CJW CONTRACTORS, INC.
DBA: CJW CONTRACTORS INC
MCLEAN, VIRGINIA 221023375
Contract Awards
50 awards found
POP EXT TO 12/31/25, AND ADDITIONAL FUNDING FOR CABINET WORK
MOD TO ADD TO THE SCOPE ASBESTOS AVOIDANCE AND O&M OVERTIME AND EXTEND THE PERIOD OF PERFORMANCE COMPLETION DATE FROM 10/7/2025 TO 10/30/2025.
MOD TO ADD WORK
REMOVE LIGHT POLE, NAVAL STATION NORFOLK, NORFOLK, VA
DEOBLIGATE EXCESS FUNDS OF $11,997.00 LEFT TO COMPLETE CLOSEOUT.
3 NEW CONDUITS INSTALLATION
MODIFICATION TO INCORPORATE CHANGES FOR PC00001, RELOCATE GOVERNMENT PROPERTY TO DESIGNATED AREA OUTSIDE CONSTRUCTION SITE AND DEMOLISH AND DISPOSE ADDITIONAL MATERIALS AT BLDG. CEP 126, NAVAL STATION NORFOLK, NORFOLK, VA.
BUILDING UPGRADES USSS 950 H ST. N.W. WASHINGTON D.C
BATHROOM REFRESH AT RRB
ADDITIONAL FIRE ALARM HEAD END REPAIRS RONALD REAGAN BUILDING, 1300 PENNSYLVANIA AVE. N.W. WASHINGTON D.C
B1500 RENOVATE B-WING
THIS IS A REQUEST FOR A PROPOSAL TO MODIFY THE CHILLER OVERHAUL PROJECT AT (DOT HQ).REPLACEMENT OF TWO DEFICIENT ACTUATORS IN CHILLER PW1. 47PM0123F0001, MOD PS0005
47PM0122F0021 PS0006 - MOD BA54 DC0094ZZ STEAM STATION REPLACEMENT - REPLACE NCE CONTROLLER HARDWARE/PROVIDE HARDWARE CAPABLE OF INTEGRATION WITH EXISTING JACE. POP EXTENDED 151 DAYS, FROM 9/16/2024 TO 2/14/2025. LOCATED AT NATIONAL COURTS COMPLEX.
BUILDING UPGRADES USSS ADDITIONAL WORK 810 VERMONT AVE. N.W. WASHINGTON D.C
MOD TO RESTORE & REPAIR SCREENING STATIONS
MOD TO ADD TO THE SCOPE OF WORK FINISH CHANGES IN THE BATHROOM, KITCHEN, PAINT, COVE BASE AND HARDWOOD FLOORS.
ONE WHITE FLINT NORTH BUILDING, 11TH & 13TH FLOOR RENOVATIONS, 11555 ROCKVILLE PIKE, ROCKVILLE, MD 20852 IS MODIFIED TO ADD EXIT SIGN, WHITE NOISE RELAY, MARKER BOARDS, DOOR LOCKS, ELECTRIC WHIP REPAIR WALLS RELOCATE THERMOSTATS AND SWITCHES.
MOD TO ADD TO THE SCOPE OF WORK HAZMAT ABATEMENT AND EMERGENCY SIGNALING CODE REQUIREMENT FOR 4 PASSENGER AND FREIGHT ELEVATORS AND JUDGE'S ELEVATOR PE5
MOD TO ADD HAZMAT ABATEMENT TO THE SCOPE OF WORK.
MOD TO ADD ADDITIONAL WORK TO THE SOW
X029 DB-NOSC ELEANOR ATFP UPGRADES. MODIFICATION TO INCORPORATE PC 01- REA - UNFORESEEN GROUNDWATER.
MOD TO ADD TO THE SCOPE OF WORK FOR UNFORESEEN CONDITIONS
ONE WHITE FLINT NORTH BUILDING, 11TH & 13TH FLOOR RENOVATIONS, 11555 ROCKVILLE PIKE, ROCKVILLE, MD 20852 IS MODIFIED TO ADD LCM, A05, AO6 LIGHTING, MONITORS, FLOOR PREP PER SCOPE OF WORK DATED 07/2024 AND CONTRACTORS PROPOSAL DATED 07/2024.
CJW - MINIMUM GUARANTEE
ADDITIONAL 440 LINEAR FEET OF RAILING FOR THE USGS CONCRETE BUILDING REPAIRS LOCATED AT THE POWELL BUILDING. ADDRESS IS 12201 SUNRISE VALLEY DR., RESTON, VA 20192
TO ADD ADDITIONAL WORK FOR WING E AND EXTEND POP TO SEPTEMBER 30, 2024.
MOD TO COVER ADDITIONAL DESIGN AND CONSTRUCTION COST FOR THE UNFORESEEN CONDITIONS AFTER THE ACOUSTICAL STUDY OF THE SPACE.
ONE WHITE FLINT NORTH BUILDING, 11TH & 13TH FLOOR RENOVATIONS, 11555 ROCKVILLE PIKE, ROCKVILLE, MD 20852 IS MODIFIED TO ADD MISCELLANEOUS CHANGES TO ELECTRICAL, SHEET METAL, LIGHT FIXTURES, VAVS AND FLEX DUCT PER SCOPE OF WORK DATED 04/04/2024.
MOD PS0004. THE CURRENT CONTRACT DELIVERY DATE OF SHALL BE EXTENDED TO COMPLETE THE CHILLER OVERHAUL PROJECT AT THE DEPARTMENT OF TRANSPORTATION (DOT HQ).
UNFORESEEN SITE CONDITIONS - REPLACING BROKEN VALVE, WATER LINE, ADD DAMPERS PER TAB REPORT DESIGN ERROR - MISCOORDINATION WITH CUSTOMER ON IDF RM REQUIREMENT, DUTY DAY (INTERVIEW) ROOMS, COPIER AND AV EQUIPMENT
USGS EXTERIOR CONCRETE REPAIRS LOCATED AT 12201 SUNRISE VALLEY DR. RESTON, VA 20192
MOD TO ADD TO WORK SCOPE ADDITIONAL REMOVAL OF ASBESTOS CONTAINING MATERIALS LOCATED ON THE FLOOR TILE, MASTIC, AND METAL DUCT BLACK MASTIC. ON VENTS.
ONE WHITE FLINT NORTH BUILDING, 11TH & 13TH FLOOR RENOVATIONS, 11555 ROCKVILLE PIKE, ROCKVILLE, MD 20852 IS MODIFIED PERFORM CHANGES TO DOOR SCHEDULES, CONDENSATE DRAINS, VAVS AND KITCHEN PANTRY, PER THE ATTACHED SCOPE OF WORK DATED 04/04/2024
X001 SB MACC SEED: CONSTRUCT P702 SUBMARINE LOGISTICS SUPPORT FAC
THIS MODIFICATION IS FOR THE ADDITION OF FIVE DOG LEG EXPANSION JOINTS AND TWELVE STEAM TRAPS TO BE INCLUDED IN THE DESIGN AND INSTALLATION OF THE STEAM LINE REPLACEMENT PROJECT TO RESOLVE THE SAFETY CONCERNS THAT WERE IN THE STRESS ANALYSIS STUDY.
MOD TO COVER THE DESIGN AND CONSTRUCTION COST FOR THE UNFORESEEN CONDITIONS AFTER THE ACOUSTICAL STUDY OF THE SPACE WITH A POP EXTENSION UP TO 10.31.2024.
THIS IS A REQUEST FOR A PROPOSAL TO MODIFY THE CHILLER OVERHAUL PROJECT AT (DOT HQ).THE WORK MUST ACHIEVE THE FOLLOWING COMPLETION OF THE OVERHAUL OF THE CHILLERS PW2 & PE2 AND TESTING OF CHILLERS OPERATION AND RECONNECTION TO BAS & POWER SOURCES.
GENERAL CONTRACTOR IS TO FURNISH AND INSTALL DUCT INSULATION ON THE MECHANICAL DUCT IN THE 531-536 SUITE THAT WAS REMOVED DURING ABATEMENT.
REPLACE BROKEN CIRCUIT BREAKER WITH NEW CIRCUIT BREAKER FOR THE 400AMP DATA CENTER REQUIREMENT.
REPLACE ALL EXISTING ANALOG SIGNALING LINE CONTROL EQUIPMENT AND FIELD INITIATING DEVICES WITH NEW DIGITAL SIGNALING LINE CONTROL EQUIPMENT AND DIGITAL ADDRESSABLE INITIATING DEVICES AT THE DOE GERMANTOWN HEADQUARTERS
THE MOD IS TO EXTEND THE TIME WITH ADDITIONAL COST DUE TO REVISED FINAL CONSTRUCTION DRAWINGS. RWA# 2059114
MOD AWARD TO COVER THE DESIGN AND CONSTRUCTION COST FOR THE UNFORESEEN CONDITIONS AFTER THE ACOUSTICAL STUDY OF THE SPACE.
TO BE CONSIDERED SUCCESSFUL, THE WORK MUST ACHIEVE THE FOLLOWING OBJECTIVES FOR THE 47PM0122F0021 PS0004 PROJECT: 1. COMPLETE THE WORK IN THE EXTENDED TIME ALLOTTED (150 DAYS). 2. MODIFY CONDENSATE VENT CONNECTION TO THE RELIEF PIPE HEADER.
THE PERIOD OF PERFORMANCE SHALL BE EXTENDED 60 CALENDAR DAYS TO COMPLETE THE WORK DETAILED IN THIS SCOPE OF WORK. THERE ARE NO ADDITIONAL COSTS FOR THIS EXTENSION BECAUSE IT ACCOUNTS FOR ORDERING LEAD TIMES.
MOD TO ORDER AN ADDITIONAL 250 SQUARE YARDS (OR THE MINIMUM ORDER) OF THE SPECIFIED CARPET TILES AND DELIVER FOR FAA 10A 531-536 SUITE RENOVATION AT THE ORVILLE WRIGHT BUILDING.
USTC FACADE CLEANING AND SEALANT REPAIR
AMPHITHEATER AND INCLUDE ADDITIONAL REFRESH SPACE TO BE ADDED PER THE ATTACHED SCOPE OF WORK DATED 08/08/2023, REFLECTING THE CHANGES.
MOD TO FURNISH & INSTALL LAMINATED MDF COUNTERTOPS.
ONE WHITE FLINT NORTH BUILDING, 11TH & 13TH FLOOR RENOVATONS, 11555 ROCKVILLE PIKE, ROCKVILLE, MD 20852.
MOD TO FURNISH & INSTALL INDUCTION UNIT PUMPS AND FURNISH & INSTALL ACCESS PANELS
Business Details
- UEI
- N8VQYJWD8CR5
- CAGE Code
- 37YM5
- Address
- 7926 JONES BRANCH DRIVE, SUITE 850
MCLEAN, VA 221023375 - Congressional District
- VA-11
- Phone
- 3013451740
Parent Company
CJW CONTRACTORS, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov