MTFA ARCHITECTURE, P.L.L.C.
ARLINGTON, VIRGINIA 222073744
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541310 | $16.57M | 153 |
| 541330 | $88K | 5 |
Contract Awards
50 awards found
THIS MOD IS TO DEOBLIGATE THE REMAINING UNUSED FUNDS ($79,891.99) TO CLOSE OUT THIS PROJECT.
ADD MORE FUNDS IN AMOUNT OF $50,846 FOR PREDESIGN WORK ITEMS 1 THROUGH 4 AND EXTEND POP 155 DAYS PER SCOPE OF WORK DATED JULY 14, 2025 FOR MISCELLENOUS CONCRETE REPAIRS AT DEPART OF ENERGY LOCATED T 1000 INDEPENDENCE AVE, SW WASHINGTON, DC 20585.
TITLE I ARCHITECT/ENGINEER (A/E) SERVICES TO CONDUCT CONDITION ASSESSMENT AND CRACK MONITORING ON THE WORLD WAR II MEMORIAL LOCATED IN WASHINGTON, D.C.
PERFORM TITLE I AND II A/E SERVICES FOR EXTERIOR ENVELOPE AND DRAINAGE REPAIRS AT THE CUSHWA WAREHOUSE AND WILLIAMSPORT POWER GENERATING STATION FOR THE CHESAPEAKE & OHIO CANAL HISTORICAL PARK.
INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT FOR ARCHITECT AND ENGINEER SERVICES COVERING THE METROPOLITAN AREA OF WASHINGTON, DISTRICT OF COLUMBIA
ADD'L FUNDS FOR CLIN 0005 LABOR
ADD'L FUNDS FOR CLIN 0007 LABOR
ADD'L FUNDING FOR CLIN 0008 LABOR
47PM0124F0036 PS0001 - MOD - AE SERVCES RESTACK & EGRESS PHASES 3B-6 E PRETTYMAN COURT HOUSE - ADDS 3-D RENDERINGS/50-PERSON JURY ASSEMBLY CAPACITY. EXTENDS POP 120 DAYS (8/14/25 TO 12/12/25). LOCATION: 333 CONSTITUTION AVE. NW, WASHINGTON, DC 20001.
DEOBLIGATE ADDITIONAL FUNDS EXCESSION TO PROJECT - PCCS FUND AMOUNT NO LONGER BEING USED TO CLOSE OUT PROJECT.
DE-OBLIGATION
THIS IS A REQUEST FOR A PROPOSAL TO MODIFY THE DETENTION CELL BLOCK AT THE E. B. PRETTYMAN US COURTHOUSE
MODIFY 47PM0321F0015 TO DEOBLIGATE FUNDING (-$32,913.20)FOR THE RETAINING WALL DESIGN PCCS SERVICES.
ADD'L FUNDING FOR CLIN 0001 LABOR
ADD'L FUNDING FOR CLIN 0001 LABOR
ADD'L FUNDS FOR CLIN 0001 LABOR
CONTRACT CALL ORDER 47PF0019D0053 /47PM0325F0004, FOR THE DESIGN SERVICES ROOF REPLACEMENT AND STUCCO REPAIR, IS HEREBY TERMINATED FOR CONVENIENCE FOR THE GOVERNMENT PER 52.249-7 TERMINATION (FIXED-PRICE ARCHITECT-ENGINEER).
MOD TO PROVIDE CREDIT FOR THE POST CONSTRUCTION SERVICES FROM THE ORIGINAL CONTRACT
B1560 PCAS
A-E SLAB ANALYSIS AT BUILDING 9438
47PM0122F0014, MOD PS0008 - AE SERVICES FEASIBILITY STUDY - LBJ CHILD CARE CENTER - OFFICE SUITE OVERLAP RECONFIGURATION DESIGN RWA #5011858
A-E SLAB ANALYSIS AT BUILDING 9438
AE WILL PROVIDE TWO ADDITIONAL DESIGN SERVICES TO THE CDC RADIO ROOF REPLACEMENT PROJECT. ADDITIONAL TIME TO COMPLETE THE PROJECT HAS BEEN ADJUSTED TO MARCH 21, 2025.
47PM0122F0014, MOD PS0007 LBJ CHILD CARE CENTER - DESIGN & FEASIBILITY STUDY. POP EXTENDED 305 CALENDAR DAYS. RWA# N3429248.
GSA IS SEEKING A DESIGN A/E CONSTRUCTION SERVICES TO REPLACE THE EXISTING ROOF AND PATCH AND REPAIR THE EXTERIOR STUCCO AT THE WASHINGTON NATIONAL RECORDS CENTER.
ARCHITECTURE AND ENGINEERING SERVICES IN SUPPORT OF THE TROWBRIDGE HOUSE RENOVATION CONSTRUCTION PROJECT.
A-E SERVICES
ADD'L FUNDING FOR CLIN 0001 LABOR
THIS MODIFICATION IS TO PERFORM REMAINING WORK AFTER HOURS AT ADDITIONAL COST.
TASK ORDER 47PM0321F0015 WNRC RETAINING WALL DESIGN IS HEREBY MODIFIED TO THE CURRENT SCOPE TO EXTEND THE PERIOD OF PERFORMANCE, ADD WORK ITEMS, AND INCLUDE EQUITABLE ADJUSTMENT RATES.
ONS EXPANSION DESIGN-HUBERT H. HUMPHREY BUILDING, 200 INDEPENDENCE AVENUE, SW, WASHINGTON, DC 20201 IS MODIFIED TO EXERCISE OPTION 1-SCIF EXPANSION,PROVIDE DEMOLITION PLAN,DESIGN FURNITURE,AUDIO/VISUAL SPECIFICATIONS & PERFORM TESTING DETERMINATIONS.
ADD'L FUNDS FOR CLIN 0001
47PM0124F0036 - AE SERVCES RESTACK & EGRESS PHASES 3B-6 E PRETTYMAN COURT HOUSE - DEVELOP CONCEPTS FOR PHASE 3B-6 OF THE PRETTYMAN RESTACK PROJECT INTO 100% CONSTRUCTION DOCS AT PRETTYMAN US COURTHOUSE, 333 CONSTITUTION AVE. NW, WASHINGTON, DC 20001.
ADD'L FUNDS FOR CLIN 0001 LABOR
THE A/E CONTRACTOR SHALL DESIGN AND INSTALLATION OF THE NEW WATERPROOFING SYSTEMS THAT WILL NOT DISTURB OR DIMINISH THE INSTALLATION OR PERFORMANCE AT DEPARTMENT OF ENERGY FORRESTAL BUILDING LOCATED AT 1000 INDEPENDENCE AVE, WASHINGTON, DC 20585-0001
MOD TO DE-OBLIGATE FUNDS TO GET READY FOR CLOSE OUT PROCEDURES.
DE-OBLIGATING FUNDS TO START CLOSEOUT PROCEDURES.
DE-OBLIGATION START CLOSEOUT PROCESS.
MODIFICATION PS0002 FOR FACADE CLEANING STUDY AT 450 E ST NW WASHINGTON DC 20001 TO ADD ANCHOR ASSESSMENT PERIOD OF PERFORMANCE EXTENDED TO 11 29 2024
ADD FUNDING
ADDITIONAL SERVICES AS NOTED IN THE SOW DATED MAY 09, 2024. EXTEND THE PERIOD OF PERFORMANCE FOR THE PROJECT, PER THE SCOPE OF WORK DATED MAY 09, 2024
A-E SERVICES CHANGE ORDER TO SURVEY AN ADDITIONAL AREA.
AE SERVICES FOR ELEVATOR SHAFT REPAIR AT WILBUR J COHEN BUILDING.
47PM0122F0014, MOD PS0006 STRUCTURAL SECURITY DESIGN & PROPERTY LINE SURVEY. POP EXTENDED 154 CALENDAR DAYS. RWA# N2967387
EXTERIOR FACADE REPOINTING AND CLEANING TECHNICAL STUDY AT ELIJAH BARRETT PRETTYMAN BUILDING. PERIOD OF PERFORMANCE: MAY 22, 2024 THROUGH FEBRUARY 28, 2025
CONTRACT COST MODIFICATION NEEDED TO EXTEND THE POP FOR THE DESIGN OF THE EPA ROOF ANCHOR PROJECT. THIS WILL ALSO INCLUDE SHPO CONSULTATION, REPLACE LADDERS, AND REPLACE ROOF HATCH.
AE SERVICES ONS EXPANSION DESIGN, HUBERT H. HUMPHREY BUILDING, 200 INDEPENDENCE AVENUE, SW, WASHINGTON, DC 20201.
A-E SERVICES
47PM0223F0013 AE SERVICES FOR COLUMBIA PLAZA RENOVATIONS, STE. L217, 2401 E STREET, NW, WASHINGTON, DC 20037 IS MODIFIED TO ADD CONSTRUCTION ADMINISTRATION SERVICES.THE CONTRACT COMPLETION DATE WILL BE EXTENDED FROM APRIL 1, 2024 TO AUGUST 19, 2024.
TITLE III ARCHITECT/ENGINEER (A/E) SERVICES TO PROVIDE SUPPLEMENTAL CONSTRUCTION ADMINISTRATION SERVICES IN SUPPORT OF THE CONSTRUCTION PROJECT: NAMA REPAIR STRUCTURAL CRACKS AT THE WORLD WAR II MEMORIAL, A UNIT OF NATIONAL MALL AND MEMORIAL PARKS (
Business Details
- UEI
- ZKMQHL8YRMD5
- CAGE Code
- 5ABS9
- Address
- 3200 LEE HWY
ARLINGTON, VA 222073744 - Congressional District
- VA-08
- Phone
- 7035246616
Parent Company
MTFA ARCHITECTURE, P.L.L.C.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov