NEW AGE DEVELOPMENT GROUP, LLC
CONSHOHOCKEN, PENNSYLVANIA 194284150
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $51.13M | 107 |
Contract Awards
50 awards found
C110005 THIS MODIFICATION INCORPORATES THE CUSTOMERS REQUEST TO REPAIR HISTORICAL FEATURES OF THE BUILDING THAT WERE EXCLUDED FROM THE ORIGINAL SCOPE WHICH RESULTED IN DETERIORATION OVER TIME AND/OR MUST BE UPGRADED TO MEET ACCESSIBILITY STANDARDS.
C201060 MOD.IS TO SUPPLY/INSTALL SPICER FIELD CANCELLATION SYSTEM. THIS INVOLVES KEY INFRASTRUCTURE UPGRADES ESSENTIAL FOR BIOSAFETY, BIOSECURITY, ANIMAL HEALTHCARE & RESEARCH CONTINUITY.
C201060 PROJECT: PROVIDE CONSTRUCTION SERVICES TO CONVERT AN EXISTING CIT SERVER ROOM INTO A NEGATIVE MICROSCOPY ROOM. IT INVOLVES KEY INFRASTRUCTURE UPGRADES ESSENTIAL FOR BIOSAFETY, BIOSECURITY, ANIMAL HEALTHCARE & RESEARCH CONTINUITY.
C112535- CONSTRUCTION FOR BLDG. 8 & 8A REHEAT AND TERMINAL UNIT REPLACEMENT- PHASE 01. THE PROJECT IS TO REPLACE THE REHEAT COMPONENTS, FROM THE HEAT EXCHANGERS TO THE TERMINAL UNIT REHEAT COILS WILL IMPROVE OCCUPANTS' COMFORT.
C104554 - BLDG. 8A AHU-5 AND AHU-6 REPLACEMENT
C201447 - BLDG 40 RM B418 NIAID - AHU 4 AND 5 REPLACEMENT - DESIGN BUILD SERVICES .
C109665 (CONSTRUCTION SERVICES) - BLDG. 10, RECONFIGURE RMS. 9N105-9N109 & CONVERT BLDG. 10, RM. 9N101 TO TISSUE CULTURE ROOM WITH BSL2 CAPACITY - ARCHANA BHASIN
THE CONTRACT ACTION IS ESSENTIAL TO ENSURE CONSTRUCTION ACTIVITIES CONTINUE TO PROGRESS AND REMAIN COMPLIANT WITH ALL SAFETY, REGULATORY, AND FUNCTIONAL SPECIFICATIONS TO ENSURE THE FACILITY COMPLIES WITH THE HIGHEST INDUSTRY STANDARDS.
PROJECT INVOLVES INFRASTRUCTURE UPGRADES ESSENTIAL FOR BIOSAFETY, BIOSECURITY, AND RESEARCH CONTINUITY.
C104554 - BLDG. 8A AHU-5 AND AHU-6 REPLACEMENT
C107062 BUILDING 82 INFRASTRUCTURE UPGRADES-CONSTRUCTION - SUPPLEMENTAL WORK WITHIN SCOPE PER SOW DATED 5/1/2025 - COR MIKE BONTA
FACILITIES AND MAINTENANCE MOD NLM BUILDING 38 1ST FLOOR & MEZZANINE RENOVATION PHASE 2 AND 3 CHANGE ORDER #3 & #4 - 23 SEPT 2022 - OCT 30, 2025
C112880 - PROVIDE POTABLE HOT WATER OPTIONS STUDY, BUILDING 60
C109665 (CONSTRUCTION SERVICES) - SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE, PURSUANT TO NIH GUIDANCE DISTRIBUTED ON FEBRUARY 27,2025, TITLED UPDATE: CLASS APPROVALS FOR PROCUREMENT WHICH MAY CONTINUE.
C103469 -UPGRADE THE ELEVATOR SYSTEM INTO A NEW SYSTEM (TRACTION SYSTEM) DEMOLISH THE EXISTING ELEVATOR EQUIPMENT & REPAIR THE ELEVATOR PITS - LENIN ANDRADE
C105883 DESCRIPTION - MOD 16 TO INCORPORATE SUPPLEMENTAL WORK OUTLINED IN THE CO12 SOW. COR - ARCHANA BHASIN CO - DAN BURK CS - DAVID SEID VENDOR POC - STEVE O'REILLY
C109665 (CONSTRUCTION SERVICES) - BLDG. 10, RECONFIGURE RMS. 9N105-9N109 & CONVERT BLDG. 10, RM. 9N101 TO TISSUE CULTURE ROOM WITH BSL2 CAPACITY - ARCHANA BHASIN
C116343 C115843: BUILDING 6B AND 33, ABATEMENT OF NOISE FROM EQUIPMENT ON ROOF, NIH BETHESDA CAMPUS CS: CHRIS HSU CO: ZACH PRICE COR: EARL JOHNSON
C112783 BUILDING 35 NINDS VIVARIUM SYSTEMS UPGRADES CHANGE ORDER #3 COR: JULIANNA SAVIOLA
C104554 - BLDG. 8A AHU-5 AND AHU-6 REPLACEMENT
C112783 BUILDING 35 NINDS VIVARIUM SYSTEMS UPGRADES CHANGE ORDER #2 COR: JULIANNA SAVIOLA
C112359 - REPAIRS TO MULTI-LEVEL PARKING (MLP) GARAGE 8
C112783 BUILDING 35 NINDS VIVARIUM SYSTEMS UPGRADES CHANGE ORDER #1 COR: JULIANNA SAVIOLA
CHANGE ORDER #5
C105883 DESCRIPTION - MOD 14 TO INCORPORATE SUPPLEMENTAL WORK OUTLINED IN THE CO10 AND CO11 SOWS. COR - ARCHANA BHASIN CO - DAN BURK CS - DAVID SEID VENDOR POC - STEVE O'REILLY
C109665 (CONSTRUCTION SERVICES) - BLDG. 10, RECONFIGURE RMS. 9N105-9N109 & CONVERT BLDG. 10, RM. 9N101 TO TISSUE CULTURE ROOM WITH BSL2 CAPACITY - ARCHANA BHASIN
C110004 / C110005 / C110006 / C109358 - NLM BUILDING 38 1ST FLOOR & MEZZANINE RENOVATION PHASE 2 AND 3 CHANGE ORDER #3 & #4 - 23 SEPT 2022 - MAY 31, 2025
C109665 (CONSTRUCTION SERVICES) - BLDG. 10, RECONFIGURE RMS. 9N105-9N109 & CONVERT BLDG. 10, RM. 9N101 TO TISSUE CULTURE ROOM WITH BSL2 CAPACITY - ARCHANA BHASIN
C116343 C115843: BUILDING 6B AND 33, ABATEMENT OF NOISE FROM EQUIPMENT ON ROOF, NIH BETHESDA CAMPUS CS: CHRIS HSU CO: BRYAN BURGEE COR: EARL JOHNSON
C107062 - BUILDING 82 INFRASTRUCTURE UPGRADES-CONSTRUCTION
C103469 -UPGRADE THE ELEVATOR SYSTEM INTO A NEW SYSTEM (TRACTION SYSTEM) DEMOLISH THE EXISTING ELEVATOR EQUIPMENT & REPAIR THE ELEVATOR PITS - LENIN ANDRADE
C109665 (CONSTRUCTION SERVICES) - BLDG. 10, RECONFIGURE RMS. 9N105-9N109 & CONVERT BLDG. 10, RM. 9N101 TO TISSUE CULTURE ROOM WITH BSL2 CAPACITY - ARCHANA BHASIN
C111118 - DESIGN-BUILD SERVICES TO CREATE TWO NIAID OFFICES, BLDG 10, ROOMS 5-3763 AND 5-5763 COR: ARCHANA BHASIN PO: PETER KIM
C108842 - SUB BASEMENT VENTILATION IMPROVEMENTS, BLDG 11, VANESSA ARGOTE MACIA [21-003465]
C112783 BUILDING 35 NINDS VIVARIUM SYSTEMS UPGRADES COR: JULIANNA SAVIOLA
CHANGE ORDER #2 PERIOD OF PERFORMANCE EXTENSION AND HISTORICAL RESTORATION
C109665 (CONSTRUCTION SERVICES) - BLDG. 10, RECONFIGURE RMS. 9N105-9N109 & CONVERT BLDG. 10, RM. 9N101 TO TISSUE CULTURE ROOM WITH BSL2 CAPACITY - ARCHANA BHASIN
DESIGN-BUILT SERVICE RENOVATE ROOM 5B55 & 5B55A NCI LAB & OFFICE
CHANGE ORDER #1 FOR LUMINOUS CEILING MATERIAL FINAL NEGOTIATED PRICE
C107062 - BUILDING 82 INFRASTRUCTURE UPGRADES-CONSTRUCTION
C109123 - THIS PROJECT WILL BE COMBINING ROOMS 3B76, 3B80, 3B80, AND 3A75 INTO ONE CONSOLIDATED SPACE FOR A NINDS BASIC CELL-BIOLOGY LABORATORY FOR A RECRUIT; AND DOING MINOR RENOVATION TO ROOM 3C55 - JOSE MOREL-LOPEZ
C109356 - NINDS TISSUE CULTURE & MICROSCOPE LAB RENOVATION COR: BRIAN WEINMEISTER CO: MARIO HENRIQUEZ
C105883 DESCRIPTION - MOD 12 TO INCORPORATE SUPPLEMENTAL WORK WITHIN SCOPE OUTLINED IN THE CO9 SOW. COR - ARCHANA BHASIN CO - DAN BURK CS - DAVID SEID VENDOR POC - STEVE O'REILLY
C112679 - DESIGN AND CONSTRUCTION SERVICES, NICHD 3RD FLOOR DR. ROGERS LAB RENOVATION, BLDG. 6B
DESIGN-BUILT SERVICE RENOVATE ROOM 5B55 & 5B55A NCI LAB & OFFICE
C109079/C109082 - CONSTRUCTION OFFICE RENOVATION/C109082 TEMS RENOVATION BUILDING 50
CHANGE ORDER #1 FOR LUMINOUS CEILING MATERIAL NOT TO EXCEED
DESIGN-BUILT SERVICE RENOVATE ROOM 5B55 & 5B55A NCI LAB & OFFICE
C109123 - THIS PROJECT WILL BE COMBINING ROOMS 3B76, 3B80, 3B80, AND 3A75 INTO ONE CONSOLIDATED SPACE FOR A NINDS BASIC CELL-BIOLOGY LABORATORY FOR A RECRUIT; AND DOING MINOR RENOVATION TO ROOM 3C55 - JOSE MOREL-LOPEZ
C106560 - CONSTRUCTION SERVICES TO RENOVATE ROOM 311A BUILDING 103 ANIMAL CENTER LOCATED IN POOLESVILLE, FERDINAND REYES [22-000444]
Business Details
- UEI
- N6V9T93Y6F25
- CAGE Code
- 64AW3
- Address
- 125 E ELM ST STE 300
CONSHOHOCKEN, PA 194284150 - Congressional District
- PA-04
- Phone
- 2154986984
Parent Company
NEW AGE DEVELOPMENT GROUP, LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov