CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY FOR THE DESIGN/BUILD OF BLDG 28 CHEMICAL SHOWER SKID REPLACEMENT/UPGRADE IN ACCORDANCE WITH THE STATEMENT OF WORK. (SEE THE SCHEDULE)
ORF PROJECT NUMBER: C115331 CONSTRUCTION; THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO REMODEL AND REPLACE THE BLDG. 25 AUTOCLAVE. (SEE THE SCHEDULE)
ORF PROJECT NUMBER: C115331 CONSTRUCTION; THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO REMODEL AND REPLACE THE BLDG. 25 AUTOCLAVE. (SEE THE SCHEDULE)
ORF PROJECT NUMBER: C115330 CONSTRUCTION, THE CONTRACTOR SHALL REMODEL, PROVIDE AND INSTALL NEW FURNITURE IN VARIOUS ROOMS IN THE "QUAD" AT THE NIH/RML CAMPUS. (SEE THE SCHEDULE)
ORF PROJECT NO.: C115301 CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE ALL REQUIRED ITEMS TO RENOVATE THE BLDG. 28 ATRIUM AREA. (SEE THE SCHEDULE)
ORF PROJECT NUMBER: C115330 CONSTRUCTION, THE CONTRACTOR SHALL REMODEL, PROVIDE AND INSTALL NEW FURNITURE IN VARIOUS ROOMS IN THE "QUAD" AT THE NIH/RML CAMPUS. (SEE THE SCHEDULE)
CONSTRUCTION; THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY FOR THE DESIGN/BUILD CONSTRUCTION TO REPLACE THE CAGEWASH AUTOCLAVE IN BLDG 25 AT THE NIH/RML CAMPUS, HAMILTON, MT. (SEE THE SCHEDULE)
THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO PROVIDE THE CONSTRUCTION SERVICES REQUIRED FOR THE RENOVATIONS OF THE CANOPY ON THE BLDG. 23 AT THE NIH/RML CAMPUS. ALL WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE CONSTRUCTION SPECIFICATIONS
ORF PROJECT NUMBER: C115335 CONSTRUCTION DESIGN/BUILD; THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO PERFORM THE CONSTRUCTION OF THE NIH/RML SITE REROUTE OF THE SANITARY SEWER LINE, INSTALL A LIFT STATION AND RELOCATE THE NATURAL GAS LINE IN
ORF PROJECT NUMBER: C115332 CONSTRUCTION; THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO RENOVATE/CONSTRUCT THE NORTH BOUNDARY FENCE. (SEE THE SCHEDULE)
CONSTRUCTION; THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO DEMO, THEN FURNISH AND INSTALL VCT FLOORING IN BLDG. 28. (SEE THE SCHEDULE)
ORF PROJECT NUMBER: C112902 CONSTRUCTION; THE CONTRACTOR SHALL PROVIDE ALL ITEMS TO PROVIDE AND INSTALL REPLACEMENT CHILLED WATER PUMPS & VFD'S IN BLDG. A AT THE NIH/RML CAMPUS. (SEE THE SCHEDULE)
ORF PROJECT NUMBER: C115333 CONSTRUCTION; THE CONTRACTOR SHALL PROVIDE ALL ITEMS REQUIRED TO PERFORM THE BLDG. 25 & B (RCMC) CENTRALIZED WATER SOFTENER SYSTEM. (SEE THE SCHEDULE)
ORF PROJECT NUMBER: C115334 CONSTRUCTION; THE CONTRACTOR SHALL PROVIDE ALL ITEMS REQUIRED TO ACCOMPLISH THE BLDG. 31 REDUNDANT CHILLER & TEMPORARY UTILITIES AT THE NIH/RML CAMPUS. (SEE THE SCHEDULE)
ORF PROJECT NUMBER: C115331 CONSTRUCTION; THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO REMODEL AND REPLACE THE BLDG. 25 AUTOCLAVE. (SEE THE SCHEDULE)
ORF PROJECT NUMBER: C115308 CONSTRUCTION, THE CONTRACTOR SHALL REMODEL AND INSTALL NEW GLASSWARE WASHER IN BLDG. A AT THE NIH/RML CAMPUS. (SEE THE SCHEDULE)
ORF PROJECT NUMBER: C115330 CONSTRUCTION, THE CONTRACTOR SHALL REMODEL, PROVIDE AND INSTALL NEW FURNITURE IN VARIOUS ROOMS IN THE "QUAD" AT THE NIH/RML CAMPUS. (SEE THE SCHEDULE)
ORF PROJECT NO.: C115301 CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE ALL REQUIRED ITEMS TO RENOVATE THE BLDG. 28 ATRIUM AREA. (SEE THE SCHEDULE)
CONSTRUCTION; THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO PROVIDE SERVICES AS DIRECTED BY THE CONTRACTING OFFICER IN SUPPORT OF THE NIH/RML RCMC PROJECT.
CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE ALL LABOR AND ITEMS NECESSARY TO PROVIDE & INSTALL A SECOND FLAGPOLE AT THE NIH/RML CAMPUS. (SEE THE SCHEDULE)
ORF PROJECT NUMBER: C112945 CONSTRUCTION; BOILER PLANT IMPROVEMENTS. THE CONTRACTOR SHALL PROVIDE ALL LABOR AND ITEMS NECESSARY TO PROVIDE, INSTALL, TEST, AND COMMISSION THE FOLLOWING: 1. A CONTINUOUS BLOWDOWN SYSTEM TO EACH BOILER IN BLDG. 26. 2
ORF PROJECT NUMBER: C115256 CONSTRUCTION; DESIGN/BUILD CONSTRUCTION FOR THE DESIGN OF LOCKER ROOM IN BLDG. 28 ON THE NIH/RML CAMPUS. ALL WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE STATEMENT OF WORK. (SEE THE SCHEDULE)
CONSTRUCTION; DESIGN/BUILD CONSTRUCTION FOR THE ADDED LN2 PIPING TO 3 FREEZERS IN BLDG. 28, ROOM 1B150. (SEE THE SCHEDULE)
CONSTRUCTION; THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO DESIGN/BUILD THE EXPANSION OF THE SIDEWALKS AT THE NIH/RML CAMPUS. (SEE THE SCHEDULE)
CONSTRUCTION; DESIGN BUILD CONSTRUCTION FOR THE ANALYSIS & DESIGN OPTIONS TO PREVENT EROSION AND DETERIORATION OF THE NORTHWEST AREA OF THE NIH/RML CAMPUS. (SEE THE SCHEDULE)
CONSTRUCTION; THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO PROVIDE SERVICES AS DIRECTED BY THE CONTRACTING OFFICER IN SUPPORT OF THE NIH/RML RCMC PROJECT.
Business Details
- UEI
- D8A6W681LYK1
- CAGE Code
- 49E51
- Address
- 5800 HIGHWAY 93 S
MISSOULA, MT 598049289 - Congressional District
- MT-01
- Phone
- 4065429150
Parent Company
JACKSON CONTRACTOR GROUP INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov