HGL CONSTRUCTION INC
OKLAHOMA CITY, OKLAHOMA 731306252
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $52.71M | 97 |
| 236210 | $2.41M | 7 |
Contract Awards
50 awards found
DEMO 2,269 SM B1020. DEMO FOUNDATIONS, SLABS, STRUCTURES, ROOF, WINDOWS, DOORS, EQUIPMENT, FIXTURES, INTERIOR FINISHES/WALLS/SLAB, EXTERIOR FINISHES/CONCRETE/PAVING, LANDSCAPING, AND CAP UTILITIES. DEMO CONCRETE BETWEEN B1020/B1024, GRADE/INSTALL SOD
THE PURPOSE OF THIS PROJECT IS TO CONSOLIDATE MULTIPLE FUNCTIONS OF THE 19TH OPERATIONS SUPPORT SQUADRON (OSS) INTO THE EXISTING BUILDING 216, WITH ADDITIONAL SQUARE FOOTAGE ADDED TO BUILDING TO ACCOMMODATE NEW SPACE REQUIREMENTS FOR THE FACILITY.
THE PURPOSE OF THIS PROJECT IS TO CONSOLIDATE MULTIPLE FUNCTIONS OF THE 19TH OPERATIONS SUPPORT SQUADRON (OSS) INTO THE EXISTING BUILDING 216, WITH ADDITIONAL SQUARE FOOTAGE ADDED TO BUILDING TO ACCOMMODATE NEW SPACE REQUIREMENTS FOR THE FACILITY.
DEMO 2,269 SM B1020. DEMO FOUNDATIONS, SLABS, STRUCTURES, ROOF, WINDOWS, DOORS, EQUIPMENT, FIXTURES, INTERIOR FINISHES/WALLS/SLAB, EXTERIOR FINISHES/CONCRETE/PAVING, LANDSCAPING, AND CAP UTILITIES. DEMO CONCRETE BETWEEN B1020/B1024, GRADE/INSTALL SOD
DEMO B1077. RMVE FOUNDATIONS, SLABS, ROOF, WINDOWS, DOORS, EQUIP., FIXTURES, EXT/INT FINISHES, INT WALLS/SLAB, EXT CONCRETE/PAVING, LANDSCAPING, ETC. AND GRADE TO DRAIN, CAP UTILITIES AS REQUIRED. RMVE CONCRETE BETWEEN B1079/B1077.
THE PURPOSE OF THIS PROJECT IS TO REPLACE AIR HANDLERS, FAN COIL UNITS, PUMPS AND PIPING IN MECHANICAL ROOM. ALSO REPLACE THE CHILLED AND HOT WATER LINES THAT RUN OUTSIDE TO THE BOILER AND CHILLERS. THE CHILLED WATER LINE IS LEAKING UNDERGROUND. THE
RENOVATION OF THE LEAN-TO ON THE EAST SIDE OF HANGAR 5 LOCATED AT JBSA-RANDOLPH, TX. THIS AREA IS APPROXIMATELY 3,500 SQUARE FEET. RENOVATIONS WILL INCLUDE CHANGING THE CENTRAL AREA INTO A CENTRALIZED TOOLKIT (CTK) ROOM ALONG WITH ADDING A LUNCH AREA
THE PURPOSE OF THIS PROJECT IS TO CONSOLIDATE MULTIPLE FUNCTIONS OF THE 19TH OPERATIONS SUPPORT SQUADRON (OSS) INTO THE EXISTING BUILDING 216, WITH ADDITIONAL SQUARE FOOTAGE ADDED TO BUILDING TO ACCOMMODATE NEW SPACE REQUIREMENTS FOR THE FACILITY.
THE PURPOSE OF THIS PROJECT IS TO CONSOLIDATE MULTIPLE FUNCTIONS OF THE 19TH OPERATIONS SUPPORT SQUADRON (OSS) INTO THE EXISTING BUILDING 216, WITH ADDITIONAL SQUARE FOOTAGE ADDED TO BUILDING TO ACCOMMODATE NEW SPACE REQUIREMENTS FOR THE FACILITY.
ALL OTHER WORK
THE PURPOSE OF THIS PROJECT IS TO PROVIDE A NEW 1247 SQUARE FOOT ADDITION TO BUILDING 466 LOCATED APPROXIMATELY AT THE MIDDLE OF THE EXISTING SOUTH EXTERIOR WALL, PROVIDING ADEQUATE SPACE FOR REPAIR AND MAINTENANCE OF COMPOSITE PROPELLER BLADES.
THE PURPOSE OF THIS PROJECT IS TO CONSOLIDATE MULTIPLE FUNCTIONS OF THE 19TH OPERATIONS SUPPORT SQUADRON (OSS) INTO THE EXISTING BUILDING 216, WITH ADDITIONAL SQUARE FOOTAGE ADDED TO BUILDING TO ACCOMMODATE NEW SPACE REQUIREMENTS FOR THE FACILITY.
THIS PROJECT IS TO DEMOLISH EXISTING WARFIT FIELD GRASS AND REINSTALL SUBGRADE AND ARTIFICIAL TURF; DEMOLISH AND REPLACE THE RUNNING TRACK, IMPROVE THE STORMWATER DRAINAGE SYSTEM; AND DEMOLISH THE WALKING TRACK AND INSTALL A FULL DEPTH REPAIR.
THE PROJECT ENCOMPASSES THE DESIGN AND CONSTRUCTION SERVICES FOR THE RENOVATION OF HANGAR 12 AT JBSA-RANDOLPH, INCLUDING ASSOCIATED INCIDENTAL WORK. THE APPROXIMATELY 30,000 SF FACILITY WILL UNDERGO A TWO-PHASE RENOVATION.
THIS IS A DESIGN-BUILD REQUIREMENT FOR THE RENOVATION OF EX-SERVER FARM ROOMS 217 AND 219 INTO ADMINISTRATIVE OFFICE SPACE. WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH SOW/SPECIFICATIONS DATED, 18 SEP 2024.
REPLACE COOLING TOWER WWYK190199 B821
THE PROJECT ENCOMPASSES THE DESIGN AND CONSTRUCTION SERVICES FOR THE RENOVATION OF HANGAR 12 AT JBSA-RANDOLPH, INCLUDING ASSOCIATED INCIDENTAL WORK. THE APPROXIMATELY 30,000 SF FACILITY WILL UNDERGO A TWO-PHASE RENOVATION.
THIS PROJECT IS TO REPAIR BY DESIGN AND DEMO/INSTALL OF NEW ARCHITECTURAL SHINGLE ROOF AND REPAIR OF THE FIRE ALARM SYSTEM AT B528.
REMOVE EXISTING OFFICE TO DESIGN AND EXPAND THE DISPATCH AREA TO ACCOMMODATE NEW FURNITURE AND EQUIPMENT LAYOUT TO IMPROVE PERSONNEL CIRCULATION AND WORKFLOW.
DEMO 23,120 SF OF B210 AND REPAIR 4,411 SF OF EXISTING STRUCTURE TO STORE FARP AND ABFDS EQUIPMENT AND MEET MISSION REQUIREMENTS. REPLACE HVAC AND INSTALL WALL INFILL TO CREATE STORAGE SPACE FROM FORMER OFFICE/TRAINING SPACE.
LIGHTING IN B266 HAS EXCEEDED ITS LIFECYCLE AND NEEDS REPAIR BY REPLACEMENT. REPAIR BY REPLACEMENT OF THE LIGHTING WILL ENABLE THE USERS OF THE FACILITY TO FULLY UTILIZE ALL OF THE ROOMS IN THE BUILDING AND TO BE ABLE TO SEE ADEQUATELY.
THIS PROJECT IS TO REPAIR BY DESIGN AND DEMO/INSTALL OF NEW ARCHITECTURAL SHINGLE ROOF AND REPAIR OF THE FIRE ALARM SYSTEM AT B528.
REPAIR CTK ROOM, SQUAD OPS B234
THIS PROJECT IS TO DEMOLISH EXISTING WARFIT FIELD GRASS AND REINSTALL SUBGRADE AND ARTIFICIAL TURF; DEMOLISH AND REPLACE THE RUNNING TRACK, IMPROVE THE STORMWATER DRAINAGE SYSTEM; AND DEMOLISH THE WALKING TRACK AND INSTALL A FULL DEPTH REPAIR.
THE PURPOSE OF THIS PROJECT IS TO PROVIDE A NEW 1247 SQUARE FOOT ADDITION TO BUILDING 466 LOCATED APPROXIMATELY AT THE MIDDLE OF THE EXISTING SOUTH EXTERIOR WALL, PROVIDING ADEQUATE SPACE FOR REPAIR AND MAINTENANCE OF COMPOSITE PROPELLER BLADES.
THE PURPOSE OF THIS PROJECT IS TO DESIGN, RENOVATE, AND CONSTRUCT ADDITIONS TO BUILDING 854 (APPROX. 37120 SQUARE FEET) TO PROVIDE A RENOVATED THREE STORY RESIDENTIAL HOUSING FACILITY TERMED AN AIRMEN DORMITORY.
THE PURPOSE OF THIS PROJECT IS TO CONSOLIDATE MULTIPLE FUNCTIONS OF THE 19TH OPERATIONS SUPPORT SQUADRON (OSS) INTO THE EXISTING BUILDING 216, WITH ADDITIONAL SQUARE FOOTAGE ADDED TO BUILDING TO ACCOMMODATE NEW SPACE REQUIREMENTS FOR THE FACILITY.
ALL OTHER WORK
REPAIR WARFIT SPORTS FIELD ARTIFICIAL TURF REPAIR ATHLETIC FIELD TRACK REPAIR WALKING TRACK - MODIFICATION TO ADD FUNDING FOR TURF LOGO, DEMOLISH EXERCISE PAD, DEMOLISH STORM DRAIN INLETS, AND FIX FIELD AND TRACK ELEVATION.
REPAIR PROPELLER MAINTENANCE BUILDING 466 - MODIFICATION FOR ADDING FUNDS, LIFTING SUSPENSION OF WORK AND ADDING ADDITIONAL DAYS TO COMPLETE THE WORK.
REPAIR (SUSTAIN) BASE PAVEMENTS - ARNOLD DRIVE
REPAIR SUSTAIN AIRMEN DORM B854 - MODIFICATION IS TO DEMOLISH COMPLETE EXISTING WOOD TRUSS ROOF SYSTEM AND INSTALL A NEW LIGHT GAUGE METAL TRUSS SYSTEM, METAL DECKING, WOOD DECKING ALL OTHER ITEMS REQUIRED TO INSTALL LIGHT GAUGE METAL TRUSS SYSTEM.
REPAIR SUSTAIN HEATING VENTILATION AIR CONDITIONING B370 - MODIFICATION IS TO ADD ADDITIONAL FUNDS TO CORRECT A DESIGN DEFICIENCY.
DEMOLISH/CONSOLIDATE 19 OPERATIONS SUPPORT SQUADRON FUNCTION B-216 - MODIFICATION IS TO PROVIDE ADDITIONAL FUNDING FOR CUMMINS GENERATOR STANDARDIZATION. ADDITIONAL FUNDING NEEDED DUE TO GOVERNMENT DELAYS.
WWYK190046 - RENOVATE RESTROOMS AT 2AH65A, B3001
REPAIR WARFIT SPORTS FIELD ARTIFICIAL TURF REPAIR ATHLETIC FIELD TRACK AND REPAIR WALKING TRACK
ACTIVE VEHICLE BARRIER REPLACEMENT - MODIFICATION TO DE-OBLIGATE ALL REMAINING FUNDS.
DEMOLISH / CONSOLIDATE 19 OPERATIONS SUPPORT SQUADRON FUNCTION IN BUILDING 216 - MODIFICATION IS FOR GOVERNMENT CAUSED DELAYS, CUMMINS GENERATOR STANDARDIZATION, FIBER OPTIC CABLE, AND TO BRING AIRFIELD PAVING INTO CODE.
SUSTAIN/REPAIR PAVEMENTS BASEWIDE
REPAIR SUSTAIN AIRMEN DORM B854 - MODIFICATION IT TO ADD FUNDING FOR ADDITIONAL ASBESTOS ABATEMENT AND EXTEND COMPLETION DATE TO COMPLETE.
REPAIR AND SUSTAIN BUILDING 370 - MODIFICATION IS FOR THE REPLACEMENT OF THE UNFORESEEN ADDITIONAL GALVANIZED PIPING.
VANDENBERG VISITOR CONTROL CENTER B-1508 - MODIFICATION IS FOR ASBESTOS ABATEMENT, UNDERGROUND ELECTRICAL TIE-INS AND NATURAL GAS LINE RELOCATION.
ALL OTHER WORK
REPAIR (STORM) WEAPONS SQUADRON B-288 AND REPAIR HEATING VENTILATION AIR CONDITIONING (HVAC) B-288 - MOD TO ADD FUNDS FOR DAMAGED BUILDING CONTROL PANELS FOR THE HVAC.
REPAIR BACKUP GENERATOR MULTI B350, B370& B1250 - MODIFICATION TO ADD FUNDS TO RELOCATE GENERATOR PAD DUE TO FUEL TRUCKS NOT ABLE TO GET TO THE GENERATOR WAS ORIGINALLY PLACE. PAD IS BEING MOVED OVER 100 FT FROM ORIGINAL LOCATION.
TO DESIGN, RENOVATE, AND CONSTRUCT ADDITIONS TO BUILDING 854 (APPROXIMATELY 37120 SQUARE FEET) TO PROVIDE A RENOVATED THREE STORY RESIDENTIAL HOUSING FACILITY TERMED AN AIRMEN DORMITORY.
REPAIR (STORM) WEAPONS SQUADRON B-288 AND REPAIR HEATING VENTILATION AIR CONDITIONING (HVAC) B-288 - MOD TO ADD FUNDS FOR BROKEN SHOWER PANS, ASBESTOS ABATEMENT AND REPAIRS IN MECHANICAL ROOM 107
REPAIR AND MAINTENANCE PROPELLER MAINTENANCE B466
DEMOLISH BUILDINGS - B710, B850
MAINTAIN FIRE SUPPRESSION WATER STORAGE TANKS (TANKS 223, 293, AND 252) MODIFICATION TO ADD FUNDS TO ABATE LEAD-BASED PAINT AND TO TEST AN EXTERNAL CATHODIC PROTECTION SYSTEM.
Business Details
- UEI
- WC7YV2FLQEK5
- CAGE Code
- 1R0Q5
- Address
- 2000 S DOUGLAS BLVD STE A
OKLAHOMA CITY, OK 731306252 - Congressional District
- OK-04
- Phone
- 4057377588
Parent Company
HGL CONSTRUCTION INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov