| NAICS Code | Obligations | Awards |
|---|---|---|
| 238220 | $6.52M | 64 |
| 561210 | $3.31M | 53 |
| 238990 | $0 | 1 |
Contract Awards
50 awards found
ORDER ISSUED TO PAY FOR COMPUTER ROOM A/C CONDENSER REPAIRS COMPLETED ON MARCH 31, 2025. INVOICE #PB1304 DATED APRIL 4, 2025 IS ATTACHED.
PROJECT FOR NEW QUAD OUTLETS IN THE US PROBATION SPACE AT 450 GOLDEN GATE AVE, SAN FRANCISCO, CA.
INVESTIGATE ACTIVE WATER PIPE LEAK TO PREVENT LIFE SAFETY ISSUES AT 450 GOLDEN GATE AVE SF, CA 94102
REPLACE AND INSTALL THE AC UNIT IN THE SERVER ROOM OF THE DEA SPACE AT 450 GOLDEN GATE AVE, SAN FRANCSICO, CA.
US PASSPORT SENSAPHONE INSTALL AT 450 GOLDEN GATE AVE SF, CA 94102
THE CONTRACTOR WILL PROVIDE THE LABOR, MATERIALS AND EQUIPMENT TO REPLACE THE DEFECTIVE BASE STATION RADIO ANTENNA LOCATED ON THE ROOF OF PHILLIP BURTON FEDERAL BUILDING AND COURTHOUSE (450 GOLDEN GATE AVE SF, CA 94102).
SERVICES FOR THE O&M VENDOR TO COORDINATE WITH PG&E FOR THE REPLACEMENT OF RELAYS IN THE SUBSTATION AT 450 GOLDEN GATE AVE, SAN FRANCISCO, CA.
EMERGENCY REPLACEMENT OF CRACKED CONDENSER LINES AT 450 GOLDEN GATE AVE SF, CA 94102
EMERGENCY REPAIRS TO THE SPRINKLER LINE OF THE FBI SPACE AT 450 GOLDEN GATE AVE, SAN FRANCISCO, CA.
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE COSTS TO PERFORM THE ANNUAL PM REQUIREMENTS IN THE CONTRACT EXTENSION FOR OPERATIONS AND MAINTENANCE RELATED SERVICES AT THE PHILLIP BURTON FEDERAL BUILDING.
OPERATION AND MAINTENANCE SERVICES AT THE PHILLIP BURTON AND U.S. COURTHOUSE, SAN FRANCISCO, CA. THIS MODIFICATION IS ISSUED TO EXERCISE THE OPTION TO EXTEND SERVICES PER FAR 52.217-8 FOR THE PERFORMANCE PERIOD APRIL 1, 2025 THRU JUNE 30, 2025.
PROVIDE 1 NEW DUPLEX 20 AMP POWER OUTLET ON WEST WALL OF CAGED PARKING SPACE #190 AT 450 GOLDEN GATE AV SF, CA 94102. RUN CONDUIT FROM NEW OUTLET TO EXISTING LIVE J BOX UNDERSIDE OF CONCRETE SLAB CEILING IN ADJACENT CAGED PARKING SPACE #191.
CHILLED WATER PUMP #1 AND #2 VFDS REPLACEMENT AT 450 GOLDEN GATE AVE SF, CA 94102
THIS MODIFICATION IS ISSUED TO CHANGE THE CONTRACT ASSIGNED "EK" FOR RECURRING SERVICES TO "EP" PDN FOR DISCRETIONARY ONE-TIME PROJECT TO PERFORM THE ANNUAL ELECTRICAL PREVENTATIVE MAINTENANCE TESTING AT 450 GOLDEN GATE AVENUE, SAN FRANCISCO, CA.
THE SUBJECT CONTRACT SHOULD BE ASSIGNED AN "EP" PDN FOR DISCRETIONARY ONE-TIME PROJECT, NOT AN "EK" FOR RECURRING SERVICES.
ANNUAL ELECTRICAL PREVENTATIVE MAINTENANCE FOR PHILLIP BURTON FB SAN FRANCISCO CA
THE CONTRACTOR WILL PROVIDE THE LABOR, MATERIALS AND EQUIPMENT TO REPLACE DEFECTIVE DOOR FLOOR CLOSURES AND PIVOTS ON THE TURK STREET AFTER HOURS DOORS AT 450 GOLDEN GATE AV SF, CA 94102.
MODIFICATION: THE CONTRACT IS HEREBY MODIFIED AS FOLLOWS: 1. OPTION TO EXTEND SERVICES FOR THREE MONTHS FROM IS 1/1/2025 - 3/31/2025. PHILLIP BURTON FEDERAL BUILDING AND COURTHOUSE (CA0154ZZ) LOCATED AT 450 GOLDEN GATE AVE., SAN FRANCISCO, CA 94102
REPAIR THE CEILING WHERE ACCESS WAS NEEDED TO REPAIR A LEAKING SPRINKLER PIPE AT 450 GOLDEN GATE AVE, SAN FRANCISCO, CA.
MAGNETIC DOOR LOCKS ON EMERGENCY EXIT DOORS POLK AND LARKIN STREETS AT 450 GOLDEN GATE AVE SF, CA 94102
THE BUILDING HAS INSTALLED EQUIPMENT ON THE HVAC REQUIRING UPGRADE TO THE BAS TO INCLUDE NEW SETPOINTS AND SCREENS FOR 3 NEW BOILER BURNERS AND VFD FOR CHILLER AT 450 GOLDEN GATE AVE, SF, CA 94102.
TO PROVIDE THE LABOR, MATERIALS, AND EQUIPMENT TO REPLACE 6 FEET CRACKED 4-INCH CAST IRON ROOF DRAINPIPE ABOVE THE 19TH FLOOR CEILING. AFFECTED AREA: 19TH FLOOR WESTSIDE CORRIDOR OUTSIDE CR #7 ABOVE THE CEILING AT 450 GOLDEN GATE AVE SF, CA 94102.
THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE THE $27K EXCESS BALANCE FOR THE CLOSEOUT OF OPERATIONS AND MAINTENANCE RELATED SERVICES AT THE PHILLIP BURTON FEDERAL BUILDING AND COURTHOUSE, 450 GOLDEN GATE AVE, SAN FRANCISCO, CA 94102.
EMERGENCY REPAIRS TO USDC CHILLER #2 VFD CIRCULAR PUMP AT 450 GOLDEN GATE AVE SF, CA 94102
EMERGENCY WATER REMEDIATION 17TH FLOOR- 20TH FLOOR AT 450 GOLDEN GATE AVE SF, CA 94102
MONITORING THE CHILLERS FOR REQUESTED OVERTIME UTILITIES FOR APEC CONFERENCE AT 450 GOLDEN GATE AVE, SAN FRANCISCO, CA 94102-3661
REPLACE CPU BOARD ON THE FIRE CONTROL PANEL AT 450 GOLDEN GATE SF, CA 94102
CONTRACTOR TO PROVIDE THE LABOR, MATERIALS AND EQUIPMENT TO REPLACE 100 FEET OF CRACKED 4" CAST IRON PIPE OF THE CONDENSATE DRAIN LINE IN THE PENTHOUSE AT 450 GOLDEN GATE AVE SF, CA 94102. PER THE SOW.
GENERAL INTENT: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE WAGE ADJUSTMENT INCREASE FOR THE OPERATIONS AND MAINTENANCE RELATED SERVICES AT THE PHILLIP BURTON FEDERAL BUILDING AND COURTHOUSE LOCATED AT 450 GOLDEN GATE AVE., SAN FRANCISCO, CA.
O&M BRIDGE CONTRACT FOR PHILLIP BURTON FB SAN FRANCISCO CA
MODIFICATION: THE CONTRACT IS HEREBY MODIFIED AS FOLLOWS: OPTION TO EXTEND SERVICES FOR ONE MONTH FROM IS 6/1/2024 - 6/30/2024 FOR O&M MAINTENANCE SERVICES AT THE PHILLIP BURTON FB AND COURTHOUSE AT 450 GOLDEN GATE AVE., SAN FRANCISCO, CA 94102
ADDITIONAL LABOR TO MONITOR THE CHILL AIR SYSTEMS AT 450 GOLDEN GATE AVE, SAN FRANCISCO, CA.
TO PROVIDE THE LABOR, EQUIPMENT AND MATERIALS FOR ONE (1) DUPLEX ELECTRICAL RECEPTACLE OUTLET ON A DEDICATED CIRCUIT IN THE SQUAD ROOM ON THE FBI 13TH FLOOR AT 450 GOLDEN GATE AVE SF, CA 94102
THE CONTRACTOR WILL PROVIDE THE LABOR, MATERIALS AND EQUIPMENT TO PROVIDE ALTERATION TO THE HVAC IN JUDGES CHAMBERS TO ADDRESS THE ISSUE OF INSUFFICIENT AIR FLOW AT 450 GOLDEN GATE AVE SF, CA 94102
FBI CHILLED AIR LABOR REQUEST FOR 450 GOLDEN GATE AVE SF,CA 94102
REPAIRS NEEDED TO THE FCC PANEL FOR THE AFTER-HOURS DOOR AT 450 GOLDEN GATE AVE, SAN FRANCSICO, CA.
PERFORM 3 YEAR ELECTRICAL TESTING PER THE 2022 PM GUIDE AT THE PHILLIP BURTON FB & CRTHSE, SAN FRANCISCO CA
REMOVE AND REPLACE EXISTING BURNER UNITS ON BOILER 1, 2 & 3.
INSTALL PLUMBING INSULATION AT VARIOUS LOCATIONS AT 450 GOLDEN GATE AVE SF, CA 94102
REPAIRS TO RETURN AHU #20 EAST 4 DUE TO HVAC ISSUES AT 450 GOLDEN GATE AVE SF, CA 94102
WATER QUALITY TESTING FOR 450 GOLDEN GATE AVE SF, CA 94102
ANNUAL FIRE LIFE SAFETY PREVENTATIVE MAINTENANCE TEST AT 450 GOLDEN GATE AVE SF CA 94102 FOR 7 MONTHS 6-1 THROUGH 12-31-2024
REPAIRS ARE NEEDED FOR ONE OF THE CHILLERS LOCATED AT 450 GOLDEN GATE AVE, SAN FRANCISCO, CA.
PROJECT PERFORMED AS A SECONDARY PART OF AN ELECTRIC OVEN INSTALL TO BRING THE ELECTRICAL OUTLET UPGRADED TO BE COMPATIBLE WITH THE OVEN. THIS PROJECT IS LOCATED AT 450 GOLDEN GATE AVE, SAN FRANCISCO, CA.
REPLACE THE VFD FOR CHILLER #3 AT PHILLIP BURTON FEDERAL BUILDING, SAN FRANCISCO, CA 94102
CONTRACTOR WILL PROVIDE THE LABOR, MATERIALS AND EQUIPMENT TO REMOVE THE FLUORESCENT LIGHTING AND RETROFIT WITH LED LIGHTING IN THE LISTED MECHANICAL SPACES AT 450 GOLDEN GATE AVE, SF, CA. 94102
THE CONTRACTOR WILL PROVIDE THE LABOR, MATERIALS AND EQUIPMENT TO REDUCE THE VIBRATION SOUNDS FROM THE 5TH FLOOR EEOC SUITES AT 450 GOLDEN GATE AVE SAN FRANCISCO, CA 94102.
PROVIDE THE LABOR, MATERIALS, AND EQUIPMENT TO REPLACE WATER CHEMICAL TREATMENT CENTER SYSTEM FOR THE COOLING TOWERS. LOCATION IS PHILLIP BURTON FEDERAL BUILDING AT 450 GOLDEN GATE AVE SAN FRANCISCO, CA
PURPOSE IS TO SANDBLAST THE EXTERIOR EXPANSION JOINT TO MAKE IT NON-SLIP. THIS WILL TAKE PLACE AT THE PHILLIP BURTON FEDERAL BUILDING AT 450 GOLDEN GATE AVE, SAN FRANCISCO, CA.
EMERGENCY REQUIREMENT TO REPAIR THE DOMESTIC HOT WATER BOILER SOLENOID DUE TO THE VALVE LEAKING GAS AT 450 GOLDEN GATE AVE, SAN FRANCISCO, CA 94102.
Business Details
- UEI
- G9LAEZH4HH14
- CAGE Code
- 0XWX6
- Address
- 94-157 LEOLEO ST
WAIPAHU, HI 967972215 - Congressional District
- HI-01
- Phone
- 8083955707
Parent Company
DELLEW CORP
Data Source
This profile is based on federal contract award data from USAspending.gov.