (VA) AT FORT SCOTT, KANSAS.
MODIFICATION FOR FRONT PORCH FLOORING TO CONTRACT FOR FORT SCOTT CARETAKER RESIDENCE/VISITOR CENTER RENOVATION (VA) AT FORT SCOTT, KANSAS.
CONTRACT 47PF0024F0039 - PARKING LOT IMPROVEMENTS CONSTRUCTION PROJECT AT THE MELVIN PRICE FEDERAL BUILDING AND U.S. COURTHOUSE IN EAST ST. LOUIS. FUNDED BY THE INFLATION REDUCTION ACT.
JB CHAPEL REHABILITATION
BASE BID 2 CONSTRUCTION MOD A00002
COAL CREEK LEVEE REPAIR PL84-99
USACE CHICAGO DISTRICT, AQUATIC CONTROL SECTION, FISH BARRIER, CONTROL GEAR AND BACKUP POWER, CGBP BUILDING, SWITCHGEAR MODIFICATIONS
0915 MIDEWIN ROAD 2 CULVERT REPLACEMENTS
GAOA- TRIGG TOWER REFURBISHMENT FOR THE SHAWNEE NF HIDDEN SPRINGS RANGER DISTRICT
CORALVILLE OFFICE TRAILERS, MOD EXERCISE OPTION 5.
WORK FLAT AND CRANE BARGE REPLACEMENT
MODIFICATIONS FOR FLOOR PATCHING IN ROOM 105 TO CONTRACT FOR FORT SCOTT CARETAKER RESIDENCE/VISITOR CENTER RENOVATION (VA) AT FORT SCOTT, KANSAS.
FY24 DEWATERING PUMPS
LOCK AND DAM 25 HORIZONTAL RESURFACING OF LOCK WALL
MODIFICATION FOR STRUCTURAL COLUMNS, SURVEY, AND TUB TO CONTRACT FOR FORT SCOTT CARETAKER RESIDENCE/VISITOR CENTER RENOVATION (VA) AT FORT SCOTT, KANSAS.
OPTION #13 DESIGN AND CONSTRUCTION MOD A00001
BASE BID CONSTRUCTION MOD A00003 (RMS MOD REFERENCE A00002)
MODIFICATION FOR STRUCTURAL CHANGES TO CONTRACT FOR FORT SCOTT CARETAKER RESIDENCE/VISITOR CENTER RENOVATION (VA) AT FORT SCOTT, KANSAS.
REPAIR CONTROL SYSTEMS, B836
OPTION 2A
Business Details
- UEI
- NKFAQ2J467L3
- CAGE Code
- 3CX55
- Address
- 550 NIEDRINGHAUS AVE
GRANITE CITY, IL 620401839 - Congressional District
- IL-13
- Phone
- 6184528151
Parent Company
SUPPLIED INDUSTRIAL SOLUTIONS, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov