MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC
WASHINGTON, DISTRICT OF COLUMBIA 200023302
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $16.40M | 38 |
Contract Awards
26 awards found
NATIONAL CAPITAL PARKS EAST (NACE) AND GEORGE WASHINGTON MEMORIAL PARK (GWMP) - REPAIR GUARDRAILS
CONSTRUCT REPLACEMENT FISH HEALTH CENTER LAB AT WARM SPRINGS NFH
CONSTRUCT REPLACEMENT FISH HEALTH CENTER LAB AT WARM SPRINGS NFH
SHEN-REHAB STONE BARRIERS MP72.8 & 75.7
CHOH FY24 RESURFACE TOWPATH (MILEPOST 173.37-184.5)
MOD 1 - MODIFICATION FOR OVER EXCAVATION DUE TO POOR SOILS AND ALSO IT CHANGES DUES TO IRTM REVIEW
SAAN REHABILITATE HARRIS HOUSE
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND POP FROM 12/15/23 TO 12/22/23 DUE TO WATER LEAK AND FIELD TESTING.
PROJECT: ATHENS SOUTH BUILDING ENERGY IMPROVEMENTS AND DEFERRED MAINTENANCE ELIMINATION; MODIFICATION P00004 TO RECONFIGURE THE ELECTRICAL SERVICE TO THE BOILER PUMPS, AND TO REPLACE THE CHILLED WATER PUMP. LOCATION: SE, FORESTRY SCIENCE LABORATO
PROJECT: ATHENS SOUTH BUILDING ENERGY IMPROVEMENTS AND DEFERRED MAINTENANCE ELIMINATION; MODIFICATION P00003 TO REPLACE CEILING AND GRID TILES ON ROOM 236 TO ACCOMMODATE HVAC EQUIPMENT. LOCATION: SE, FORESTRY SCIENCE LABORATORY - 320 GREEN ST, AT
P00002, FOR THE ADDITIONAL WORK REQUIREMENTS NEEDED TO FINISH REHABILITATION OF QUARTERS 6 & 8.
CONSTRUCT REPLACEMENT FISH HEALTH CENTER LAB AT WARM SPRINGS NFH
THE PURPOSE OF THIS MOD IS TO ADD FUNDS FOR BENCHING THE PIT FOR THE CONNECTION AND OTHER ITEMS ASSOCIATED WITH THE EXCAVATION AND TO EXTEND POP FROM 9/15/23 TO 10/31/23.
PROJECT: ATHENS SOUTH BUILDING ENERGY IMPROVEMENTS AND DEFERRED MAINTENANCE ELIMINATION LOCATION: SE, FORESTRY SCIENCE LABORATORY -320 GREEN ST, ATHENS GA 30602-2044
P00001, FOR THE ADDITIONAL REPAIR REQUIREMENT FOR FL-ARML NWR-REHABILITATE QUARTERS 6 & 8
PROJECT: ATHENS SOUTH BUILDING ENERGY IMPROVEMENTS AND DEFERRED MAINTENANCE ELIMINATION LOCATION: SE, FORESTRY SCIENCE LABORATORY -320 GREEN ST, ATHENS GA 30602-2044
CONVERT ELKWALLOW SPRINGS TO WELLS & REPLACE WATER DISTRIBUTION SYSTEM
EES MIXED WASTE DOMESTIC WATERLINE - MODIFICATION TO UPDATE THE SCHEDULE OF ITEMS AND ADD ADDITIONAL FUNDS.
ATHENS SOUTH BUILDING ENERGY IMPROVEMENTS AND DEFERRED MAINTENANCE ELIMINATION
MODIFICATION TO DE-OBLIGATE EXCESS FUNDS AND CLOSEOUT THE CONTRACT
FL-ARML NWR-REHABILITATE QUARTERS 6 & 8
MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR DESIGN-BUILD CONSTRUCTION SERVICES FOR THE DEPARTMENT OF INTERIOR AND FOREST SERVICE
MULTIPLE-AWARD TASK ORDER CONTRACTS (MATOC) FOR ALT/REPAIR CONSTRUCTION SERVICES FOR THE CONTINENTAL US AND HAWAII IN ANY STATE OR US TERRITORY FOR THE DEPARTMENT OF INTERIOR (DOI) AND FOREST SERVICE (FS)
CONVERT ELKWALLOW SPRINGS TO WELLS & REPLACE WATER DISTRIBUTION SYSTEM
EES MIXED WASTE DOMESTIC WATERLINE
REPLACE HVAC SYSTEM AT TELLICO RANGER STATION. INCLUDES ALL ZONES EXCEPT EXISTING FRONT OFFICE.
Business Details
- UEI
- PDALBDGL27C4
- CAGE Code
- 786X7
- Address
- 16 FLORIDA AVE NE
WASHINGTON, DC 200023302 - Congressional District
- DC-98
- Phone
- 3472668265
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov