| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $612.04M | 323 |
| 237990 | $119.28M | 5 |
| 237120 | $7.32M | 18 |
| 562910 | $2.28M | 21 |
| 541614 | $0 | 4 |
| 541712 | $-187.8 | 1 |
| 236116 | $-296,615.42 | 5 |
Contract Awards
50 awards found
REA-ADDT'L FLOORING ABATEMENT @ LEVEL 6
PRIMARY FACILITY CONSTRUCTION MCA1 MODIFICATION FOR GC069 DELETE X-10 LOCKS, ADDED COST $12,334.00, ADDED TIME 3 NON-COMPENSABLE CALENDAR DAYS
CONSTRUCTION OF ECMS AT MULTIPLE LOCATIONS IN KSA.
EXPANSION OF THE TACTICAL TRAINING VILLAGE OF "DANIS CITY" ON GLYNCO SITE
CONSTRUCTION OF ECMS AT MULTIPLE LOCATIONS IN KSA.
THE WORK TO BE PERFORMED WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW) DATED 21 JULY 2022, WORLDWIDE ENGINEERING AND CONSTRUCTION (WEC) CONSTRUCT MULTI-BAY HANGAR, DOCK 11 AT BEALE AFB, CA PROJECT NO: BAEY212011.
UNILATERAL MODIFICATION: ACCEPTANCE OF PROPOSAL AMOUNT OF $686,579.83 FOR CMR 34: KTR FACILITATING $600,000.00 PAYMENT TO LADWP ON BEHALF OF THE CG.
THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR ALL MATERIALS, LABOR, AND EQUIPMENT RELATED TO MEDIUM VOLTAGE DUCTBANK RELOCATION AND T-2078 PANEL DISCREPANCY
THE WORK TO BE PERFORMED WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW) DATED 21 JULY 2022, WORLDWIDE ENGINEERING AND CONSTRUCTION (WEC) CONSTRUCT MULTI-BAY HANGAR, DOCK 11 AT BEALE AFB, CA PROJECT NO: BAEY212011.
CONSOLIDATION MODIFICATION PCS 7,8,9,11,12 INTO P00004
GENERAL CONSTRUCTION PROJECTS
REPAIR FIRE SYSTEM DEFICIENCIES, MULTIPLE TENANT HANGARS AT HOLLOMAN AIR FORCE BASE (AFB), NEW MEXICO (NM)
THE WORK TO BE PERFORMED WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW) DATED 21 JULY 2022, WORLDWIDE ENGINEERING AND CONSTRUCTION (WEC) CONSTRUCT MULTI-BAY HANGAR, DOCK 11 AT BEALE AFB, CA PROJECT NO: BAEY212011.
PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR GC060 DESCOPE IRRIGATION, A CREDIT OF $55,780.00. UNILATERAL.
THE WORK TO BE PERFORMED WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW) DATED 21 JULY 2022, WORLDWIDE ENGINEERING AND CONSTRUCTION (WEC) CONSTRUCT MULTI-BAY HANGAR, DOCK 11 AT BEALE AFB, CA PROJECT NO: BAEY212011.
THIS MODIFICATION IS ISSUED IS TO INCORPORATE CMR 008: CUSTOMER CHANGES REVISED.
CPFF-MULT SITES IN ROK, MINOR REPAIR/CONSTRUCTION
THE PURPOSE OF THIS UNILATERAL MODIFICATION IS TO INCORPORATE THE PROPOSAL 01, CMR 10 FOR THE AMOUNT OF $15,435,186.00 AND EXTEND POP TO 9.9.2027
ACCEPTANCE OF GILBANE PROPOSAL AMOUNT FOR CMR 33/REA 10 $10,759.42.
SETTLEMENT CLAIM
P407 LITTORAL INNOVATION AND PROTOTYPING CONSTRUCTION PROJEC
DESIGN BUILD AND VARIOUS REPAIRS TO PETROLEUM OIL LUBRICANT FACILITIES AT JOE FOSS FIELD AIR NATIONAL GUARD, SOUTH DAKOTA.
P407 LITTORAL INNOVATION AND PROTOTYPING CONSTRUCTION PROJEC
P407 LITTORAL INNOVATION AND PROTOTYPING CONSTRUCTION PROJEC
F-15 FLEET MODERNIZATION PROGRAM ROYAL SAUDI AIR FORCE STANDOFF WEAPONS EARTH COVERED MAGAZINE STORAGE AT PRINCE SULTAN AIR BASE, AL KHARJ AND KING KHALID AIR BASE, KHAMIS MUSHAYT KINDOM OF SAUDI ARABIA
EXPANSION OF THE TACTICAL TRAINING VILLAGE OF "DANIS CITY" ON GLYNCO SITE
THE PURPOSE OF THIS UNILATERAL MODIFICATION IS TO INCORPORATE THE PROPOSAL 01, CMR 10 FOR THE AMOUNT OF $15,435,186.00 AND EXTEND POP TO 9.9.2027
ACCEPT GILBANE CMR 15 12.20.24 PROPOSAL. POP EXTENDED TO 11.17.25. CLIN 0001 GILBANE SUBSTATION, $4,116,329.05, CLIN 0002, LADWP TRANSFORMER INSTALL 148 CALENDAR DAYS (SUBJECT TO LADWP PERFORMANCE) AT $303.85 PER DAY, $44,969.80. TOTAL $4,161,298.85
C.I# SO231 UOC FOOH REAS-CY10 A10Y109 (C4I080) USFK OPERATIONS CENTER (BUILDING PHASE/US) & YRP PNA08Y101 (C4I030-1), PHASE III FACILITY AT USAG HUMPHREYS, KOREA
THE WORK TO BE PERFORMED WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW) DATED 21 JULY 2022, WORLDWIDE ENGINEERING AND CONSTRUCTION (WEC) CONSTRUCT MULTI-BAY HANGAR, DOCK 11 AT BEALE AFB, CA PROJECT NO: BAEY212011.
THIS MODIFICATION IS ISSUED IS TO INCORPORATE CMR 007: TEMPORARY FACILITIES.
THE WORK TO BE PERFORMED WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW) DATED 21 JULY 2022, WORLDWIDE ENGINEERING AND CONSTRUCTION (WEC) CONSTRUCT MULTI-BAY HANGAR, DOCK 11 AT BEALE AFB, CA PROJECT NO: BAEY212011.
CY10 A10Y109 (C4I080) USFK OPERATIONS CENTER (BUILDING PHASE/US) & YRP PNA08Y101 (C4I030-1), PHASE III FACILITY AT USAG HUMPHREYS, KOREA. SO163 PH3 - REA EXTENDED GROUNDS MAINTENANCE SO220 PH3 - FP LEAK DETECTION, REPAIR, TEST-2 SO228 PH3 - DESCOPE REMOVAL OF TEMPORARY POWER SO229 PH3 - MISC TURNOVER INSP CORRECTIONS-2
REPAIR AIRFIELD APRONS, TAXIWAY K, AND TAXIWAY M ON KING SALMON AIR STATION.
$331,771.32 REA 11, MOD DEV, PREP, IMPLEMENT, ADV. ELECT, CLARK NEXSEN DESIGN, BOND, .66%, G&A 6.96%, PROFIT 10.28%, BOND PREM ADJUST 1.25%.
CMR 30: ACCEPTANCE OF CONTRACTOR PROPOSAL DATED 10SEP24 IN THE AMOUNT OF $455,926.39.
THE CONTRACTOR SHALL PERFORM CONSTRUCTION EFFORTS IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE BASIC WEC CONTRACT AND THE SOW FOR THE STC AND CONTROLLED ASSETS STORAGE PROJECT AT KING ABDULAZIZ AIR BASE, KINGDOM OF SAUDI ARABIA.
P407 LITTORAL INNOVATION AND PROTOTYPING CONSTRUCTION PROJEC
P407 LITTORAL INNOVATION AND PROTOTYPING CONSTRUCTION PROJEC
F-15 FLEET MODERNIZATION PROGRAM ROYAL SAUDI AIR FORCE STANDOFF WEAPONS EARTH COVERED MAGAZINE STORAGE AT PRINCE SULTAN AIR BASE, AL KHARJ AND KING KHALID AIR BASE, KHAMIS MUSHAYT KINDOM OF SAUDI ARABIA
MINIMUM GUARANTEE
THE PURPOSE OF THIS MODIFICATION IS FOR A CREDIT OF ($563,058.66) DUE TO A DEDUCTION FOR THE TELECOM TRENCHING BETWEEN BUILDING N27 AND BUILDING 614.
THE PURPOSE OF THIS MODIFICATION IS TO AWARD AN ADDITIONAL $464,918.24 TO PROVIDE TO UPDATE THE DESIGN TO MEET ELECTRICAL SHORE TIE CSTO FOR INCOMING POWER, PER RFI 047; AND MEET KEA REQUIREMENTS FOR INCOMING POWER.
CONPH3, REA-PERIOD II UPS FOOH&DIRECT COST CONTRACT FOR CY10 A10Y109 (C4I080) USFK OPERATIONS CENTER (BUILDING PHASE/US) & YRP PNA08Y101 (C4I030-1), PHASE III FACILITY AT USAG HUMPHREYS, KOREA. SO217 PH3, REA-PERIOD II UPS FOOH&DIRECT COST
THE PURPOSE OF THIS MODIFICATION IS TO AWARD AN ADDITIONAL $742,769.68 TO PROVIDE NEW STEEL FRAME AND STEEL BAR GRATE DECK FLOAT TO REPLACE THE EXISTING FLOAT IN LIEU OF REFURBISHMENT IN SCOPE.
P407 LITTORAL INNOVATION AND PROTOTYPING CONSTRUCTION PROJEC
REPAIR TANK I-5 AT DEFENSE FUEL SUPPORT POINT AT IORIZAKI, SASEBO, JAPAN
REPAIR TANKS AT DEFENSE FUEL SUPPORT POINT AT YOKOSE AND MARINE CORP AIR STATION IN IWAKUNI, JAPAN
THIS MODIFICATION IS ISSUED IS TO INCORPORATE CMR 004: PIER ELECTRICAL REDESIGN (CONSTRUCTION).
DESIGN-BUILD CONSTRUCTION SERVICES TO REPAIR HANGAR AT HOLLOMAN AIR FORCE BASE, NEW MEXICO
Business Details
- UEI
- WHB7C12ADS35
- CAGE Code
- 012A2
- Address
- 1655 GRANT ST 12TH FL
SUITE 200
CONCORD, CA 945202445 - Congressional District
- CA-10
- Phone
- 8655350153
Parent Company
GILBANE, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov