NORTH STAR CONSTRUCTION & ENGINEERING INC
DBA: NORTH STAR CONSTRUCTION
YUBA CITY, CALIFORNIA 959932625
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $9.59M | 35 |
| 237310 | $2.87M | 5 |
| 237110 | $159K | 1 |
| 238210 | $98K | 1 |
| 236210 | $0 | 4 |
Contract Awards
18 awards found
REMOVE AND REPLACE SEVEN BALLISTIC GUARD BOOTH WINDOWS AT THE FOLSOM DAM
CONSTRUCTION GC MATOC TASK ORDER. THE REQUIREMENT IS FOR THE REMOVAL AND REPLACEMENT OF ELEVEN (11) EVAPORATIVE COOLERS, AND THE REPLACEMENT OF ALL CEILING FLUORESCENT STYLE LIGHTS WITH LED FOR BUILDING 1023.
CONSTRUCTION: REHABILITATION OF THE SODIUM HYPO-CHLORITE GENERATION SYSTEM AS DESCRIBED IN SPECIFICATION 01 11 00, PARAGRAPH 1.2.1.8 AND SHOWN WITHIN THE CONTRACT DOCUMENTS ATTACHED TO THIS SOLICITATION.
CONSTRUCTION: PROJECT TITLE: FY25 AIRFIELD WORK PROJECT LOCATION: BEALE AFB, CA
CONSTRUCTION: REPAIR PRIMARY CLARIFIER AT THE WASTE WATER TREATMENT PLANT IN ACCORDANCE WITH STATEMENT OF WORK AND DESIGN.
CONSTRUCTION: REMOVE AND REPLACE EXISTING HVAC UNIT AS WELL AS CORRESPONDING ELECTRICAL PANEL, FIRE SMOKE DETECTORS, AND ROOF INSTALLATION, IN ACCORDANCE WITH THE STATEMENT OF NEED DATED 17 MAR 2025.
CONSTRUCTION: UPGRADE FIRE PUMP CONTROLLERS AT B11600, DESIGN AND CONSTRUCTION OF A NEW FIRE ALARM SYSTEM AND FIRE PUMP CONTROLLERS. PROJECT ALSO INCLUDES INSTALLATION OF A DUCTLESS SPLIT SYSTEM AIR CONDITIONER WITH PROGRAMMABLE THERMOSTAT.
CONSTRUCTION: PROJECT TITLE: FY25 AIRFIELD WORK PROJECT LOCATION: BEALE AFB, CA
THE CONTRACTOR (KTR) SHALL PROVIDE ALL PROFESSIONAL SERVICES, PERMITS, EQUIPMENT, LABOR, TOOLS, MATERIALS, AND ANCILLARY ITEMS TO COMPLETE THE TASKS TO RESTRIPE 500 RAMP AREA AND NEARBY TAXIWAYS IN ACCORDANCE WITH THE STATEMENT OF WORK.
THIS REQUIREMENT IS TO COVER THE COSTS ASSOCIATED WITH THE MINIMUM ORDER VALUE FOR THE TRANSPORTATION AND PAVING IDIQ AT BEALE AFB.
CA COLEMAN NFH GENERATOR REPLACEMENT
REMOVE EXISTING POWER POLES (D8-113, D8-118) AS IDENTIFIED, WITH THE OVERHEAD ELECTRICAL CABLES, AND REPLACE THE POWER POLES WITH NEW ONES AS WELL AS UPGRADE THE EXISTING OVERHEAD ELECTRICAL CABLES.
THE PURPOSE OF THIS PROJECT IS TO REPAIR VARIOUS SEWER MANHOLES ACROSS BEALE AFB AND ADDRESS ANY INFLOW AND INFILTRATION ISSUES IN ACCORDANCE WITH THE ATTACHED REPAIR SEWER MANHOLES SON V2.
ELECTRICAL REPAIRS AT CAPEHART HOUSING, AT THE MARIN HEADLANDS, GOLDEN GATE NATIONAL RECREATION AREA, MARIN COUNTY, CALIFORNIA. MODIFICATION P00002 IS TO REMOVE FROM THE SCOPE OF WORK TREE PROTECTION & BMP'S AND AS-BUILTS, UNDER GENERAL R
ELECTRICAL REPAIRS AT CAPEHART HOUSING, AT THE MARIN HEADLANDS, GOLDEN GATE NATIONAL RECREATION AREA, MARIN COUNTY, CALIFORNIA.
MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR DESIGN-BUILD CONSTRUCTION SERVICES FOR THE DEPARTMENT OF INTERIOR AND FOREST SERVICE
GSA PBS GOVERNMENTWIDE MULTIPLE AWARD IDIQ CONTRACT(S) FOR GENERAL CONSTRUCTION WITH DESIGN/BUILD CAPABILITIES TO SUPPORT THE INSTALLATION OF ELECTRIC VEHICLE SUPPLY EQUIPMENT(EVSE) FOR GEOGRAPHIC ZONE D
REPAIR AND UPGRADE OMNI GYM: MOD P00003 REPAIR EXTERIOR WALL AND ADD FIRE SUPPRESSION TO AIRMAN'S ATTIC.
Business Details
- UEI
- L11VBF8Y3AJ8
- CAGE Code
- 3XBA7
- Address
- 1282 STABLER LN STE 630
YUBA CITY, CA 959932625 - Congressional District
- CA-01
- Phone
- 5306737080
Parent Company
NORTH STAR CONSTRUCTION & ENGINEERING INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov