KOVILIC CONSTRUCTION CO INC
FRANKLIN PARK, ILLINOIS 601311233
Contract Awards
38 awards found
CLOSEOUT AND DEOB MODIFICATION
PROJECT VA ERFO FS GWJEF808 2020-2(2) THE PROJECT CONSISTS OF FINALIZING THE DESIGN FOR REPLACING LICK CREEK TRAIL BRIDGE AND CONSTRUCTION OF A TEMPORARY ACCESS TRAIL, TEMPORARY HELICOPTER LANDING PAD, TRAIL BRIDGE REPLACEMENT, AND OTHER MISCELLANEO
PROJECT MD NP BAWA 1(12), 2(12) THE PROJECT CONSISTS OF THE REPAIR AND REHABILITATION OF STRUCTURES NO. 3530-003P, 3530-004P, AND 3530-021P WITHIN THE BALTIMORE-WASHINGTON PARKWAY. THE WORK INCLUDES DECK REPAIR, CAPSTONE, JOINTS REPAIRS, RAILING REP
MD ERFO NPS CHOH 2019-1(1) CM #2 INCREASE CONTRACT AMOUNT BY $138,395.00 EXTEND THE CONTRACT BY 209 CALENDAR DAYS.
SNAKE CREEK GATEWELL COVERS, GARRISON DAM
NP-BLRI 2A16 693C7323C000016 CM #3 INCREASE CONTRACT AMOUNT BY $1,328,384.00 EXTEND CONTRACT TIME TO JULY 25, 2025
CO ~ ROCKY MOUNTAIN ARSENAL NATIONAL WILDLIFE REFUGE (NWR) ~ LOW WATER CULVERT YOUR COMPANY WAS SELECTED TO PROVIDE CONSTRUCTION SERVICES AT THE ROCKY MOUNTAIN ARSENAL (RMA) NATIONAL WILDLIFE REFUGE (NWR), 6550 GATEWAY ROAD, COMMERCE CITY, CO 8002
FRL MACHINERY PLATFORM CONCRETE REHABILITATION
GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL MODIFICATION 06: ADD FUNDING FOR MOD 05 TIME EXTENSION.
NP-BLRI 2A16 693C7323C000016 CM #2 INCREASE CONTRACT AMOUNT BY $1,275,850.00 EXTEND CONTRACT TIME BY 215 CALENDAR DAYS
GARRISON PROJECT SPILLWAY BRIDGE CONCRETE REPAIRS
GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL MODIFICATION 06: ADD FUNDING FOR MOD 05 TIME EXTENSION.
DC ERFO NPS CHOH 2019-1(1) CM #3 DECREASE CONTRACT AMOUNT BY $25,050.00 FINALIZE QUANTITIES
WV NP NERI 107(2) THE PROJECT CONSISTS OF GRANULAR BACKFILL, MSE WALL CONSTRUCTION, DEEP GEOTECHNICAL PATCHES, PIPE CULVERTS, INLETS, MANHOLES, CURB AND GUTTER, ASPHALT PAVED WATERWAY, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES ROADWAY EXCAVATION,
GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL MODIFICATION 04: TO ADD WORK ASSOCIATED WITH RFP 06 - REMOVE A TOTAL OF 8 (3 < 5" AND 5 > 12" DIAMETER) BASED ON CONTRACTED UNIT PRICING. TREES WERE DIS
CO ~ ROCKY MOUNTAIN ARSENAL NATIONAL WILDLIFE REFUGE (NWR) ~ LOW WATER CULVERT YOUR COMPANY WAS SELECTED TO PROVIDE CONSTRUCTION SERVICES AT THE ROCKY MOUNTAIN ARSENAL (RMA) NATIONAL WILDLIFE REFUGE (NWR), 6550 GATEWAY ROAD, COMMERCE CITY, CO 8002
GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL MODIFICATION 03: TO ADD WORK ASSOCIATED WITH RFPS 03 - CAST IN PLACE CONCRETE; RFP 04 - ADDITIONAL DOWNSTREAM BUTTRESS PER RFI #20; AND RFP 05 - LINER TERMINATIONS OUTSI
THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDS AND CLOSE OUT THE CONTRACT.
NP BLRI 1G28, 1N19 CM #3 DECREASE CONTRACT AMOUNT BY $6,000.00 FINALIZE QUANTITIES
GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL MODIFICATION 02: TO ADD WORK ASSOCIATED WITH RFP 01 - RFI #6 TRIBUTARY #3 STORM ISSUES AND RFP 02 - TRIBUTARY #3 CLEAR WATER DIVERSION (CWD) PIPE
ND FLAP 704(1) AND 795(1) MAGPIE &WHITETAIL CROSSINGS EXERCISE OPTION X
ND FLAP 704(1) AND 795(1) MAGPIE &WHITETAIL CROSSINGS
MT FS ERFO 2018(1)-73(1), HELENA-LEWIS & CLARK 2018 REPAIRS, PHASE 1 PROJECT CLOSEOUT
PROJECT MD ERFO NPS CHOH 2019-1(1): THE PROJECT CONSISTS OF EMBANKMENT SLOPE REPAIR WITH RIPRAP SLOPE AND ROCKERY WALL CONSTRUCTION, PAVEMENT PATCHING, GUARDRAIL, SHOULDER REPAIRS, DRAINAGE REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE WORK INCLUDE
SD FTBL BCB(1) HORSE SOLDIER ROAD TO FORT MEADE THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDS AND CLOSE OUT THE CONTRACT.
PROJECT NC NP BLRI 2A16 THE PROJECT CONSISTS OF THE REHABILITATION OF BIG PINE CREEK BRIDGE #6, BIG PINE CREEK BRIDGE #3, AND BRUSH CREEK BRIDGE #1 BETWEEN MM 223.00 AND MM 228.00. THE WORK INCLUDES REHABILITATION OF THE SUBSTRUCTURE AND SUPERSTRUC
ND - VALLEY CITY WETLAND MANAGEMENT DISTRICT-REHAB TOMAHAWK DAM
PROJECT DC ERFO NPS CHOH 2019-1(1) THE PROJECT CONSISTS OF ASPHALT CONCRETE PAVEMENT RESURFACING; GRAVEL OVERLAY; BRIDGE SCOUR REPAIR; CULVERT REPLACEMENT AND REMOVAL; RIPRAP; MINOR REINFORCED CONCRETE PAVEMENT PATCHING; TEMPORARY DIVERSION BERM; FI
NP-NACE TRL(1) CM #2 DECREASE CONTRACT AMOUNT BY $10,700.00 EXTEND CONTRACT TIME BY 39 CALENDAR DAYS FINALIZE THE EXISTING QUANTITIES
NP-GUIS 15(3) 693C7321C000022 CM #3 DECREASE CONTRACT AMOUNT BY $0.01 EXTEND CONTRACT TIME BY 7 CALENDAR DAYS
MULTI-BRIDGE REPAIR AT SENEY NWR MOD 2: SUPPLEMENTAL AGREEMENT
PROJECT NP BLRI 1G28, 1N19 THE PROJECT CONSISTS OF PERFORMING MAINTENANCE REPAIRS ON TWO BRIDGES ON THE BLUE RIDGE PARKWAY. THE WORK INCLUDES THE REPLACEMENT OF BRIDGE BEARINGS, AND OTHER MISCELLANEOUS WORK.
GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL
EAST LYNN BRIDGE BEARING REPLACEMENT
JWF SPLLWAY BRIDGE REHABILITATION, HAYSI, VA
ND - VALLEY CITY WETLAND MANAGEMENT DISTRICT-REHAB TOMAHAWK DAM
ND FLAP 136(1) & 145(1) TEWAUKON STRUCTURES
MT FS ERFO 2018(1)-73(1), HELENA-LEWIS & CLARK 2018 REPAIRS, PHASE 1 INCLUDES EARTHWORK, SUBGRADE AND ROAD BASE CONSTRUCTION, SLOPE CONSTRUCTION, BITUMINOUS SURFACE TREATMENT, AND DRAINAGE INFRASTRUCTURE IN THE LEWIS AND CLARK NATIONAL FOREST
Business Details
- UEI
- EVBUYJTMKL45
- CAGE Code
- 0RBX9
- Address
- 3721 CARNATION ST
FRANKLIN PARK, IL 601311233 - Congressional District
- IL-03
- Phone
- 8476714978
Parent Company
KOVILIC CONSTRUCTION CO INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov