LEISNOI DIVERSIFIED SERVICES, LLC
ANCHORAGE, ALASKA 995033974
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 562910 | $46.68M | 22 |
| 236220 | $2.10M | 22 |
| 541620 | $1.43M | 4 |
| 541330 | $500 | 5 |
Contract Awards
30 awards found
MINIMUM GUARANTEE TASK ORDER FOR ASSOCIATED SEAPORT NXG MAC AWARDS.
MISSISSIPPI PHOSPHATE PHASE 1C IN PASCAGOULA, MS. MODIFICATION 19 ADDS FUNDING FOR ADDITIONAL WORK NEEDED ON POND 5 TO PURCHASE AND INSTALL ADDITIONAL CLOSURETURF AND WORK ON THE WATER RETURN DITCH.
MISSISSIPPI PHOSPHATE PHASE 1C IN PASCAGOULA, MS. MODIFICATION 18 ADDS FUNDING FOR ADDITIONAL WORK NEEDED ON POND 5 TO CREATE A NEW ACCESS ROAD, AND WORK ON THE WEST WATER RETURN DITCH.
TASK 2 -ANNUAL SURFACE & GROUNDWATR
NMAAHC: REPAIR HAZMAT TANK NECK.
MISSISSIPPI PHOSPHATE PHASE 1C IN PASCAGOULA, MS. MODIFICATION 15 EXERCISES THE REMAINING OPTIONS AND FULLY FUNDS THE CONTRACT.
NMAAHC: REPAIR HAZMAT TANK NECK.
NASM-UHC CONSTRUCT UTILITIES FOR HAZMAT STORAGE.
NMAAHC: REPAIR HAZMAT TANK NECK.
NMAAHC: REPAIR HAZMAT TANK NECK.
NASM-UHC CONSTRUCT UTILITIES FOR HAZMAT STORAGE.
MISSISSIPPI PHOSPHATE PHASE 1C IN PASCAGOULA, MS. THIS PHASE WILL INCLUDE THE EARTHWORK NECESSARY TO COMPLETE THE REMAINING SLOPE AREA, INSTALL GEOTEXTILE TURF PRODUCT, WATER RETURN DITCH AND POND 5 AREAS. MODIFICATION 11 IS TO ADD INCREMENTAL FUNDIN
THIS IS TASK ORDER NO. 33330223FF0010551, W.O. NO. 06, AGAINST IDIQ NO. 33330222DF0010060, TO RENOVATE BUILDING 1 BIO-REPOSITORY - REPLACE LAB EPOXY FLOOR.
6A CONDENSING RE-PIPE
SERVICE, TO REPLACE RASMUSSEN POWER CONDITIONER.
NASM-UHC CONSTRUCT UTILITIES FOR HAZMAT STORAGE.
NASM-UHC CONSTRUCT UTILITIES FOR HAZMAT STORAGE.
MISSISSIPPI PHOSPHATE PHASE 1C IN PASCAGOULA, MS. THIS PHASE WILL INCLUDE THE EARTHWORK NECESSARY TO COMPLETE THE REMAINING SLOPE AREA, INSTALL GEOTEXTILE TURF PRODUCT, WATER RETURN DITCH AND POND 5 AREAS. MODIFICATION 9 IS A CHANGE ORDER MODIFICATIO
NASM-UHC CONSTRUCT UTILITIES FOR HAZMAT STORAGE.
NMAAHC: REPAIR HAZMAT TANK NECK.
MISSISSIPPI PHOSPHATE PHASE 1C IN PASCAGOULA, MS. THIS PHASE WILL INCLUDE THE EARTHWORK NECESSARY TO COMPLETE THE REMAINING SLOPE AREA, INSTALL GEOTEXTILE TURF PRODUCT, WATER RETURN DITCH AND POND 5 AREAS. MODIFICATION 7 IS TO OBLIGATE INCREMENTAL FU
MISSISSIPPI PHOSPHATE PHASE 1C IN PASCAGOULA, MS. THIS PHASE WILL INCLUDE THE EARTHWORK NECESSARY TO COMPLETE THE REMAINING SLOPE AREA, INSTALL GEOTEXTILE TURF PRODUCT, WATER RETURN DITCH AND POND 5 AREAS. MODIFICATION 6 IS INCREASING THE CEILING AND
SERVICE, TO REPLACE RASMUSSEN POWER CONDITIONER.
NMAAHC: REPAIR HAZMAT TANK NECK.
THIS IS T.O. NO. 33330222FF0010461, W,O, NO. 002, AGAINST IDIQ NO. 33330222DF0010060, TO CLEAN AND PRIME HISTORIC GATES, AT AIB. PROJECT # 22108 CLEAN AND PRIME HISTORIC CAST IRON GATES ELEMENTS FOR ARTS AND INDUSTRIES BUILDING (AIB).
TASK 3 - FIELD EFFORT (ADDITI
NASM-UHC CONSTRUCT UTILITIES FOR HAZMAT STORAGE.
HQ 6A CONDENSING RE-PIPE PROJECT
MISSISSIPPI PHOSPHATE PHASE 1C IN PASCAGOULA, MS. THIS PHASE WILL INCLUDE THE EARTHWORK NECESSARY TO COMPLETE THE REMAINING SLOPE AREA, INSTALL GEOTEXTILE TURF PRODUCT, WATER RETURN DITCH AND POND 5 AREAS.
MISSISSIPPI PHOSPHATE PHASE 1C IN PASCAGOULA, MS. THIS PHASE WILL INCLUDE THE EARTHWORK NECESSARY TO COMPLETE THE REMAINING SLOPE AREA, INSTALL GEOTEXTILE TURF PRODUCT, WATER RETURN DITCH AND POND 5 AREAS.
Business Details
- UEI
- G951D1PWEEA5
- CAGE Code
- 7S4V8
- Address
- 101 W BENSON BLVD STE 202
ANCHORAGE, AK 995033974 - Congressional District
- AK-00
- Phone
- 9072226900
Parent Company
LEISNOI DIVERSIFIED SERVICES, LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov