MPC S.R.L.
PISA, PISA 56128
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541330 | $218K | 65 |
| 541930 | $136K | 2 |
Contract Awards
50 awards found
LIV DESIGN AND CONSTRUCTION SAFETY COORDINATION FOR PROJECT LS-00274-4P INSTALLATION OF A NEW VPC INSPECTION TENT AND PROJECT LS-00139-4P VPC AREA UPGRADE DEPOT AREA, DARBY COMMUNITY, LIVORNO, ITALY
DSC AND CSC FOR PROJECTS ED-00341-8 - FIRE CODE COMPLIANCE B-202, CD3-00214-5J - EXTERIOR PAINT B-202, CD3-00216-5J - REPAIR COVERED WALKWAY B-202 FOR CASA TOSCANA BUILDING 202, CAMP DARBY, ITALY.
DESIGN SAFETY COORDINATOR (DSC) AND CONSTRUCTION SAFETY COORDINATOR (CSC) FOR PROJECT MS-00213-5P CERTIFY PULSETECH ALUMINUM STRUCTURE BUILDING 5050.
LIV CSC CONNECT BLDG. 113 UNDER POWER GENERATOR
DSC AND CSC FOR PROJECT EA-00109-4P LPS AIR TERMINAL PROTECTION AGAINST OVERTURNING DISPLACEMENT IN THE AMMUNITION STORAGE AREA, CAMP DARBY, ITALY.
DESIGN SAFETY COORDINATOR (DSC) AND CONSTRUCTION SAFETY COORDINATOR (CSC) FOR PROJECT ES-00122-4P REPLACE MAIN SPRINKLER PIPE IN BUILDING 5881, CAMP DARBY, ITALY.
CONSTRUCTION SAFETY COORDINATOR (CSC) FOR PROJECT MS-00383-1P - REPAIR DEPO EAST PERIMETER ROAD
DESIGN AND CONSTRUCTION SAFETY COORDINATION FOR PROJECT ES 00110-5P INSTALL GENERATOR BLDG. 5155 DEPOT AREA, DARBY COMMUNITY, LIVORNO, ITALY
DESIGN SAFETY COORDINATOR (DSC) FOR PROJECT JD1-00125-3P - CONNECT BUILDING 113 UNDER POWER GENERATOR.
DESIGN AND CONSTRUCTION SAFETY COORDINATORS FOR PROJECT ED 00212-2 REPLACE HP AND AHU BLDG. 206
LIV DSC REPAIR DEPO EAST PERIMETER ROAD
SOFA: DEOB CLIN 0001
SOFA REPLACEMENT CALL FOR 22F0358 AND ALSO ADDS REA AMOUNT
CONSTRUCTION SAFETY COORDINATOR (CSC) FOR PROJECT #MS-00197-3P- INSTALL PULSETECH DRIP SYSTEM IN WAREHOUSES BLDG 5040, 5070, 5080, 5090, DEPOT AREA DARBY COMMUNITY, LIVORNO, ITALY
CONSTRUCTION SAFETY COORDINATOR (CSC) FOR PROJECT #MS-00193-3P- INSTALL OVERHEAD LIFTING EQUIPMENT BUILDING 5150, DEPOT AREA, DARBY COMMUNITY, LIVORNO, ITALY.
LIV CSC REPAIR ROOF BUILDING 925
ADD FUNDING FOR THIRD PARTY INSPECTION SERVICES ON CLIN 0002 AND REPLACE W912GB22F0388 WITH CLIN0001 IN RESPONSE TO CONSTRUCTION CONTRACT W912GB22F0281
CONSTRUCTION SAFETY COORDINATOR (CSC) FOR PROJECT ED-00134-3J UPGRADE THE MIXING SINK EXHAUST AND VENTILATION SYSTEM BLDG 5144, DEPOT AREA, DARBY COMMUNITY, LIVORNO, ITALY.
COORDINATOR (CSC) FOR PROJECT # FS-00174-2P, REPLACE TWO AIR CONDITIONING (AC) UNITS AT BLDG. 5012
DSC AND CSC OF THE PROJECT ES-00161-4P REPLACE HEAT RECOVERY UNIT BLDG. 5130
BOUNTY HUNTER SITE UPGRADE
REPLACE BOILER WITH HEAT PUMP AT BLDG. 5012
CHANGE DIRECTION OF ROOF DRAINAGE SYSTEM BLDG. 204
CONSTRUCTION SAFETY COORDINATION FIRE CODE COMPLIANCE BLDG. 5050
CONSTRUCTION SAFETY COORDINATOR FOR FA-00200-0P, VANNINI ROAD, DARBY MILITARY COMMUNITY, LIVORNO, ITALY
CONSTRUCTION SAFETY COORDINATOR FOR W912PF-24-F-0099, DECONSTRUCT AND RECONSTRUCT FACILITY IN ASA, BUILDING 2023, DARBY MILITARY COMMUNITY, ITALY
CONSTRUCTION SAFETY COORDINATOR FOR PROJECT AA1-00150-2P, DEMOLISH AND RECONSTRUCT FACILITY IN ASA, BUILDING 2022
DESIGN SAFETY COORDINATION INSTALL OVERHEAD LIFTING EQUIPMENT BUILD. 5150
DESIGN SAFETY COORDINATION INSTALL PULSETECH DRIP SYSTEM IN WAREHOUSES BLDG. 5040 5070 5080 5090
DESIGN SAFETY COORDINATION ROOF REPAIR BLDG. 925
TAXI-INTERPRETER HOUSING SUPPORT SERVICE, CAMP DARBY, TIRRENIA, PISA, ITLAY
DESIGN SAFETY COORDINATION UPGRADE SINK EXHAUST BLDG. 5144
CSC REPAIR A/C BLDG. 925
DSC REPLACE 2 A/C BLDG 5012 DSC REPLACE BOILER WITH H/P BLDG. 5012
DESIGN AND CONSTRUCTION SAFETY COORDINATION PROJECT PD1 00204-0P "REPAIR WEST PERIMETER ROAD DEPOT".
DESIGN AND CONSTRUCTION SAFETY COORDINATION REPLACE BOILER BLDG. 101
FY22 BPA THIRD PARTY INSPECTION SERVICES
SOFA: ISB-23-0477 ITALY
SOFA DC-23-0089 ITALY
TAXI TRANSPORTATION AND TRANSLATION SERVICE FOR THE LIVORNO HOUSING OFFICE AT CAMP DARBY, TIRRENIA, PISA, ITALY
CONSTRUCTION SAFETY COORDINATOR
CONSTRUCTION SAFETY COORDINATION FOR PROJECT AA1-00149-2P DECONSTRUCT AND RECONSTRUCT FACILITY IN ASA BLDG. 2021
DESIGN AND CONSTRUCTION SAFETY COORDINATION FOR PROJECT TO REPLACE FIVE EXHAUST UNIT BLDG. 5510
DESIGN & CONSTRUCTION SAFETY COORDINATION FOR PROJECT REPAIR BRIDGE ASPHALT & CONCRETE SURFACE, ASA
CONSTRUCTION SAFETY COORDINATION FOR MAINTENANCE AND REPAIR OF ROOFS AND ANNUAL CERTIFICATION OF ROOF SAFETY DEVICES, USAG-ITALY, DMC
CONSTRUCTION SAFETY COORDINATION FOR FIRE CODE COMPLIANCE BLDG 5040
DESIGN & CONSTRUCTION SAFETY COORDINATION FOR PROJECT EA-00058-2P RESTORE WATER WELL 1 & 2 PASA AT CAMP DARBY, TIRRENIA PISA ITALY
DESIGN SAFETY COORDINATION FOR PROJECT TO REPLACE FIVE EXHAUST UNIT BLDG. 5510
DESIGN AND CONSTRUCTION SAFETY COORDINATION FOR PROJECT TO REPLACE SKYLIGHT AT BLDG #5881
FY20 BPA THIRD PARTY INSPECTION SERVICES
Business Details
- UEI
- JZKTK1H2CD49
- CAGE Code
- AK242
- Address
- VIA PADRE AGOSTINO DA MONTEFELTRO 15
PISA, 56128
Parent Company
MPC S.R.L.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov