STEELHEAD CONSTRUCTORS JV
REDDING, CALIFORNIA 960039303
Contract Awards
22 awards found
CA ERFO FS ELDOR 2023-1(1) ELEVEN PINES ROAD EMERGENCY REPAIRS INCLUDING ROADWAY RESURFACING, DRAINAGE, AND RETAINING WALLS
CA ERFO FS KLMTH 2023-2(2) GRAYBACK ROAD ROAD RECONSTRUCTION CONTRACT
CA CE SAC PARKING (1) PINE FLAT LAKE PARKING PAVEMENT REHABILITATION
CA CE SAC PARKING(1) PINE FLAT LAKE PARKING PAVEMENT REHABILITATION
CA ER INYO 2023-4(1) WHITNEY PORTAL ROAD THIS CONTRACT MODIFICATION ADDS $3,173,379.10 TO ADD AGGREGATE AND ASPHALT ITEMS TO SCHEDULE A, AS WELL AS THE ITEMS ASSOCIATED WITH OPTIONS X & Y.
2024 WESTERN OREGON ROAD CONSTRUCTION IDIQ
CA ER 511(1) TRINITY CTY RUTH-ZENIA ROAD
THIS MODIFICATION IS TO DE-OBLIGATE FUNDS. THE MINIMUM GUARANTEE HAS BEEN MET BY SUBSEQUENT TASK ORDERS NO CHANGE TO POP DATE CANCEL ITEM 00001 IN ITS ENTIRETY.
CA ER INYO 2023-4(1) WHITNEY PORTAL ROAD ROAD REPAIR CONSTRUCTION CONTRACT
THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDS AND CLOSE OUT THE CONTRACT.
CA ERFO PLUMAS NF 23N18(1) FRAZIER CREEK BRIDGE CM0003 - THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO DE-OBLIGATE REMAINING FUNDS AND CLOSE-OUT THE CONSTRUCTION CONTRACT.
CALIFORNIA ROAD & BRIDGE CONSTRUCTION MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR ROAD AND BRIDGE CONSTRUCTION.
CA ER 511(1) TRINITY CTY RUTH-ZENIA ROAD SOLICITATION THIS MODIFICATION OBLIGATES $75,000 TO CLIN 0003 AND ADDS 110 DAYS AND A PAY ITEM TO ADDRESS POTENTIAL ASPHALT AND SUBGRADE REPAIRS AT SITES 8, 12, AND 13.
THIS MODIFICATION ADDRESSES THE BUREAU OF RECLAMATION (BOR) REQUEST TO CHANGE THE DESIGN TO THE PLACED RAILING SYSTEM ON THE MOUNTAIN QUARRY BRIDGE. THE TOTAL PRICE OF THIS MODIFICATION IS $206,801.35. THE MODIFICATION ADDS 102 CALENDAR DAYS AND CHAN
INCREASE CLIN 00001 540.CN.15FO FUNDS BY $74,355.60; INCREASE CLIN 0004 ER02 FUNDS BY $50,647.20. THIS MODIFICATION DOES NOT CHANGE THE FIXED COMPLETION DATE.
THIS MODIFICATION IS TO OBLIGATE ERFO(ER02) FUNDS TO CLIN 00004.THIS MODIFICATION ADDRESSES THE ATMOSPHERIC RIVER RAIN EVENT THAT CAUSED CRACKING ON PONDEROSA WAY WHICH DELAYED THE CRITICAL PATH OF MOBILIZING THE STEEL GIRDERS FOR PONDEROSA BRIDGE.
CENTRAL/EASTERN OREGON IDIQ MINIMUM GUARANTEE
CONSTRUCTION OF CA FTBR PONDEROSA BRIDGE(1) PONDEROSA BRIDGE REPLACEMENT THIS MODIFICATION ADDRESSES ADDITIONAL STRUCTURE EXCAVATION AND STRUCTURAL CONCRETE FOR THE ABUTMENT AND PIER FOOTING EXCAVATIONS BEYOND THE CONTRACT QUANTITIES ESTABLISHED IN
CA ERFO PLUMAS NF 23N18(1) FRAZIER CREEK BRIDGE
CONSTRUCTION OF CA FTBR PONDEROSA BRIDGE(1) PONDEROSA BRIDGE REPLACEMENT THIS MODIFICATION ADJUSTS THE QUANTITIES OF THE DRAINAGE PAY ITEMS TO ACCOUNT ACTUAL CONDITIONS ENCOUNTERED AT THE PROJECT SITE AND ADDS 31,769.28 TO CLIN 00001 540.CN.15F0 FUND
CA ER 511(1) TRINITY CTY RUTH-ZENIA ROAD SOLICITATION THIS MODIFICATION OBLIGATES $75,000 TO CLIN 0003 AND ADDS 110 DAYS AND A PAY ITEM TO ADDRESS POTENTIAL ASPHALT AND SUBGRADE REPAIRS AT SITES 8, 12, AND 13.
CONSTRUCTION OF CA FTBR PONDEROSA BRIDGE(1) PONDEROSA BRIDGE REPLACEMENT
Business Details
- UEI
- D3XMT3VK5795
- CAGE Code
- 8M4N4
- Address
- 2940 INNSBRUCK DR
REDDING, CA 960039303 - Congressional District
- CA-01
- Phone
- 5302266400
Parent Company
STEELHEAD CONSTRUCTORS JV
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov