GRANITE CONSTRUCTION COMPANY
WATSONVILLE, CALIFORNIA 950765123
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 237990 | $372.09M | 64 |
| 237310 | $218.57M | 91 |
| 236220 | $169.15M | 10 |
| 324121 | $1.18M | 13 |
| 238990 | $154K | 1 |
| 212321 | $23K | 1 |
Contract Awards
50 awards found
ADD THE INSTALLATION OF A 36 INCH REINFORCED CONCRETE DRAINAGE PIPE AT THE EASTERN PORTION OF THE RGV 2 SEGMENT B-PROGRESSO PORT OF ENTRY.
OR FLAP UMATILL 582(1) MILL CREEK ROAD - THIS MODIFICATION OBLIGATION CM FOR ANCHORED MESH COSTS
PROJECT DESCRIPTION: THIS PROJECT IS FOR THE REACH 6 LEVEE AND FLOODWALL CONSTRUCTION ALONG THE CORRALITOS CREEK, A TRIBUTARY OF THE PAJARO RIVER LEVEE SYSTEM IN THE CITY OF WATSONVILLE, COUNTY OF SANTA CRUZ.
DELETE FIBER OPTIC VAULT PER GOVERNMENT RESPONSE TO RFI 190
CD 45-1 INSTALL 2 PUSH-IN PIEZOMETERS DATA FROM THE INSTALLATION OF THESE PUSH-IN PIEZOMETERS WILL SUPPORT AND INFLUENCE A COURSE OF ACTION DIRECTLY RELATED TO THE RESOLUTION OF THE NORTH ABUTMENT WINGWALL SETTLEMENT/REPLACEMENT CHANGE CD 40-1.
EXERCISE OPTIONAL LINE ITEMS ADDING 1.4 MILES OF VERTICAL BORDER BARRIER IN THE RIO GRANDE VALLEY, TX.
AK NPS DENA 10(49) POLYCHROME AREA IMPROVEMENTS - ADMINISTRATIVE CONTRACT MODIFICATION INCREASES THE OBLIGATION FOR FUNDING NEEDS.
CD 34 - DESIGN CHANGES TO SOUTH ABUTMENT APPROACH
CHANGE: CD038 TITLE: VEQ - CLIN 35 INTERIM QTY IN PROGRESS QUANTITIES FOR CLIN 35 CHANGE: CD043 TITLE: NOC 12 - PG&E SPLICE BOX REA REA FOR REDESIGN AND RE-FABRICATION REQUIRED TO COMPLY WITH DIRECTED CHANGES PER THE GOV'T RESPONSE TO RFI 179.
VARIATION IN ESTIMATED QUANTITIES - CLIN 33 SOIL TYPE 1
3 LEVEE REACH2/VINYARD & HARRISON SUMPS
ADJUSTMENT TO FINAL ESTIMATED QUANTITIES TO CLIN 79 AND AN REA FOR WORK ON EXISTING STILLING BASIN
DESIGN AND CONSTRUCTION OF NEW BARRIER WITHIN IN THE RIO GRANDE VALLEY, TX. THIS MOD EXERCISE OPTIONAL LINE ITEMS FOR DRAINAGE AND EROSION (COMPETED AT TIME OF AWARD).
DESIGN BID BUILD CONSTRUCTION FOR RAIL YARD IMPROVEMENTS AT FORT BLISS, TEXAS EXERCISE OPTION 2 FOR GENERATOR
PHASE 2 TOPO SURVEY REA REA FOR MULTIPLE PRE-CONSTRUCTION SURVEY VISITS RFI 158 - LIFT GATE ALIGNMENT CONFLICT IN SELECT DRAWINGS LEBLS ACCESS RD REPAIR REA REA FOR THE REPAIR AND MAINTENANCE OF THE LEBLS CONNECTION ROAD FOR DWR EMERGENCY ACCESS.
GRANITE RIO GRANDE VALLEY 2, 4, AND 10 BARRIER GAPS DESIGN BUILD CONSTRUCTION PROJECT MOD EXERCISING OPTIONAL LINE ITEMS 1007 THRU 1009 AND 1067 THROUGH 1069 ON THE PRICING SCHEDULE
MINIMUM GUARANTEE - GRANITE CONSTRUCTION
CD 33 - REA FOR GATE STEM/GUIDE DESIGN REVISIONS CD 35 - REA FOR GROUNDBREAKING CEREMONY STANDDOWN
IDAHO, MONTANA, AND SURROUNDING AREAS INDEFINITE DELIVERY/ INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD TASK ORDER CONTRACT (MATOC)
EXERCISES OPTIONAL LINE-ITEMS AWARDING THE DESIGN & CONSTRUCTION OF RIO GRANDE VALLEY-2 SEGMENT C-1 FOR NEW VERTICAL BARRIER, GAPS AND DRAINAGE AND EROSION CONTROL.
CD 17 - REA FOR 86 DAYS OF PILE DRIVING EQUIPMENT STANDBY COSTS. CD 25 - REA FOR THE REMOVAL AND DISPOSAL COSTS OF UNKNOWN SUB-SURFACE CONCRETE OBSTRUCTIONS.
REA FOR DIFFERING SITE CONDITIONS BASED ON EARTHWORK AND AGGREGATE BASE DISCREPANCIES OF THE CENTRAL EMBANKMENT RAMP.
MODIFICATION FOR THE FISH LADDER TOP OF WALL THICKNESS ENGINEERING CHANGE AND SWAINSON'S HAWK BIOLOGICAL MONITORING REA
AK NPS DENA 10(49) POLYCHROME AREA IMPROVEMENTS - ADMINISTRATIVE FUNDS SWITCH PROVIDES COMPENSATION TO THE CONTRACTOR FOR THE ICE MITIGATION AT THE WEST CUT.
BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION
A10 | R17 - VEHICLE BRIDGE PILE HORIZONTAL TOLERANCE CHANGE
FY 23 HRC FEDERAL FUNDING
3 LEVEE REACH2/VINYARD & HARRISON SUMPS
SAC WEIR CONST - NON - FEDERAL FUNDING A09/R14 - REA FOR RAILROAD EMBANKMENT & OLD RIVER RD EXCAVATION
ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS
FY 23 HRC FEDERAL FUNDING
CD 08 - DOWEL BAR MATERIAL SPECIFICATIONS CD 14 - N. ABUTMENT WING WALL REDESIGN
FUND CONSTRUCTION PROJECT OR FLAP UMATILLA 582(1), MILL CREEK ROAD. WORK INCLUDES CHIP SEAL, CRUSHED AGGREGATE, GRADING, REPAIR OF SOLDIER PILE WALLS WITH ANCHORED WIRE MESH, SIGNING, TRAFFIC CONTROL, AND EROSION CONTROL.
CD013 REA FOR VEH BRIDGE PIER REBAR CHANGES
SAC WEIR CONST - NON - FEDERAL FUNDING FISH PASSAGE PILE TIP ELEVATION CHANGE CD0010
MOD R9/A6 BAFFLE CHANGES CREDIT, REA FOR UNKNOWN UTILITIES, REA FOR WEIR ABUTMENT FOUNDATION PREP
3 LEVEE REACH2/VINYARD & HARRISON SUMPS
GROUT WATERLINE - REACHES 2, 4
AK NPS DENA 10(49) POLYCHROME AREA IMPROVEMENTS - FYE OBLIGATION CM
BPA FOR ASPHALT SUPPLIES FOR JBER (2024)
DESIGN BID BUILD CONSTRUCTION FOR RAIL YARD IMPROVEMENTS AT FORT BLISS, TEXAS
SAC WEIR CONST - NON - FEDERAL FUNDING CD012-1 PILE DRIVING SPEC REVISION R00007/P00003
R2/A2/CD2 TWO ADDITIONAL CARDANIC RING ASSEMBLIES
SAC WEIR CONST - NON - FEDERAL FUNDING
R1/A1/CD1 ADDITIONAL PQT TESTING (HARDNESS & CORROSION)
ADDITIONAL WORK
MOD TO CORRECT PREVIOUS MOD
SAC WEIR CONST - NON - FEDERAL FUNDING
SAC WEIR CONST - NON - FEDERAL FUNDING R00004/CD004 CLIMATE CONTROLLED STORAGE
BPA FOR ASPHALT SUPPLIES FOR JBER (2024)
Business Details
- UEI
- VAYJNMM2KBE5
- CAGE Code
- 1X910
- Address
- 585 W BEACH ST
WATSONVILLE, CA 950765123 - Congressional District
- CA-18
- Phone
- 8317684020
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov