ARLINGTON NATIONAL CEMETERY SHERIDAN AREA ROAD, MODIFICATION A00009, PROVIDES ALL LABOR AND MATERIALS NECESSARY TO PERFORM SR025, GRANT/TRAM STOP CONCRETE SCALING REPAIRS.
NP-JFK 1(2), NAMA 16(2), TRL(1) CM #17 INCREASE CONTRACT AMOUNT BY $3,500,000.00 NO CHANGE TO CONTRACT TIME
EXERCISE OPTION CLINS 0008 AND 0009 FOR ANC SCHLEY SHERMAN MEIGS AREA ROAD REPAIRS.
GENERAL SCOPE OF THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: MEIGS DRIVE, SHERMAN DRIVE, SCHLEY DRIVE AND CONNECTING INTERSECTIONS.
ARLINGTON NATIONAL CEMETERY MCPERSON (PHASE 1A-2A-2B) REPAIRS, MODIFICATION A00001 PROVIDES ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO PERFORM CHANGE ORDER MC002, SELFRIDGE GATE IMPROVEMENTS AND MC003, SECTION 46 CHANGES.
ARLINGTON NATIONAL CEMETERY SHERIDAN AREA PROJECT. MODIFICATION A00008 PROVIDES ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO PERFORM SE023, SE024, SE025.
NP GWMP 6(1) 7(2) CM #13 DECREASE CONTRACT AMOUNT BY $794,590.87 NO CHANGE TO CONTRACT TIME FINALIZE QUANTITIES
DEOBLIGATION OF UNUSED FUNDS FOR CLOSEOUT PURPOSES. ROOSEVELT WHEATON MILL & PAVE
ARLINGTON NATIONAL CEMETERY SHERIDAN AREA PROJECT, MODIFICATION A00007 PROVIDES ALL LABOR AND MATERIALS NECESSARY TO PERFORM SR019, SR020, SR021, SR022
ARLINGTON NATIONAL CEMETERY SHERIDAN AREA PROJECT, MODIFICATION A00006 PROVIDES ALL LABOR AND MATERIALS NECESSARY TO PERFORM SR016 (STRUCTURE E1 TOP REDESIGN), SR017 (ADD GRANT DRIVE CONCRETE WIRE MESH), SR018 (ADD COLOR TO MCCLELLAN CURB)
ARLINGTON NATIONAL CEMETERY ROOSEVELT MILL AND PAVE, MODIFICATION A00001 PROVIDES ALL LABOR AND MATERIALS NECESSARY TO PERFORM RW001, CURB AND INLET REPAIRS
ARLINGTON NATIONAL CEMETERY SHERIDAN AREA PROJECT, MODIFICATION A00005 PROVIDES ALL LABOR AND MATERIALS NECESSARY TO PERFORM SR012 (SHERIDAN CURB DEPTH), SR013 (SHERIDAN HANDHOLES), SR014 (RED SPRING BLUESTONE FRAME), SR015 (STRUCTURE C21 RISER)
GENERAL SCOPE OF THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION SECTION OF FARRAGUT DRIVE AND MCPHERSON DRIVE LOCATED AT ARLINGTON NATIONAL CEMETERY IN ARLINGTON, VIRGINIA.
ARLINGTON NATIONAL CEMETERY SHERIDAN AREA PROJECT, MODIFICATION A00004 PROVIDES ALL LABOR AND MATERIALS NECESSARY TO PERFORM SR011 CROOK WALK EXPOSED AGGREGATE CONCRETE.
THIS PROJECT IS TO MILL AND PAVE THE ROOSEVELT-WHEATON PARKING LOT.
MODIFICATION A00003 PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO PERFORM SR004, GRANT/SHERIDAN IRRIGATION CHANGES
MOD A00001, CASES SR 008, 009, 010. SECTION 37 AND MCCLELLAN CHANGES.
SANITARY SEWER LINE REPAIR AT ARLINGTON NATIONAL CEMETARY, ARLINGTON, VIRGINIA
PHASE I
NATIONAL PARK SERVICE (NPS) - NATIONAL CAPITAL AREA (NCA) - GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP): REPAIR TURKEY RUN PARK ROAD AND PARKING LOT PAVEMENT - CLOSE OUT AND DEOBLIGATE EXCESS FUNDING AND CANCEL UNEXERCISED OPTIONAL ITEMS.
MOBILIZATION / DEMOBILIZATION
THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: SHERIDAN DRIVE, WILSON DRIVE, MCCLELLAN DRIVE, AND THE WEEKS/GRANT LOOP.
MOBILIZATION / DEMOBILIZATION
NP-JFK 1(2), NAMA 16(2), TRL (1) CM #15 INCREASE CONTRACT AMOUNT BY $79,394.61 NO CHANGE TO CONTRACT TIME
NP-JFK 1(2), NAMA 16(2), TRL (1) CM #13 INCREASE CONTRACT AMOUNT BY $398,132.20 ADD 92 CALENDAR DAYS TO CONTRACT TIME
NP-JFK 1(2), NAMA 16(2), TRL (1) CM #12 INCREASE CONTRACT AMOUNT BY $2,066,338.17 NO CHANGE TO CONTRACT TIME
MEMORIAL AVENUE MILL & PAVE, ARLINGTON NATIONAL CEMETERY
NATIONAL PARK SERVICE (NPS) - NATIONAL CAPITAL AREA (NCA) - GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP): REPAIR TURKEY RUN PARK ROAD AND PARKING LOT PAVEMENT - MODIFICATION P00001 - ADDITIONAL FUNDING FOR GOVERNMENT REQUESTED CHANGE ORDERS.
NP-JFK 1(2), NAMA 16(2), TRL (1) CM #11 INCREASE CONTRACT AMOUNT BY $304,439.05 NO CHANGE TO CONTRACT TIME
NP-JFK 1(2), NAMA 16(2), TRL (1) CM #10 INCREASE CONTRACT AMOUNT BY $151,199.19 NO CHANGE TO CONTRACT TIME
NP-JFK 1(2), NAMA 16(2), TRL (1) CM #9 INCREASE CONTRACT AMOUNT BY $276,772.50 NO CHANGE TO CONTRACT TIME
MILLING
NATIONAL PARK SERVICE (NPS) - NATIONAL CAPITAL AREA (NCA) - GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP): REPAIR TURKEY RUN PARK ROAD AND PARKING LOT PAVEMENT
NP-JFK 1(2), NAMA 16(2), TRL (1) 693C7321C000013 CM #7 INCREASE CONTRACT AMOUNT BY $559,241.62 ADD 84 CALENDAR DAYS TO CONTRACT TIME
MOD 2 - DE-OBLIGATE MINIMUM GUARANTEE DUE TO ISSUANCE OF TASK ORDER
NP-JFK 1(2), NAMA 16(2), TRL (1) CM #6 INCREASE CONTRACT AMOUNT BY $1,806,567.05 NO CHANGE TO CONTRACT TIME
ANC PATTON DR MILL & PAVE
NP-JFK 1(2), NAMA 16(2), TRL (1) 693C7321C000013 CM #5 INCREASE CONTRACT AMOUNT BY $130,554.52 ADD 165 CALENDAR DAYS TO CONTRACT TIME
NP-JFK 1(2) NAMA 16(2) TRL (1) CM# 4 INCREASE CONTRACT AMOUNT BY $371,081.74 EXTEND CONTRACT TIME BY 45 CALENDAR DAYS
Business Details
- UEI
- JB27JATKQGK8
- CAGE Code
- 1V5W2
- Address
- 5470 LAFAYETTE PLACE
HYATTSVILLE, MD 207812347 - Congressional District
- MD-04
- Phone
- 2403754219
Parent Company
METRO PAVING CORP
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov