MITOMO MARUTAKA JV
OKINAWA, OKINAWA 904-2171
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 561210 | $9.26M | 90 |
| 236220 | $3.43M | 7 |
| 238990 | $3.15M | 29 |
| 334419 | $106K | 2 |
| 221122 | $84K | 4 |
| 237130 | $0 | 1 |
Contract Awards
50 awards found
ADMINISTRATIVE MOD TO INCREASE DOLLAR AMOUNT DUE TO EXCHANGE RATE CORRECTION. KDN202 PROVIDE ADDITIONAL PWR TO HANGAR
MODIFICATION TO SUMMARIZE WA ISSUED DURING 6 AUG 2024 TO 30 SEP 2024 AND TO DEOBLIGATE REMAINING FUNDS FROM BOSC BTO#3 - CFAO091 BULK SAMPLE TEST LBP & ASBESTOS, CFAO, JAPAN
BOSC BTO#4 FOR CNIC EMERGENCY REPAIRS: SUMMARIZE WORK AUTHORIZATIONS AND DE-OBLIGATE UNUSED FUNDS
BOSC - BLANKET TASK ORDER (BTO) #1 TO PERFORM ACM/LBP SAMPLING: MODIFICATION TO DE-OBLIGATE UNUSED FUNDS
BOSC TO CFAO086_REPAIR REPLACE ROLLUP DOORS @ MULTIPLE LOCATIONS: MODIFICATION TO ADD ROLLUP DOOR REPLACEMENT AT CSH B8226 AND ADD ABATEMENT WORK
MODIFICATION TO ADJUST TASK ORDER AMOUNT TO ACTUAL PAID AMOUNT.
MODIFICATION P00001 TO BOSC BTO#4 FOR CNIC EMERGENCY REPAIRS, JAPAN.
MODIFICATION TO DE-OBLIGATE EXCESS FUNDS DUE TO THE CHANGE IN THE FISCAL YEAR 2024 BUDGET EXCHANGE RATE. ALSO, TO SUMMARIZE AND MATCH WITH ALL WORK AUTHORIZATION AMOUNT ISSUED DURING THE TASK ORDER POP.
MODIFICATION TO DE-OBLIGATE EXCESS FUNDS DUE TO CHANGE OF FY 2024 BER FROM JPY139.1635/$1 TO JPY164.5398/$1.
MODIFICATION TO DE-OBLIGATE EXCESS FUNDS DUE TO THE CHANGE IN THE FISCAL YEAR 2024 BUDGET EXCHANGE RATE
MODIFICATION TO DE-OBLIGATE EXCESS FUNDS DUE TO CHANGE OF FY 2024 BUDGET EXECUTION RATE.
MODIFICATION TO DE-OBLIGATE EXCESS FUNDS DUE TO CHANGE OF FY 2024 BUDGET EXECUTION RATE.
MODIFICATION TO DE-OBLIGATE EXCESS FUNDS DUE TO CHANGE OF FY 2024 BUDGET EXECUTION RATE.
CSH115 REPLACE BOILERS AT BLDG.7144, CAMP SHIELDS, OKINAWA, JAPAN: ADMINISTRATIVE MODIFICATION TO DE-OBLIGATE EXCESS FUNDS DUE TO THE CHANGE IN THE FISCAL YEAR 2024 BUDGET EXCHANGE RATE FROM JPY139.1635/$1.00 TO JPY164.5398/$1.00
REPLACE WALK-IN FREEZER CONDENSING AND EVAPORATING UNIT, BLDG.6400, CAMP SHIELDS, OKINAWA, JAPAN. MODIFICATION TO DE-OBLIGATE EXCESS FUNDS DUE TO THE CHANGE IN THE FISCAL YEAR 2024 BUDGET EXCHANGE RATE
ADMINISTRATIVE MODIFICATION TO DE-OBLIGATE EXCESS FUNDS DUE TO THE CHANGE IN THE FISCAL YEAR 2024 BUDGET EXCHANGE RATE FROM JPY139.1635/$1.00 TO JPY164.5398/$1.00
REPLACE GENERATOR CONTROLLER AND ECU, BLDG.1110, WHITE BEACH, OKINAWA, JAPAN: ADMINISTRATIVE MODIFICATION TO DE-OBLIGATE EXCESS FUNDS DUE TO THE CHANGE IN THE FISCAL YEAR 2024 BUDGET EXCHANGE RATE
INSTALL BFP ON FIRE SUPPRESSION SYSTEM AT BLDG.6109, CAMP SHIELDS, OKINAWA, JAPAN: ADMINISTRATIVE MODIFICATION TO DE-OBLIGATE EXCESS FUNDS DUE TO THE CHANGE IN THE FISCAL YEAR 2024 BUDGET EXCHANGE RATE FROM JPY139.1635/$1.00 TO JPY164.5398/$1.00
MODIFICATION TO DE-OBLIGATE EXCESS FUNDS DUE TO THE CHANGE IN THE FISCAL YEAR 2024 BUDGET EXCHANGE RATE
ADMINISTRATIVE MODIFICATION TO DE-OBLIGATE EXCESS FUNDS DUE TO THE CHANGE IN THE FISCAL YEAR 2024 BUDGET EXCHANGE RATE FROM JPY139.1635/$1.00 TO JPY164.5398/$1.00
BOSC BTO#4 FOR CNIC EMERGENCY REPAIRS AT CFAO, JAPAN
BOSC BLANKET TASK ORDER AWARD - CFAO091 BULK SAMPLE TEST LBP & ASBESTOS
BOSC TO - KDN199 INSTALL ELECTRIC VEHICLE CHARGING FACILITIES (EVCF)AT BLDG.3571, KADENA AIR BASE, OKINAWA, JAPAN.
KDN202 PROVIDE ADDITIONAL PWR TO HANGAR_P00002 IS TO DE-OBLIGATE EXCESS FUNDS DUE TO THE CHANGE IN THE FISCAL YEAR (FY) 2024 BUDGET EXCHANGE RATE.
CSH155 REPLACE BOILERS HEATER AT BLDG. 7144, CAMP SHIELDS, OKINAWA, JAPAN
WBH189 RPL GENERATOR CONTROLLER AND ECU AT BLDG.1110, WHITE BEACH, OKINAWA, JAPAN.
BOSC TO - INSTALL BFP ON FIRE SUPPRESSION SYSTEM AT BLDG.6109, CAMP SHIELDS, OKINAWA, JAPAN
IN-SCOPE CHANGES FOR KDN202 PROVIDE ADDITIONAL PWR TO HANGAR, OKINAWA, JAPAN
CSH158 RPL WALK-IN FREEZER CONDENSING UNIT & EVAPORATING UNIT AT BLDG.6400, CAMP SHIELDS, OKINAWA, JAPAN.
KDN136 REPLACE AIR CONDITIONING UNITS IN VARIOUS BUILDINGS AT CFAO, OKINAWA, JAPAN.
MODIFICATION P00001 TO DESCOPE BLDG 106, AWASE, OKINAWA.
PROVIDE ADDITIONAL POWER TO HANGAR 3358 KADENA AIR BASE, OKINAWA, JAPAN
BOSC TO UEM025 REPLACE ACCESS DOORS AND POWER CONTROL PANELS FOR SHORE POWER STAND 5, 6 AND 7 AT NAVY PIER, WHITE BEACH, OKINAWA, JAPAN
MODIFICATION IS TO ADJUST THE TASK ORDER AMOUNT TO ACTUAL WORK PERFORMED DURING THE OPTION YEAR 1.
WBH213 REPLACE A LOADING DOCK LIFT AT BLDG.1710, WHITE BEACH, OKINAWA, JAPAN
BOSC - BLANKET TASK ORDER (BTO) #2 FOR VARIOUS REPAIR/REPLACEMENT AT CFAO
KDN 193 REPLACE DAMAGED SEWER LINE AT BLDG 522, KADENA
BOSC TO TO FUND OY3 ADMINISTRATIVE MODIFICATION TO REPLACE CFAO FUNDING FOR NAVCALAB AND MWLK PORTION.
KDN170 REPLACE AFFF TANK AT KDN-3355 & 3358
BOSC - BLANKET TASK ORDER (BTO) #1 TO PERFORM ACM/LBP SAMPLING AND ANALYSIS FOR CFAO.
CSH116 REPLACE BOOSTER WATER HEATERS AT BLDG. 7205
BOSC TO - CFAO087 REPLACE AIR COMPRESSORS @ MULTIPLE LOCATIONS
BOSC TO CFAO086_REPAIR REPLACE ROLLUP DOORS @ MULTIPLE LOCATIONS
BOSC TO TO FUND OY3
MODIFICATION TO DECREASE TASK ORDER AMOUNT.
REPAIR ROOF ON BLDG. 5114 HARIO HOUSING
WBH177_INSTALL FA TRANSMITTER UNIT WITH ANTENNA AND ASSOCIATED EQUIPMENT AT BLDG.1552TP, WHITE BEACH, OKINAWA, JAPAN.
REPLACE HVAC EQUIPMENT AT KDN-3571 - MODIFICATION TO ADD LBP ABATEMENT WORK DUE TO UNFORESEEN CONDITIONS
REPLACE WATER HEATER AT BLDG. 8235
N40084-19-D-2004 / TO N4008423F4615 2 COMBINED STATEMENT OF WORKS (SOWS) (1) REPLACE ROOFTOP EXHAUST VENTILATORS AND (2) REPAIR/REPLACE AHU SYSTEM AND CLEAN DUCT SYSTEM AT BUSH MEDICAL AND DENTAL CLINIC, B.4231, CAMP COURTNEY, OKINAWA, JAPAN
Business Details
- UEI
- UM9JN5UHHE71
- CAGE Code
- JSGF7
- Address
- 2-3-2, TAKAHARA
OKINAWA, 904-2171
Parent Company
MITOMO MARUTAKA JV
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov