S. J. AMOROSO CONSTRUCTION CO., LLC
DBA: SJ AMOROSO CONSTRUCTION CO LLC
REDWOOD CITY, CALIFORNIA 940651061
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $299.84M | 118 |
Contract Awards
50 awards found
SETTLE EQUITABLE ADJUSTMENT
ABATEMENT AND REMOVAL OF ADDITIONAL TRANSITE PIPE REMOVAL OF PV DUCT BANK AND REMOVAL OF ASPHALT AND CONCRETE, AS UNCOVERED ON THE PROJECT SITE, PER PCO 0010
INSTALL ADDITIONAL PROTECTION FOR SHORING BEAMS TO BE INSTALLED PER RFI #23
ABATEMENT, REMOVAL AND DISPOSAL OF APPROXIMATELY 150 LF OF ASBESTOS CONTAINING TRANSITE PIPE.
TO PROVIDE A VAULT THAT SOUTHERN CALIFORNIA EDISON REQUIRES UNDER THE PME GEAR PER SCE DRAWING.
TO INSTALL AN ADDITIONAL HSS 4X2X1/4 POST, PER PCO 0014.
TO INSTALL A 4" 150# CHECK VALVE FOR LOW PRESSURE STEAM ON THE FLASH STEAM ECONOMIZER, PER PCO 0011
PERFORM ARCHAEOLOGICAL BURIED SITE TESTING (BST) AND PROVIDE A REPORT TO VA PRIOR TO MASS EXCAVATION AT THE BOILER PLANT SITE, PER PCO 001R1 (CPE-001R1)
FUNDING LINE 1
CLC, VALB R00176/CC535 CPE599 FIRE ACCESS LN CONNECTION PER RFP 0141. TOTAL CONTRACT PRICE IS INCR BY $462,579.00. EXTEND THE POP AN 30-DAYS CHANGING THE CONTRACT COMPLETION DATE FROM AUGUST 29,2025 TO SEPTEMBER 28, 2025.
FUNDING LINE 1
CLC,VALB. R00175/CC531 SEC EQP RM 1109/CC533 PUBLIC ADDRESS MASTER RM 1425. TOTAL CONTRACT PRICE IS INCR BY $270,319.00. THE POP IS EXTENDED AN ADDITIONAL 30CD CHANGING THE CONTRACT COMPL DATE FROM 7/30/25 TO 8/29/25.
CONTRACT NO. W912PL19C0001 - VA LONG BEACH - COMMUNITY LIVING CENTER, MODIFICATION NO. R00174 - DISHWASHER (DI22) AND ICE MAKER (IC04), CONTRACT PRICE INCREASED BY $489,753.00, COMPLETION DATE IS EXTENDED BY 30 CALENDAR DAYS.
VA PALO ALTO BUILDING 100 CATHETERIZATION LABORATORY / HYBRID OPERATING ROOM SUITE RENOVATION AND INSTALLATION OF ROOFTOP AHU
CONSTRUCT CBOC FUND CITE A
NEW BOILER PLANT AT THE VA MEDICAL CENTER, WEST LOS ANGELES, CA
CONSTRUCT CBOC FUND CITE A
CONTRACT FOR COMMUNITY LIVING CENTER VALB. R00171/CC506-3 PART 2 DEFINITIZATION OF HVAC & TAB. TOTAL CONTRACT PRICE IS INCR BY $5,824,377.00. BOTH PARTIES AGREE WITH A TIME EXT OF 167 CALENDAR DYS CHANGING THE COMPL DATE FROM 11-25-24 TO 5-11-25.
DVA LIVERMORE PHA - CLC
CONTRACT FOR CLC, VALB.R00170/CC508 CPE556 SWISS PEARL PANEL EXT DRS/CC514 CPE584 REPLC LIGHT POLE W/WALL PKS/CC516 CPE561 INVESTIG INTO CFM & TAB. TOTAL CONTRACT PRICE IS INCR BY $143,215.00. THE CONTRACT COMPL DATE SHALL REMAIN UNCHGD BY THIS MOD.
CONSTRUCT CBOC FUND CITE A
CONTRACT FOR CLC, VALB, CA 90822. R00169/CC490 CPE546 CONCRETE ENCASE WATERLINE/CC497 PATIENT SAFETY SYSTEM AT COURTYARD B/CC503 CONCRETE AT PAVERS. TOTAL CONTRACT PRICE IS INCR BY $276,140.00. THE CONTRACT COMPL DATE SHALL REMAIN UNCHGD BY THIS MOD.
VA PALO ALTO BUILDING 100 CATHETERIZATION LABORATORY / HYBRID OPERATING ROOM SUITE RENOVATION AND INSTALLATION OF ROOFTOP AHU
CONTRACT FOR COMMUNITY LIVING CENTER, VALB.REFERENCE NO. R00168/CC506-2 PART 1 REVISED- HVAC & TAB. TOTAL CONTRACT PRICE IS INCR BY $114,415.00. THE CONTRACT COMPL DATE IS EXT'D AN ADDIT'L 62 CALENDAR DAYS FROM SEPTEMBER 24, 2024 TO NOVEMBER 25, 2024.
CONTRACT FOR CLC, VALB, LONG BEACH, CA 90822. REFERENCE NO. R00167/CC507 CPE#560 UNFORESEEN ACM WATER LINE. TOTAL CONTRACT PRICE IS INCREASED BY $464,459.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR CL VALB. R00166/CC468 CPE#285 DOORS, FRAMES AND HARDWARE DELAY/CC476 CPE#542 PARTNERING. TOTAL CONTRACT PRICE IS INCREASED BY $409,135.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR CLC VALB, R00164/CC489 CPE#531/CC495 CPE#558/CC496 CPE#554/CC498 ADD MED GAS HEADWALL/CC500 RFI1745 INTERFACE FOR PBX SYSTEM. TOTAL CONTRACT PRICE IS INCREASED BY $197,200.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHGD BY THIS MO.
CONTRACT FOR COMMUNITY LIVING CENTER, VA LONG BEACH AT 5901 E. 7TH STREET, LONG BEACH, CA 90822. REFERENCE NO. R00165/CC506-1 HVAC & TAB. TOTAL CONTRACT PRICE IS INCREASED BY $199,343.00. THE CONTRACT COMPLETION DATE WILL CHANGE FROM JUNE 18, 2024 TO SEPTEMBER 24, 2024.
VA PALO ALTO BUILDING 100 CATHETERIZATION LABORATORY / HYBRID OPERATING ROOM SUITE RENOVATION AND INSTALLATION OF ROOFTOP AHU
CONSTRUCT CBOC FUND CITE A
CONSTRUCT CBOC FUND CITE A
CONTRACT FOR CLC, VALB, LONG BEACH, CA 90822. R00161/CC483 CPE#540 LOW WALL AT KITCHEN. CC487 CPE#555 CASEWORK REMOVAL & PATCHWORK. TOTAL CONTRACT PRICE IS INCR BY $30,552.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR COMMUNITY LIVING CENTER LONG BEACH, CA90822. R00160/CC486 CPE#536 TIA 21 BROKEN CHILLED WATER. TOTAL CONTRACT PRICE IS INCR BY $1,684,398.00. THE CONTRACT COMPL DATE SHALL BE EXTENDED BY 68 CALENDAR DAYS BY REASON OF THIS MODIFICATION.
CONSTRUCT CBOC FUND CITE A
CONSTRUCT CBOC FUND CITE A
CONSTRUCT CBOC FUND CITE A
CONSTRUCT CBOC FUND CITE A
CONSTRUCT CBOC FUND CITE A
CONSTRUCT CBOC FUND CITE A
CONTRACT FOR CLC, VALB AT 5901 E. 7TH STREET, LONG BEACH, CA 90822. R00156/CC473 CPE#507/CC477 CPE#539/CC478 CPE#526/CC479 CPE#538/CC480 CPE#541. TOTAL CONTRACT PRICE IS INCR BY $315,539.00. THE CONTRACT COMPL DATE SHALL REMAIN UNCHANGED BY THIS MOD.
CONTRACT FOR COMMUNITY LIVING CENTER, VA LONG BEACH AT 5901 E. 7TH STREET, LONG BEACH, CA 90822. REFERENCE NO. R00157/CC464 CPE#523 CONDUIT TO PUMP FLOATS & CC474 CPE#530 CIRCUIT FOR UG TANKS. TOTAL CONTRACT PRICE IS INCREASED BY $176,644.00. TOTAL CONTRACT PRICE IS INCREASED BY $176,644.00.
CONTRACT FOR CLC VALB AT 5901 E. 7TH STREET, LONG BEACH, CA 90822. R00158/CC481 CPE#543 & CC482 CPE#548. TOTAL CONTRACT PRICE IS INCR BY $53,359.00. THE CONTRACT COMPL DATE SHALL REMAIN UNCHANGED BY THIS MOD.
PHARMACY COMPENSABLE TIME MODIFICATION.
CONSTRUCT CBOC FUND CITE A
CONSTRUCT CBOC FUND CITE A
CONTRACT FOR CL, VALB, LONG BEACH, CA 90822.R00155/CC450 ATS FIBER RUN/CC470 REPAIR MED GAS PRESSURE/REPURGE/CC475 BALANCING VALVES FOR HWR SYSTEM. TOTAL CONTRACT PRICE IS INCR BY $394,621. THE CONTRACT COMPL DATE SHALL REMAIN UNCHANGED BY THIS MOD
CONTRACT FOR CLC VALB CA. R00154/CC448 SITE CONCRETE INSP/CC462 POWER TO DDC PANELS/CC465 FUR OUT/CC471 PARAPET FLASHING/CC472 GLASS RAILING. TOTAL CONTRACT PRICE IS INCR BY $215,791. THE CONTRACT COMPL DATE SHALL REMAIN UNCHANGED BY THIS MOD
CONSTRUCT CBOC FUND CITE A
CONTRACT FOR COMMUNITY LIVING CENTER, VALB LONG BEACH, CA. REFERENCE NO. R00153/CC272-2 PART 2-GOV'T IMPACTS DUE TO SOILS. TOTAL CONTRACT PRICE IS INCREASED BY $3,906,622.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR COMMUNITY LIVING CENTER, LONG BEACH, CA 90822. R00152/CC469 CPE#524 TIA CHILLED WATERLINE. TOTAL CONTRACT PRICE IS INCR BY $4,033,687.00. THE CONTRACT COMPL DATE SHALL BE EXTENDED BY 130 CALENDAR DAYS BY REASON OF THIS MODIFICATION.
Business Details
- UEI
- KU19CNLCK2K7
- CAGE Code
- 4FBW4
- Address
- 390 BRIDGE PKWY
REDWOOD CITY, CA 940651061 - Congressional District
- CA-15
- Phone
- 6506541900
Parent Company
S. J. AMOROSO CONSTRUCTION CO., LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov