HOLLADAY ENGINEERING COMPANY
PAYETTE, IDAHO 836612520
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541330 | $7.44M | 114 |
Contract Awards
50 awards found
PPS NWZ ARCHITECTURE AND ENGINEERING (AE) IDIQ
GUIS 317374 - DS22-AE DESIGN CONTRACT PD
TITLE II SERVICES - REHABILITATE PW DUMP AND POTABLE WATER FILL STATIONS, LAKE MEAD NATIONAL RECREATION AREA, PMIS #229079 / 229080 / 229081
FOLLOW ON DESIGN BI LH BOARDWALK
TITLE III CONSTRUCTION MANAGEMENT SERVICES, CEDAR GROVE WASTEWATER TREATMENT PLANT PRIMARY, KINGS CANYON NATIONAL PARK MODIFICATION P00002 IS TO DE-OBLIGATE THE REMAINING FUNDS AND CLOSE OUT THE TASK ORDER. THE MODIFICATION IS NEEDED DUE TO THE CO
TITLE I TOPOGRAPHIC SURVEY AND MAPPING SERVICES, REHABILITATE HEADQUARTERS WATER DISTRIBUTION SYSTEM, OLYMPIC NATIONAL PARK, WASHINGTON
PERFORM A&E FINAL DESIGN CUGA WRCG
TITLE I AE SERVICES CONDITION ASSESSMENTS FOR FIRE & ELECTRICAL SYSTEMS AT HEADQUARTERS AND MAINTENANCE WAREHOUSE
MOD P00001 - BOUVEE MEADOWS ADDITIONAL WORK PD/SD/DD/CD & SUPPLEMENTAL SERVICES FOR THE REHABILITATE BARNES POINT WASTEWATER TREATMENT SYSTEMS PROJECT AT OLYMPIC NATIONAL PARK, WASHINGTON, OLYM 285331
CAHA - DESIGN HVAC FOR BUXTON DKQ, PKQ, AND BOOKSTORE
TITLE III CONSTRUCTION MANAGEMENT SERVICES - REHABILITATE LONGMIRE WASTEWATER COLLECTION SYSTEM BY REPLACING THE LIFT STATION - PMIS 249788 - MOUNT RAINIER NATIONAL PARK
TITLE II DESIGN AND FINAL CONSTRUCTION DOCUMENTS SERVICES, REPLACE WASTEWATER SYSTEMS AT HAGMAIER RANCH, POINT REYES NATIONAL SEASHORE, CALIFORNIA
TITLE III CONSTRUCTION MANAGEMENT SERVICES, CEDAR GROVE WASTEWATER TREATMENT PLANT PRIMARY, KINGS CANYON NATIONAL PARK
MODIFICATION TO ADD ADDITIONAL FUNDS. ENGINEERING SERVICES TO DESIGN THE MAIN FALLS EXISTING DOUBLE VAULT TOILET COMFORT STATION AT LITTLE RIVER CANYON FALLS PARKING LOT.
GUCO - A&E DESIGN_BARRIER GATE SYSTEM
GUIS 317374 - DS22-AE DESIGN CONTRACT PD
AE DESIGN SERVICES FOR PREDESIGN, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENTS, AND SUPPLEMENTAL SERVICES FOR THE REHABILITATE BARNES POINT WASTEWATER TREATMENT SYSTEMS PROJECT AT OLYMPIC NATIONAL PARK, WASHINGTON, OLYM 285331
PERFORM A&E DESIGN CUGA WR CAMPGROUND
ENGINEERING SERVICES TO DESIGN THE MAIN FALLS EXISTING DOUBLE VAULT TOILET COMFORT STATION AT LITTLE RIVER CANYON FALLS PARKING LOT.
TITLE I SCOPING SERVICES, REHABILITATE HEADQUARTERS WATER DISTRIBUTION SYSTEM, OLYMPIC NATIONAL PARK, WASHINGTON
SEKI 317446 TITLE III AE FOR WWTP AT BUCKEYE AND ASH MOUNTAIN
PERFORM A&E DESIGN CUGA WR CAMPGROUND
SEKI 317446 TITLE III AE FOR WWTP AT BUCKEYE AND ASH MOUNTAIN
A/E PRE-DESIGN WORMLEY POND DAM RPR
AE TITLE II - DESIGN DEVELOPMENT AND FINAL CONSTRUCTION DOCUMENTS SERVICES TO REPLACE ALAN BIBLE VISITOR'S CENTER ROOF - LAKE MEAD NATIONAL RECREATION AREA, NV
TITLE III INSTALL WATER DISTRIBUTION PIPELINE AND UV WATER SYSTEM
AE SERVICES TO REPLACE FAILING WASTEWATER SYSTEMS AT HAGMAIER RANCH
AE TITLE SCOPING SERVICES TO INSTALL ENERGY RECOVERY VENTILATION SYSTEM FOR RADON MITIGATION AT FOSSIL STORAGE BUILDING - HAGERMAN FOSSIL BEDS NATIONAL MONUMENT - HAGERMAN, IDAHO
REHAB PW DUMP AND POTABLE WATER FILL STATIONS
EVALUATE HVAC BUXTON DKQ, PKQ, BOOKSTORE
AE TITLE I SERVICES FOR ERP RE-POWER AND REPAIR LCM-6 LANDING CRAFT (HERON) HEAVY TRANSPORT VESSEL, GRAND COULEE WA, PMIS # 184438 - LAKE ROOSEVELT NATIONAL RECREATION AREA
CMP WASTEWATER A&E. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE $5215.18 FOR SERVICES THAT WILL BE COMPLETED UNDER TITLE II NOT I.
AE TITLE II DESIGN DEVELOPMENT AND FINAL CONSTRUCTION DOCUMENT SERVICES FOR UPGRADE COTTONWOOD COVE PICNIC AREA RESTROOM PMIS #315674 AT LAKE MEAD NATIONAL RECREATION AREA - SEARCHLIGHT, NEVADA
FINAL DESIGN TITLE II SERVICES
DESIGN OF HEATING, VENTILATION, AND AIR CONDITIONING SYSTEMS FOR FORT SUMTER, FORT SUMTER LIBERTY SQUARE, AND FORT MOULTRIE VISITOR CENTERS.
DESIGN-REPAIR DRAINAGE AT THE VC
GUIS-317374-DS22-AE SCOPING TRIP
ENHANCE PICNIC AREA DESIGN
CARL - TITLE III FOR SERVICES FOR WATER SYSTEM
CUGA - A&E VISITOR CENTER MECHANICAL SYSTEM
A&E DESIGN FOR AUTOMATIC GATE KIMO HQ
CMP WASTEWATER A&E
DESIGN-REPAIR DRAINAGE AT THE VC
DESIGN MUSEUM QUALITY HVAC FOR JIMMY CARTER NATIONAL HISTORICAL PARK. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE $30,168.80 FOR A NEW TOTAL AWARDED AMOUNT OF $87,063.63.
REHABILITATE ASH MOUNTAIN AND BUCKEYE WASTE WATER TREATMENT PLANTS, TITLE II AE DESIGN SERVICES
TITLE III CONSTRUCTION INSPECTION SERVICES, REHABILITATE MUIR WOODS WATER PHASE 2, MUIR WOODS NATIONAL MONUMENT, MILL VALLEY CALIFORNIA BILATERAL MODIFICATION P00003 IS TO DE-SCOPE THE SOW TO REMOVE SERVICES THAT WERE NO LONGER REQUIRED AND DE-OBL
DESIGN MUSEUM QUALITY HVAC FOR JIMMY CARTER NATIONAL HISTORICAL PARK. THE PURPOSE OF THIS MODIFICATION IS TO ADD $7,329.99 FOR TOTAL AWARDED AMOUNT OF $117,232.43.
DESIGN MUSEUM QUALITY HVAC FOR JIMMY CARTER NATIONAL HISTORICAL PARK
AE TITLE I SCOPING / GEOTECHNICAL / TOPOGRAPHIC SURVEY AND MAPPING SERVICES FOR UPGRADE COTTONWOOD COVE PICNIC AREA RESTROOM, LAKE MEAD NATIONAL RECREATION AREA, NEVADA - PMIS 315674
BOAF A&E ABIEL SMITH SCHOOL ELEVATOR REPLACE
Business Details
- UEI
- HMCMGJLPE5M3
- CAGE Code
- 3DBX5
- Address
- 32 N MAIN ST
PAYETTE, ID 836612520 - Congressional District
- ID-01
- Phone
- 2086423304
Parent Company
HOLLADAY ENGINEERING COMPANY
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov