PRIME ONE GROUP GENERAL TRADING AND CONTRACTING COMPANY WLL
DBA: PRIME ONE GROUP GENERAL TRADING AND CONTRACTING CO
SALMIYA, - - 22094
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $19.67M | 119 |
| 237310 | $2.04M | 12 |
| 238210 | $508K | 1 |
| 238290 | $458K | 7 |
| 238220 | $396K | 5 |
| 333415 | $371K | 8 |
| 332510 | $312K | 2 |
| 221112 | $258K | 6 |
| 238110 | $220K | 4 |
| 237130 | $218K | 5 |
Contract Awards
50 awards found
CARGO CITY VSA ROAD
REEFER LEASE AND MAINTENANCE (OY1)
REEFER LEASE AND MAINTENANCE DESCOPE
THIS TO IS FOR ATTENDANCE TO THE FY25 MACC POST-AWARD CONFERENCE
DESIGN AND CONSTRUCTION OF A 371 SM (4000 SQ. FT.) STEM WALLED PEB (PRE-ENGINEERED BUILDING) FOR THE ECES SQUADRON.
CONSTRUCT ELRS AIRCRAFT PARTS WAREHOUSE
ALL INCIDENTALS REQUIRED TO TO PERFORM PAVEMENT OPERATIONS TO CREATE A CONCRETE SLAB FOR THE EXPEDITIONARY CIVIL ENGINEER SQUADRON, AND CONSTRUCT A PRE-ENGINEERED BUILDING (PEB) ON THAT CONCRETE SLAB AT PRINCE SULTAN AIR BASE (PSAB), KSA
THIS PROJECT CONSISTS OF THE DESIGN AND CONSTRUCTION OF A NEW PRE-ENGINEERED METAL BUILDING (PEMB) FOR CAMP SPARTA HUMAN PERFORMANCE LAB IAW SOW DATED 17 MAY 2024.
THE CONTRACTOR SHALL PROVIDE ALL ENGINEERING, SUPERVISION, LABOR, PARTS, EQUIPMENT, TOOLS, SUPPLIES, AND ALL RELEVANT INCIDENTALS TO CONSTRUCT A 687 SM PEB WITH SIDEWALKS, A PARKING LOT, AND AN OVERHANG FOR MISSION PLANNING, ERQG HEADQUARTERS, EQUIPM
THE CONTRACTOR SHALL PROVIDE ALL ENGINEERING, SUPERVISION, LABOR, PARTS, EQUIPMENT, TOOLS, SUPPLIES, AND ALL RELEVANT INCIDENTALS TO CONSTRUCT A 784 SM PEB WITH SIDEWALKS, A PARKING LOT, AND CONCRETE PADS FOR MAINTENANCE SQUADRON OFFICES, SUPPLY, AND
THE SCOPE OF THIS PROJECT IS TO DESIGN AND CONSTRUCT A ONE-STORY, PERMANENT FIRE STATION TO SERVICE THE LIFE SUPPORT AREA (LSA) AT ALI AL SALEM AIR BASE.
REEFER LEASE AND MAINTENANCE (OY2)
THIS REQUIREMENT IS FOR BASE PAVING AND REPAIR FOR ROCK ENTRANCE ROAD AT ALI AL SALEM AIR BASE, KUWAIT. THE CONTRACTOR IS TO FURNISH ALL PLANT, LABOR, MATERIALS, EQUIPMENT, SUPPLIES AND SUPERVISION NECESSARY.
THIS PROJECT CONSISTS OF THE DESIGN AND CONSTRUCTION, REPLACING TWO (2) EXISTING CONCRETE PAD MOUNTED, ENCLOSED 1675 KVA STAND-BY GENERATORS. BOTH GENERATORS THAT ARE TO BE REPLACED ARE LOCATED NEXT TO BUILDING 523, ALPHA SUBSTATION, AT ALI AL SALEM
THIS PROJECT CONSISTS OF THE DESIGN AND CONSTRUCTION OF A NEW PRE-ENGINEERED METAL BUILDING (PEMB) FOR CAMP SPARTA HUMAN PERFORMANCE LAB IAW SOW DATED 17 MAY 2024.
CONSTRUCT CAMP SPARTA MULTIPURPOSE CONFERENCE CENTER IAW THE SOW.
CONSTRUCTION OF THE PAX TERMINAL
THE CONTRACTOR SHALL PROVIDE ALL ENGINEERING, SUPERVISION, LABOR, PARTS, EQUIPMENT, TOOLS, SUPPLIES, AND ALL RELEVANT INCIDENTALS TO CONSTRUCT A 784 SM PEB WITH SIDEWALKS, A PARKING LOT, AND CONCRETE PADS FOR MAINTENANCE SQUADRON OFFICES, SUPPLY, AND
CE 23-1049-THIS REQUIREMENT IS TO PROVIDE AND INSTALL PRINCE SULTAN AIR BASE WITH OVERHEAD LIGHTING IN 25 SUNSHADES.
THE CONTRACTOR SHALL PROVIDE ALL ENGINEERING, SUPERVISION, LABOR, PARTS, EQUIPMENT, TOOLS, SUPPLIES, AND ALL RELEVANT INCIDENTALS TO CONSTRUCT A 687 SM PEB WITH SIDEWALKS, A PARKING LOT, AND AN OVERHANG FOR MISSION PLANNING, ERQG HEADQUARTERS, EQUIPM
ASVF 21-2115 CONSTRUCT WING OPERATIONS CENTER (WOC)
CEN-Z110 DRIVEWAY EXTENSION/CEN
CONSTRUCT CAMP SPARTA MULTIPURPOSE CONFERENCE CENTER IAW THE SOW.
THE SCOPE OF THIS PROJECT IS TO DESIGN AND CONSTRUCT A ONE-STORY PERMANENT STANDALONE INFORMATION TRANSFER NODE (ITN) PRE-ENGINEERED BUILDING (PEB) TO INCLUDE FENCING, PAVEMENTS, PRIMARY POWER, BACKUP GENERATION, AND SUPPORTING INFRASTRUCTURE AT ALI
THIS PROJECT CONSISTS OF THE DESIGN AND CONSTRUCTION OF A NEW PRE-ENGINEERED METAL BUILDING (PEMB) FOR CAMP SPARTA HUMAN PERFORMANCE LAB IAW SOW DATED 17 MAY 2024.
THE CONTRACTOR SHALL PROVIDE ALL SUPERVISION, LABOR, PARTS, EQUIPMENT, TOOLS, SUPPLIES AND ALL INCIDENTALS NECESSARY TO ACCOMPLISH THE REQUIREMENTS OF THIS PROJECT DESCRIPTION. THE PROJECT IS FOR THE MILL AND OVERLAY OF THE GOLF LIMA, AND PAVEMENT MA
THIS REQUIREMENT IS FOR BASE PAVING AND REPAIR AT ALI AL SALEM AIR BASE, KUWAIT. THE CONTRACTOR IS TO FURNISH ALL PLANT, LABOR, MATERIALS, EQUIPMENT, SUPPLIES AND SUPERVISION NECESSARY FOR PROJECT REPAIR OF THE DFAC ROAD.
THIS REQUIREMENT IS FOR BASE PAVING AND REPAIR AT ALI AL SALEM AIR BASE, KUWAIT. THE CONTRACTOR IS TO FURNISH ALL PLANT, LABOR, MATERIALS, EQUIPMENT, SUPPLIES AND SUPERVISION NECESSARY FOR THE REQUIRED CONTRACT.
DESIGN AND CONSTRUCTION OF A NEW PRE-ENGINEERED METAL BUILDING (PEMB) SUNSHADE WITH APPROPRIATE CONCRETE FOOTINGS; THE NEW PEMB SHALL MEET THE REQUIREMENTS STATED IN THE STATEMENT OF WORK (SOW).
REPAIR PERIMETER FENCE AND INSTALL GATES. THE CONTRACTOR SHALL PROVIDE ALL ENGINEERING, SUPERVISION, LABOR, EQUIPMENT, TOOLS, SUPPLIES, ALL INCIDENTALS, AND PERFORM A PHYSICAL SURVEY OF THE ACTUAL LOCATION OF WORK TO BE ACCOMPLISHED IAW THE SOW.
THIS REQUIREMENT IS FOR BASE PAVING AND REPAIR FOR ROCK ENTRANCE ROAD AT ALI AL SALEM AIR BASE, KUWAIT. THE CONTRACTOR IS TO FURNISH ALL PLANT, LABOR, MATERIALS, EQUIPMENT, SUPPLIES AND SUPERVISION NECESSARY.
ASVF 21-2115 CONSTRUCT WING OPERATIONS CENTER (WOC)
EMEDS UTILITIES PROJECT
THIS PROJECT CONSISTS OF THE DESIGN AND CONSTRUCTION, REPLACING TWO (2) EXISTING CONCRETE PAD MOUNTED, ENCLOSED 1675 KVA STAND-BY GENERATORS. BOTH GENERATORS THAT ARE TO BE REPLACED ARE LOCATED NEXT TO BUILDING 523, ALPHA SUBSTATION, AT ALI AL SALEM
REQUIREMENTS: DESIGN AND BUILD FIVE (5) STEEL PLATFORMS
CONSTRUCTION OF THE PAX TERMINAL
CARGO CITY VSA ROAD
GENERATOR LEASE CONTRACT
THE CONTRACTOR SHALL PROVIDE THE APPROPRIATE SAFETY EQUIPMENT TO ALLOW FIRE FIGHTERS TO OPERATE SAFELY DURING DAILY DUTIES. THIS INCLUDES OVERHEAD DOORS EQUIPPED WITH A SIGNALING SYSTEM TO INDICATE WHEN THE DOORS ARE FULLY RAISED.
THE PURPOSE OF THIS MODIFICATION IS TO: (A) INCORPORATE FAR 52.217-8 OPTION TO EXTEND SERVICES INTO THE CONTRACT AS IT WAS WRONGFULLY OMITTED AT THE TIME OF AWARD.(B) EXERCISE A 2-MONTH EXTENSION IAW FAR 52.217-8ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
REEFER LEASE AND MAINTENANCE (OY1)
DESIGN AND INSTALL DOMESTIC COLD WATER, DOMESTIC HOT WATER, WASTE, AND VENT SYSTEMS AS INDICATED IN THE PROJECT PLANS AND SPECIFICATIONS. THE SYSTEMS SHALL BE PROPERLY CONNECTED TOTHE SITE MAIN WATER SUPPLY AND SITE MAIN SEWAGE PIPING.
MRE DISPOSAL CALL.
MRE DISPOSAL CALL QTY 91629
DESCOPE AND DEOBLIGATE CONTRACT
THE PURPOSE OF THIS MODIFICATION IS TO: (A) ADD CLIN 0010 FOR ADDITIONAL WORK IAW THE ATTACHED QUOTE DATED 19 DEC 2023.(B) INCREASE THE TOTAL OBLIGATED AMOUNT BY $9,922.95 FROM $89,128.38 TO $99,840.86.(C) ALL OTHER TERMS REMAIN UNCHANGED.
CONDUIT PIPES ADDITIONAL FUNDING
THE 378 ECES HAS A REQUIREMENT FOR THE ADDITION OF A CONCRETE PAD AND DRIVEWAY FOR BUILDING Z110.
THE PURPOSE OF THIS MODIFICATION IS TO: 1. INCORPORATE SOW V4 DTD 19 SEPT 232. ADD CLIN 0002 IN THE AMOUNT OF $19,899.443. TO EXTEND THE POP FROM 4 JAN 2024 TO 12 MARCH 2024ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
REEFER LEASE AND MAINTENANCE (OY1)
Business Details
- UEI
- F2SMLAV4HHM4
- CAGE Code
- SCZ04
- Address
- OFFICE NO. 22, 1ST FLOOR, BO
SALMIYA, 22094 - Phone
- 5109445606
Parent Company
PRIME ONE GROUP GENERAL TRADING AND CONTRACTING COMPANY WLL
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov