RIDGE2RIVER CONSTRUCTION LLC
SOAP LAKE, WASHINGTON 988519818
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 237310 | $6.34M | 40 |
| 237990 | $1.83M | 7 |
| 238910 | $90K | 2 |
Contract Awards
32 awards found
TRAIL BRIDGE CONSTRUCTION ON THE NOISY CREEK TRAIL, NEWPORT-SULLIVAN LAKE RANGER DISTRICTS, COLVILLE NATIONAL FOREST
FERN VIEW BRIDGE DECK REPLACEMENT. REPLACE A FAILING TIMBER BRIDGE DECK WITH A NEW GLULAM DECK PANEL BRIDGE DECK.
STILL CREEK BRIDGE
OPAL POOL TRAIL BRIDGE/MERTEN MILL TRAIL BRIDGE
2024 WESTERN OREGON ROAD CONSTRUCTION IDIQ
WORK UNDER THIS TASK ORDER CONSISTS OF REMOVAL AND DISPOSAL OF FOUR EXISTING, FAILED, LOG STRINGER BRIDGES, CONSTRUCTION SURVEYING AND STAKING, FURNISHING FOUR REFABRICATED STEEL GIRDER TRAIL BRIDGES WITH AMERICAN CEDAR DECK AND RAIL SYSTEM ON REINFO
SWEET CREEK TRAIL BRIDGE #2 IAW SOW - REGION 6 ROAD AND BRIDGE CONSTRUCTION BPA
BOUNDARY DAM EAST SIDE TRAIL CONSTRUCTION
STILL CREEK BRIDGE
2024 WESTERN OREGON ROAD CONSTRUCTION IDIQ
8A GEOTECHNICAL DRILLING 2024 ADDING 2 DRILLING SITES
GAOA CROOKED CREEK TRAIL BRIDGE
GEOTECHNICAL DRILLING 2024
BOUNDARY DAM EAST SIDE TRAIL CONSTRUCTION
KINK CREEK TRAIL BRIDGE REPLACEMENT
PROJECT CONSISTS OF CONSTRUCTING A 160 FT (OUT-TO-OUT) PREFABRICATED STEEL TRUSS PEDESTRIAN BRIDGE ON REINFORCED CONCRETE ABUTMENTS.
ERFO DEVIL'S CREEK BRIDGE DECK REPLACEMENT. REPLACE A DAMAGED TIMBER BRIDGE DECK WITH A NEW TIMBER BRIDGE DECK.
LOGAN AND UPPER PORTLAND DECK REPLACEMENTS - WILLAMETTE NF - MIDDLE FORK RD
TRAIL BRIDGE CONSTRUCTION ON THE NOISY CREEK TRAIL, NEWPORT-SULLIVAN LAKE RANGER DISTRICTS, COLVILLE NATIONAL FOREST
PROJECT CONSISTS OF CONSTRUCTING A 160 FT (OUT-TO-OUT) PREFABRICATED STEEL TRUSS PEDESTRIAN BRIDGE ON REINFORCED CONCRETE ABUTMENTS.
GAOA MT. HOOD TRAIL BRIDGE REPAIRS
GAOA CROOKED CREEK TRAIL BRIDGE
PROJECT CONSISTS OF CONSTRUCTING A 160 FT (OUT-TO-OUT) PREFABRICATED STEEL TRUSS PEDESTRIAN BRIDGE ON REINFORCED CONCRETE ABUTMENTS.
INDIAN CREEK: THE CONTRACTOR SHALL FURNISH THE NECESSARY PERSONNEL, MATERIAL, EQUIPMENT, SERVICES AND FACILITIES (EXCEPT AS OTHERWISE SPECIFIED), TO PERFORM THE STATEMENT OF WORK/SPECIFICATIONS REFERENCED IN SECTION J. WORK INCLUDES: REPLACING AN EX
THE PROJECT IS THE REMOVAL OF DAMAGED TRAIL BRIDGES AND REPLACEMENT OF THE TRAIL BRIDGES. THIS IS A GAOA FUNDED PROJECT. THREE TRAIL BRIDGES ARE INCLUDED WITH TWO PRESENTLY FUNDED AND THE THIRD AN OPTIONAL ITEM. REQUEST THE CONTRACT BE AWARDED UNDER
BOUNDARY DAM EAST SIDE TRAIL CONSTRUCTION
GEOTECHNICAL DRILLING 2022 MULTI-FOREST MOD P00002 UPDATE QUANTITIES IN SCHEDULE
FY21 GAOA - 0615 DELLENBACK TRAIL IMPROVEMENTS TO SERVE WIDE RANGE OF USERS - LEMOLO TRAIL BRIDGE
BOUNDARY DAM EAST SIDE TRAIL CONSTRUCTION
HISTORIC BENSON FOOTBRIDGE CONCRETE ROCK REPAIR 2022
GAOA BURNT CABIN TRAIL BRIDGE REPLACEMENT
CONSTRUCTION, GAOA JENKINS CROSSING TRAIL BRIDGE REPLACEMENT
Business Details
- UEI
- GK73ZNU73P16
- CAGE Code
- 68RU3
- Address
- 29465 DRY COULEE RD
SOAP LAKE, WA 988519818 - Congressional District
- WA-04
- Phone
- 5097604858
Parent Company
RIDGE2RIVER CONSTRUCTION LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov