FLATIRON-DRAGADOS-SUKUT JOINT VENTURE
BENICIA, CALIFORNIA 945101216
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 237990 | $43.96M | 81 |
Contract Awards
50 awards found
CONTRACT NO. W91238-17-C-0025 ISABELLA LAKE DAM SAFETY MODIFICATION MODIFICATION NO. R00242 CI257- AC PAVING DELAY COSTS. TOTAL CONTRACT PRICE IS INCREASED BY $248,988.00. THE CONTRACT TIME IS NOT AFFECTED, AND THE CONTRACT PRICE IS INCREASED.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MOD PROJECT (DSMP), PHASE II DAMS AND SPILLWAY.REF NO.R00243/CI258 ADDT'L COSTS TO INSTALL PROMATRIX BONDED FIBER MATRIX BLANKET. TOTAL CONTRACT PRICE IS INCREASED BY $224,145.00.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00241/CI251-2 FINALIZE CLINS LESS THAN 85%. TOTAL CONTRACT PRICE IS INCREASED BY $973,176.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00240/CI254-2 FINALIZE CLINS GREATER THAN 115%. TOTAL CONTRACT PRICE IS INCREASED BY $ 13,968 .00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY. R00212/CI229 SPOT SHOTCRETE SS24. TOTAL CONTRACT PRICE IS INCR BY $100,000.00. THE CONTRACT COMPL DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00238/CI250 SA3 AGG PLANT REMAINING MATERIAL. TOTAL CONTRACT PRICE IS INCREASED BY $68,751.65. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00237/CI255 INCREASED QTY MASS CONCRETE CYCLE 1-12. TOTAL CONTRACT PRICE IS INCREASED BY $270,612.61. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DSMP, PHASE II DAMS & SPILLWAY AT ISABELLA DAM. R00234/CI253 2ND MOD TO CLOSEOUT COMPLETED CLINS. TOTAL CONTRACT PRICE IS INCREASED BY $6,779,483.24. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DSMP, PHASE II DAMS & SPILLWAY AT ISABELLA DAM. R00232/CI249 1ST MOD TO CLOSEOUT COMPLETED CLINS. TOTAL CONTRACT PRICE IS DECREASED BY $6,265,978.29. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DSMP PHASE II DAMS & SPILLWAY AT ISABELLA DAM. R00236/CI251-1 FINALIZE CLINS LESS THAN 85%. TOTAL CONTRACT PRICE IS DECREASED BY $5,274,834.66. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. AT ISABELLA DAM. REFERENCE NO. R00235/CI254-1 FINALIZE CLINS GREATER THAN 115%. TOTAL CONTRACT PRICE IS INCREASED BY $201,010.48.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00233/CI252AUX DAM SUMP PUMP #2 REPLACEMENT. TOTAL CONTRACT PRICE IS INCREASED BY $11,524.40. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00231/CI248 EPOXY INJECTION OF CONCRETE CRACKS. TOTAL CONTRACT PRICE IS INCREASED BY $86,507.50. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00194/CI182-2 & DEFINITIZE LW LFT WALL SAT 8+51.15-10+00. TOTAL CONTRACT PRICE IS INCREASED BY -$121,740.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00229/CI148-4 ROCK CRUSHING PLANT, STAND BY COST. TOTAL CONTRACT PRICE IS INCREASED BY $726,687.36. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00230/CI198-4 CONCRETE BATCH PLANT, STANDBY COST. TOTAL CONTRACT PRICE IS INCREASED BY $836,801.69. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00220/CI239 QTY INCR AUX DAM CLINS 1003AN & 1003AS. TOTAL CONTRACT PRICE IS DECREASED BY $336,403.48. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00228/CI245 WATMAN BACKERBOARD. TOTAL CONTRACT PRICE IS INCREASED BY $8,562.33. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00227/CI244 ADDITIONAL ADAS RADIO SYSTEM CHANGES. TOTAL CONTRACT PRICE IS INCREASED BY $28,722.29 THE NEW CONTRACT COMPLETION DATE IS AUGUST 31, 2023.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00226/CI246 SPUR DIKE MATERIAL-EQUIPMENT HAUL HWY155. TOTAL CONTRACT PRICE IS INCREASED BY $70,544.41. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00223/CI241 EXTENDED FOOH WINDOW 2 & WINDOW 4. TOTAL CONTRACT PRICE IS INCREASED BY $11,550,000.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00222/CI214 BORROW AREA FINAL GRADING AND DRAINAGE. TOTAL CONTRACT PRICE IS INCREASED BY $530,025.28. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00225/CI240, HWY 155 DOWNSTREAM 18 RCP PROTECTION. TOTAL CONTRACT PRICE IS INCREASED BY $72,500.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00224/CI243 CLAIM 8 - EQUIPMENT. TOTAL CONTRACT PRICE IS INCREASED BY $600,803.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00221/CI234 MISCELLANEOUS ADDITIONAL APRON CHANGES. TOTAL CONTRACT PRICE IS INCREASED BY $675,556.23. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00218/CI236 EXTERIOR SIGNAGE AT MAIN DAM CONTROL TOWER. TOTAL CONTRACT PRICE IS INCREASED BY $32,095.68. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00217/CI235 SHOTCRETE SLOPE AROUND AUX DAM PIEZOS. TOTAL CONTRACT PRICE IS INCREASED BY $160,000.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00215/CI237 RELOCATION OF ACCELEROGRAPH AD-A-11. TOTAL CONTRACT PRICE IS INCREASED BY $85,158.36. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MOD PROJECT, PHASE II DAMS AND SPILLWAY. REFERENCE NO. R00216/CI242 EXERCISE OPT 8 SHEET/STRIP DRAINS. TOTAL CONTRACT PRICE IS INCREASED BY $10,500.00. THE CONTRACT COMPL DATE SHALL REMAIN UNCHANGED BY THIS MOD.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MOD PROJECT, PHASE II DAMS AND SPLWY AT ISABELLA DAM. REF NO. R00210/CI232 SPOT SHOTCRETE, SS LGW. TOTAL CONTRACT PRICE IS INCR BY $62,518.00. THE CONTRACT COMPL DATE SHALL REMAIN UNCHANGED BY THIS MOD.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00213/CI213 PEDESTRIAN STAIRS & WALKWAY SS LEFT WALL. TOTAL CONTRACT PRICE IS INCREASED BY $295,000.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00214/CI231 BL 19 POTABLE WATER HYDRANT RELOCATION. TOTAL CONTRACT PRICE IS INCREASED BY $56,709.55. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. AT ISABELLA DAM. REFERENCE NO. R00211/CI238 DEFINITIZE R00198 FOOH DAILY RATE. TOTAL CONTRACT PRICE IS INCREASED BY $1,810,139.74. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00208/CI227 GRADE CHANGES AT CRASH GATE. TOTAL CONTRACT PRICE IS INCREASED BY $30,402.40. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00209/CI233 AC UNIT FOR AUX DAM SUMP CABINET. TOTAL CONTRACT PRICE IS INCREASED BY $26,909.88. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00207/CI223 MAIN DAM GUARD RAIL SLEEVES. TOTAL CONTRACT PRICE IS INCREASED BY $20,134.23. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00206/CI224 WING WALL DESIGN MAIN DAM LEFT ABUT. TOTAL CONTRACT PRICE IS INCREASED BY $54,953.21. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00205/CI230 ADDITIONAL ADAS SYSTEM CHANGES. TOTAL CONTRACT PRICE IS INCREASED BY $30,50604. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
FDS, $119,367.71CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00204/CI221 E.S. ACCESS ROAD BMPS SWPPP. TOTAL CONTRACT PRICE IS INCREASED BY $119,367.71. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00201/CI176 ADDITIONAL ROCK EXCAVATION SERVICE SPILLWAY. TOTAL CONTRACT PRICE IS INCREASED BY $194,000.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00200/CI218 SPOT SHOTCRETE AREA 23. TOTAL CONTRACT PRICE IS INCREASED BY $112,000.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT, PHASE II DAMS & SPILLWAY. REF NO. R00202/CI155-2 DEFINIT. OF SITE POWER AND COMM. TOTAL CONTRACT PRICE IS INCR BY $1,107,115.38. THE CONTRACT COMPL DATE SHALL REMAIN UNCHANGED BY THIS MOD.
R00203 CI212 4B STOCKPILE SORTING
CONTRACT FOR ISABELLA LAKE DAM SAFETY MOD PROJECT, PHASE II DAMS & SPLWY. REF NO. R00198/CI226 CYCLES 1-3 TBD9 FOOH. TOTAL CONTRACT PRICE IS INCR. BY $4,019,860.00. THE CONTRACT COMPL DATE SHALL BE EXTENDED BY 29 CALENDAR DAYS BY REASON OF THIS MOD.
R00199/CI208, CI217, CI219 MDCT CHANGES
CONTRACT FOR ISABELLA LAKE DAM SAFETY MOD PROJECT (DSMP), PHASE II DAMS & SPLWY. REF NO. R00197/CI198-2 DEF APRON TRTMNT CYCLES 1-3. TOTAL CONTRACT PRICE IS INCR. BY $3,337,032.00. THE CONTRACT COMPL DATE SHALL REMAIN UNCHANGED BY THIS MOD.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00196/CI204 DELAMINATION OF SHOTCRETE FILLET HWY155. TOTAL CONTRACT PRICE IS INCREASED BY $17,744.63. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
R00195 CI197 ACCELEROGRAPHS CREST OF MAIN & AUX DAM
CONTRACT FOR ISABELLA LAKE DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY AT ISABELLA DAM. REFERENCE NO. R00192/CI192 MISC. CHANGES TO S.S. LEFT WALL CONCRETE. TOTAL CONTRACT PRICE IS INCREASED BY $105,791.08. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR ISABELLA LAKE DAM SAFETY MOD PROJECT (DSMP), PHASE II DAMS & SPLWY. REF NO. R00193/CI177-4 DEF APRON TRTMT CYCLES 4-12 OF LW. TOTAL CONTRACT PRICE IS INCREASED BY $2,596,000.00. THE CONTRACT COMPL DATE SHALL REMAIN UNCHANGED BY THIS MOD.
Business Details
- UEI
- MRL6KMXKCTD5
- CAGE Code
- 7W5X4
- Address
- 2100 GOODYEAR RD
BENICIA, CA 945101216 - Congressional District
- CA-08
- Phone
- 7077426000
Parent Company
FLATIRON-DRAGADOS-SUKUT JOINT VENTURE
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov