PATRIOT CONSTRUCTION INC
DBA: GENERAL CONTRACTOR
STOCKTON, CALIFORNIA 952064982
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $88.01M | 204 |
| 238290 | $6.49M | 4 |
| 236210 | $1.39M | 14 |
| 561210 | $695K | 3 |
| 238990 | $-124,168.4 | 1 |
Contract Awards
50 awards found
MODIFICATION P00021 - REA FOR DELAY AND DIRECT COSTS
SEISMIC PHASE 7 THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CHANGE ORDER #002 FOR A CREDIT FOR EQUIPMENT NOT AVAILABLE TO ANCHOR.
PROJECT NO. 662-25-111, DESIGN BUILD SERVICES ROOF REPLACEMENT EPDM RUBBER ROOF BUILDING 5 IN VAMC - SF
INSTALLATION OF HEMODIALYSIS WATER TREATMENT SYSTEM
REPAIR UNDERGROUND STORAGE TANK LEAK DETECTION SYSTEM BUILDING 204 AT VAMC - SF
DEMO OF TRAILERS
THE PURPOSE OF MODIFICATION P00002 IS TO DEFINITIZE MODIFICATION P00001, INCORPORATE EXTERIOR STAIRS TO ROOF AND RESTROOM ACCESSORIES INTO THE CONTRACT, AND EXTEND THE CONTRACT COMPLETION DATE.
TASK ORDER - 640A0-25-102: DIRECTOR'S QUARTERS TELECOMMUNICATION
POWER UPGRADE TO THE VA NORTHERN CALIFORNIA HEALTH CARE SYSTEM (VANCHCS) MCCLELLAN BLDG 98
THIS MODIFICATION DEFINITIZES MODIFICATION P00004 AND P00005.
ELECTRONIC CYLINDER REKEY AWARD IDP PYF & POP EXTENSION MODIFICATION
PROJECT NO. 612A4-25-003, CORRECT MCC B93 SPLIT UNIT SYSTEM
MOUNTAIN VIEW IMPROVE SECURITY
CONSTRUCTION: INCREASE THE POP OF THIS CONTRACT 320 DAYS FROM ORIGINAL POP.
RENOVATE BUILDING 7 FOR SPINAL CORD INJURY UNIT - PYF TO ADDRESS MULTIPLE CHANGE ORDERS AND TO EXTEND THE PERIOD OF PERFORMANCE
NTE FOR UNFORESEEN ISSUES TO NOT DELAY THE CONTINUED CONSTRUCTION.
MODIFICATION TO ADD MOLD REMEDIATION, DEMOLITION, FRAMING AND DRYWALL, MEP REWORK, FINISH REPAIRS, AND SUBFLOOR INSULATION.
THE PURPOSE OF MODIFICATION IS INCORPORATE STORM DRAIN TIE-IN AND ASI-01 STRUCTURAL REVISIONS INTO THE PROJECT.
DESIGN BUILD EHRM MATHER VA MEDICAL CENTER INFRASTRUCTURE UPGRADES
RENOVATE BUILDING 7 FOR SPINAL CORD INJURY UNIT - WORK TO REPAIR ROOF LEAKS AT MULTIPLE LOCATIONS.
MODIFICATION P00005 - REA DUE TO GOVERNMENT CAUSED DELAYS
SEISMIC PHASE 7 THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE MODIFICATIONS OF FINAL PUNCH LIST ITEMS THROUGHOUT THE BUILDING THAT REQUIRED ADDITIONAL WORK TO SEISMICALLY SECURE.
MODIFICATION TO ADD ELEVATOR/CART LIFT, TEMPORARY ASPHALT PATHWAY, AND CONCRETE PAD FOR LIFT TO ASSIST WITH THE FUNCTIONALITY OF THE TEMPORARY FACILITIES.
RENOVATE AMERICAN SAMOA CBOC PERIOD OF PERFORMANCE TIME EXTENSION GLASS CREDIT FROM WINTER LEAF DESIGN TO PLAIN.
MODIFICATION P00001: EMERGENCY REPAIR B702 CHILLER FEEDERS. REPAIR CONDUIT.
TASK ORDER: EMERGENCY REPAIR B702 CHILLER FEEDERS
URGENT REQUIREMENT- REPAIR OIT NETWORK
PROJECT 640A0-22-109 RENOVATE 321-C WING OPIOID TREATMENT (DESIGN BUILD)
MODIFICATION 2031JG18C00018 MOD P00046 - THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATES FUNDS FROM CLIN 0005 PER FY25Q1 OPEN OBS REPORT.
RENOVATE AMERICAN SAMOA CBOC UPGRADE PUMPS TO HANDLE EXCESS MOISTURE
MODIFICATION P00005 - ADDITIONAL TIME AND CREDITS
FLL REPAIR
RENOVATE BUILDING 7 FOR SPINAL CORD INJURY UNIT - PYF TO ADDRESS MULTIPLE CHANGE ORDERS AND TO EXTEND THE PERIOD OF PERFORMANCE
RENOVATE BUILDING 7 FOR SPINAL CORD INJURY UNIT - PYF TO ADDRESS MULTIPLE CHANGE ORDERS AND TO EXTEND THE PERIOD OF PERFORMANCE
RESTORE RELIABILITY OF MAIN SWITCHBOARD FOR AGENCY TELECOM GATEWAY, N254
SEISMIC PHASE 7
MODIFICATION 2031JG18C00018 MOD P00045 - THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATES FUNDS FROM MOD P00017 P00019 AS PER FY24Q3 OPEN OBS REPORT.
CONSTRUCTION MATHER VAMC
RENOVATE AMERICAN SAMOA CBOC RELOCATE RAIN DOWNSPOUT TO ACCOMODATE TO CONDENSATE UNITS
MODIFICATION 2031JG18C00018 MOD P00044 - THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATES FUNDS FROM MOD P00014 AS PER FY24Q3 OPEN OBS REPORT.
MODIFICATION 2031JG18C00018 MOD P00043 - THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATES FUNDS FROM MOD P0006 AS PER FY24Q3 OPEN OBS REPORT.
DESIGN BUILD EHRM MATHER VA MEDICAL CENTER INFRASTRUCTURE UPGRADES
MODIFICATION 2031JG18C00018 MOD P00041 - THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE (MOD P00011); AS PER DE-OB REPORT FY24Q3.
MODIFICATION 2031JG18C00018 MOD P00042 - THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATES FUNDS FROM MOD P00013 AS PER FY24Q3 OPEN OBS REPORT .
THE PURPOSE OF THIS MODIFICATION IS TO FURNISH AND INSTALL TWO INSTANT HOT WATER HEATERS.
MODIFICATION 2031JG18C00018 MOD P00039 - THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS AS PER COR.
MODIFICATION 2031JG18C00018 MOD P00040 - THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS AS PER COR
PROJECT 640A0-22-109 RENOVATE 321-C WING OPIOID TREATMENT (DESIGN BUILD)
N252 NATURAL GAS DISTRIBUTION MODIFICATION
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE MODIFICATIONS TO THE CASEWORK AND INCORPORATE THE ADDED BRICK VENEER AND LIGHT FIXTURE CREDIT.
Business Details
- UEI
- N6F2MJSH4WM8
- CAGE Code
- 4TJX4
- Address
- 4646 QANTAS LN STE B-4
STOCKTON, CA 952064982 - Congressional District
- CA-09
- Phone
- 2094566154
Parent Company
PATRIOT CONSTRUCTION INC
Data Source
This profile is based on federal contract award data from USAspending.gov.