JLL-RER SOLUTIONS, LLC
WASHINGTON, DISTRICT OF COLUMBIA 200054632
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541350 | $58.34M | 17 |
| 561210 | $8.40M | 187 |
| 523930 | $-304,046.01 | 2 |
Contract Awards
50 awards found
MODIFICATION TO DEOBLIGATE EXCESS FUNDS FOR THE CLOSE-OUT OF ORDER FOR EMERGENCY CALL BACK OVERTIME REQUESTS FOR MAINTENANCE SERVICES AT FOUR LOCATIONS IN MINNESOTA.
MODIFICATION TO DEOBLIGATE EXCESS FUNDS FOR CLOSE-OUT OF ORDER FOR EMERGENCY POWER TRACE & CIRCUIT MAPPING AT THE MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
MODIFICATION TO DEOBLIGATE FUNDING FOR CLOSE-OUT OF ORDER TO REPLACE PLATES ON THE CHILLED WATER HEAT EXCHANGER AT THE MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
ORDER FOR FIRE PUMP PIPING AND VALVE REPAIR AT THE MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
THE REPAIR ROOF DRAIN LEAK ON 6TH FLOOR USAO SERVICES WILL BE PERFORMED AT THE DIANA E. MURPHY U. S. COURTHOUSE IN MINNEAPOLIS, MN.
TO PURCHASE ANALOG TIME CLOCKS, REPAIR THE STEAM LEAK AND REKEY THE DOORS AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS.
TO DEOBLIGATE EXCESS FUNDS FOR A SNOW REMOVAL AWARD AT THE SOCIAL SECURITY ADMINISTRATION, AUSTIN, MN.
TO DEOBLIGATE FUNDS FROM A SNOW AND ICE REMOVAL SERVICES AWARD AT THE DEVITT U.S. COURTHOUSE AND FEDERAL BUILDING IN FERGUS FALLS, MN.
REFRESH MAINTENANCE OFFICE 3RD FLOOR PROJECT, MURPHY COURTHOUSE, MINNEAPOLIS, MN. INSTALL GYPSUM BOARD WALLS WITH HOLLOW METAL DOORS, INFILL EXISTING OPENING, PAINT WALLS, DOORS, FRAMES TO MATCH EXISTING, VINYL WALL BASE ON NEW WALLS.
MODIFICATION TO DEOBLIGATE EXCESS FUNDS ON THE ORDER FOR RE-KEYING AT THE BURGER U.S. COURTHOUSE, ST. PAUL, MN
TO REPLACE CONTROLLER AND LOCKS, REPAIR SPRINKLER PIPE AND DOOR, INSTALL SAFETY FILMS AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN.
MODIFICATION TO EXERCISE 3-MONTH EXTENSION OF CONSOLIDATED FACILITIES MANAGEMENT SERVICES AT 4 LOCATIONS IN MINNESOTA.
MOD TO SHORTEN POP AND DEOBLIGATION OF UNUSED FUNDS FOR CLOSEOUT.
MODIFICATION TO DEOBLIGATE FUNDS DUE TO DEDUCTIONS TAKEN OVER THE LIFE OF THE CONTRACT FOR CONSOLIDATED FACILITIES MANAGEMENT SERVICES AT FOUR LOCATIONS IN MINNESOTA
FIRST FLOOR ASBESTOS REMOVAL PROJECT, EDWARD J. DEVITT U. S. COURTHOUSE & FEDERAL BUILDING, FERGUS FALLS, MN. INCREASE COST TO REPLACE ORIGINAL SUBCONTRACTOR THAT IS UNABLE TO PERFORM WORK.
TO REPLACE VARIABLE FREQUENCY DRIVE ON MAIN CHILLED WATER PUMP AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN.
REPAIR OF GARBAGE DISPOSAL IN CAFETERIA AT THE MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
TO REPLACE 80 GAUGES, COMPLETE THE 5 YEAR OBSTRUCTION TEST, AND REPLACE A CHILLED WATER PUMP MOTOR AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN.
THE EMERGENCY POWER TRACE & CIRCUIT MAPPING WILL BE PERFORMED AT THE DIANA E. MURPHY U.S. COURTHOUSE AT 300 S. 4TH STREET, SUITE 1012, MINNEAPOLIS, MN 55415.
REPAIR PIPE LEAK FOR HEAT EXCHANGERS 1 AND 2 AT THE MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
REPLACE PLATES FOR CHILLED WATER HEAT EXCHANGER AT THE MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
MODIFICATION TO EXERCISE 3-MONTH EXTENSION OF CONSOLIDATED FACILITIES MANAGEMENT SERVICES AT 4 LOCATIONS IN MINNESOTA.
TO REPAIR THE TUNNEL STEAM COIL LEAK AT AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN.
INSTALL PIPE SUPPORTS ON THE WASTE LINE IN THE PARKING GARAGE AT THE MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
INCREASE FUNDING AND EXTEND THE PERIOD OF PERFORMANCE, REPLACE HEAT PUMP, CONSOLIDATED FACILITIES MANAGEMENT SERVICES, DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
MODIFICATION TO ADD FUNDS FOR ADDITIONAL OVERTIME SERVICES TO EXPEDITE THE REPAIR OF THE CHILLED WATER AIR SEPARATOR AT THE MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
INSTALL ELECTRIC TANKLESS DOMESTIC WATER HEATER, CONSOLIDATED FACILITIES MANAGEMENT SERVICES, SOCIAL SECURITY ADMINISTRATION BUILDING, AUSTIN, MN
PARKING RAMP CLEANOUT REPLACEMENT AND LOBBY FLOOR DRAIN PIPING AND VALVE REPAIR AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN.
TO INSTALL RELIEF FAN CONTROLLERS AT THE W.E. BURGER FEDERAL BUILDING & U.S. COURTHOUSE, ST PAUL, MN.
HEAT EXCHANGER HEAD REPLACEMENT, CONSOLIDATED FACILITIES MANAGEMENT SERVICES, DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
TO REPLACE 3 SEWER EJECTOR PUMPS AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN.
TO PERFORM FY25 SNOW REMOVAL SERVICES AT THE SOCIAL SECURITY ADMINISTRATION, AUSTIN, MN.
PRIMARY HOUSING INSPECTIONS (CONUS)
REPLACEMENT OF FIRE EXIT DOOR WITH NEW LEFT-HAND SWINGING EMERGENCY FIRE-RATED EXIT DOOR - FIRE DOOR REPLACEMENT - BURGER FEDERAL BUILDING - SAINT PAUL, MINNESOTA
TRAVEL FUNDING
CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REPAIR LEAK IN SHOP HOT WATER LINE AT THE DIANA E. MURPHY U.S. COURTHOUSE IN MINNEAPOLIS, MN.
CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO PROVIDE SNOW AND ICE REMOVAL SERVICES INCLUDING SNOW HAULING AT THE DEVITT U.S. COURTHOUSE AND FEDERAL BUILDING IN FERGUS FALLS, MN.
MODIFICATION TO EXERCISE A 3 MONTH EXTENSION FOR CONSOLIDATED FACILITIES MANAGAGEMENT SERVICES AT FOUR LOCATIONS IN MINNESOTA.
CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO RELOCATE STEAM TRAP, PROGRAM ELEVATOR RELAY MODULE, INSTALL MIXING VALVES, REPAIR FIRE/LIFE SAFETY DEFICINCIES, & REPLACE FAILED BEARINGS AT THE MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN.
THE REPAIR AND REPLACEMENT OF THE BOILER GASKET AT THE EDWARD J. DEVITT US COURTHOUSE AND FEDERAL BUILDING IN FERGUS FALLS, MINNESOTA.
PAINT PROBATION SUITE, RM 303, 304, 305, 305A, AND 305B, WITH 2 COATS OF PAINT. SYSTEMS FURNITURE TO BE MOVED BY TENANT, IF NOT MOVED, PAINT AROUND. ANY OTHER FURNISHINGS AGAINST WALL TO BE MOVED BY PAINTER AND RETURNED UPON COMPLETION.
CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT & MATERIALS TO RUN CABLES FROM 2ND FLOOR DATA CLOSET TO 3RD FLOOR DATA CLOSET AND TERMINATE CABLES ON NEW WALL MOUNTED PATCH PANELS AT THE MURPHY U.S. COURTHOUSE AND FEDERAL BUILDING IN MINNEAPOLIS, MN.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE REMAINING FUNDS FOR CONTRACT CLOSEOUT. MODIFICATION 47PF0024F0225, MOD PA0001 HEREBY DECREASES THE TOTAL OBLIGATED AMOUNT FROM $8,147.20 TO $5,601.20.
47PF0024F0534, MOD PS0001 - RE-ROUTE ELECTRICAL CONDUIT, MOTHERING ROOM BUILD OUT PROJECT, DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REPLACE CONTROLLERS FOR AIR HANDLING UNIT 3-1, 3-2, & 8-1 AT THE BURGER FEDERAL BUILDING AND U.S. COURTHOUSE IN ST. PAUL, MN.
CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO INSTALL DEDICATED CIRCUIT WITH MOUNTED RECEPTACLE IN CLOSET AND, CONVERT TEN STAIRWELL DOOR LOCKS AT THE DIANA E. MURPHY U.S. COURTHOUSE IN MINNEAPOLIS, MN.
CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REPLACE STEAM COILS AT THE DIANA E. MURPHY U.S. COURTHOUSE IN MINNEAPOLIS, MN.
CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REMOVE EXISTING GLASS DOOR AND REINSTALL EXISTING PANIC AND FLOOR CLOSER ON NEW DOOR AT THE MURPHY U.S. COURTHOUSE IN MINNEAPOLIS, MN.
CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO PERFORM LEGIONELLA, LEAD & COPPER WATER TESTING AND, REPAIR FIRE PUMP AT THE BURGER FEDERAL BUILDING AND U.S. COURTHOUSE IN ST. PAUL, MN.
CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REMOVE AND DISPOSE OF DAMAGED CARPET IN PEDWAY TUNNEL AT THE DIANA E. MURPHY U.S. COURTHOUSE IN MINNEAPOLIS, MN.
Business Details
- UEI
- HG45BDPFM2A8
- CAGE Code
- 8NYJ2
- Address
- 1119 12TH ST NW
WASHINGTON, DC 200054632 - Congressional District
- DC-98
- Phone
- 7037426789
Parent Company
JLL-RER SOLUTIONS, LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov