| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $20.82M | 114 |
Contract Awards
50 awards found
47PM0121F0021 PS0009 - MOD - INSTALL ADDITIONAL FIRE ALARM INDICATING DEVICES - MOD ADDS ENGINEERING/SECURITY GUARD CSO SUPPORT FOR 4 SUNDAYS. POP UNCHANGED AT 9/30/25. LOCATION: HOWARD T. MARKEY BUILDING - 717 MADISON PLACE NW, WASHINGTON, DC 20439.
MOD TO ADD RF/IR ATTENUATING WINDOW FILM TO ENHANCE INFORMATION SECURITY IN THE OFFICE OF THE COMMISSIONER (OC) SUITE.
DEOBLIGATE -$0.01 UNUSED FUNDS FROM CLIN0005 FOR THE CENSUS HEALTH BUREAU UNIT REFRESH LOCATED AT 4600 SILVER HILL RD, SUITLAND, MD 20746.
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, SUPERVISION, AND EQUIPMENT TO REPAIR AN ADDITIONAL LEAK FOUND AT THE MUNRO HQ EXTERIOR REFLECTING POND, ST ELIZABETHS CAMPUS, WASHINGTON, DC.
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO REMOVE AND REPLACE CARPET AS NEEDED IN LL2-230 AND TO REMOVE AND REINSTALL METAL BAFFLE CEILINGS IN FOUR CONFERENCE ROOMS.
TASK ORDER 47PM0323F0044 IS HEREBY MODIFIED TO DE-OBLIGATE FUNDS THAT WILL NOT BE EXPENDED DUE TO PROJECT COMPLETION. AS A RESULT OF THIS MODIFICATION, THE TOTAL CONTRACT PRICE IS DECREASED BY $6,789.95 FROM CLIN 0005 RESULTING IN A CHANGE IN PRICE.
CREDIT FOR THE CONTRACTOR NOT HAVING TO FURNISH 70 LF OF 4INCHCONDUIT FOR WORK PERFORMED RELATED TO ITOC ELECTRIC UPGRADES. CREDIT FOR THE DESCOPE OF DEMOLITION OF APPROXIMATELY 25 SF OF EXISTING CONCRETE FLOOR SLAB IN LL2-250
CREDIT FOR THE CONTRACTOR'S LACK OF AN APPROVED ON-SITE QUALITY CONTROL MANAGER UNDER THE PROJECT FOR 45 WORK DAYS FROM JUNE 10, 2024 THROUGH AUGUST 15, 2024. 14 WORKDAYS IN JUNE, 20 WORKDAYS IN JULY, AND 11 WORKDAYS IN AUGUST.
47PM0121F0021 PS0007 - MOD TO ADD FUNDS INSTALL ADDITIONAL FIRE ALARM INDICATING DEVICES - MOD TO EXTEND POP AND ADD COST DIFFERENTIAL FOR WEEKEND OVERTIME. POP EXTENDED 123 DAYS, FROM 03/31/2025 TO 08/01/2025. LOCATED AT NATIONAL COURTS COMPLEX.
A CREDIT TO THE GOVERNMENT FOR THE CONTRACTOR'S OVERCHARGE ON A BOND FOR PS0003 IN CLIN 0007
SELECTIVE DEMO AND INSTALL OF RECONFIGURED PREVIOUSLY INSTALLED FIRE ALARM PATHWAYS, CIRCUITRY, TERMINATIONS TO DEVICES IN 3 LOCAL AREA NETWORK RMS. IN ADDITION, A NEW FIRE ALARM SUBPANEL SHALL BE INSTALLED PER THE GSA FLS FIRE MARSHALL DIRECTIVE
ADDITIONAL WORK OC REFRESH AT THE RONALD REAGAN BUILDING, 1300 PENNSYLVANIA AVE. N.W. WASHINGTON D.C
MODIFICATION TO ADD ADDITIONAL WORK ITEMS. THIS IS FOR THE CENSUS HEALTH UNIT PROJECT AT THE 4600 BUILDING, 4600 SILVER HILL ROAD, SUITLAND, MD
MODIFICATION TO DESCOPE SOME ITEMS FROM THE SCOPE OF WORK AND ADD ADDITIONAL ITEMS. THIS IS FOR THE CENSUS HEALTH UNIT PROJECT AT THE 4600 BUILDING, 4600 SILVER HILL ROAD, SUITLAND, MD.
1. CONSTRUCT/INSTALL AN ADD'L COUNTERTOP IN MEZZANINE AREA OF HITCHCOCK HALL,2. INSTALL NEW LIGHTING CONSOLE TO PROVIDE USERS WITH ABILITY OF INDIVIDUAL FIXTURE CONTROL TO INCLUDE POSITION, TEMPERATURE, AND INTENSITY OF THE LIGHTING.
PROVIDE LABOR, MATERIALS, SUPERVISION, AND EQUIPMENT TO REMEDIATE AND REPAIR THE WATER DAMAGE IN LL3-351 BUNK ROOM IN THE DOC A
ADDITIONAL OC REFRESH WORK AT THE RONALD REAGAN BUILDING, 1300 PENNSYLVANIA AVE. N.W WASHINGTON D.C
PROVIDE LABOR, MATERIALS, SUPERVISION, AND EQUIPMENT TO DESIGN AND RELOCATE SEATING IN HITCHCOCK HALL
PROVIDE LABOR, MATERIALS, SUPERVISION, AND EQUIPMENT TO COMPLETE VARIOUS SCOPE OF WORK 21-CALENDAR DAY EXTENSION FOR COMPLETION
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO PROVIDE TWO (2) CABLE REELS FOR THE CABLE MANAGEMENT SYSTEM ASSOCIATED WITH MOTORIZED HOISTS.
MODIFICATION FOR THE HEALTH CENSUS UNIT REFRESH PROJECT TO ADD CHANGES TO THE SOW TO INCLUDE REPLACING THE EXISTING VCT FLOORING, PAINTING ADDITIONAL ROOMS AND ADDING CARD READERS TO OFFICES/ROOMS WITHIN THE HEALTH UNIT. IN ADDITION, EXTEND THE POP.
THIS MODIFICATION IS FOR THE UPGRADE RESTROOM EXHAUST SYSTEM AT THE BOWIE COMPUTER CENTER (BCC). THIS IS TO ADJUST THE LABOR COST FOR THE NIGHTTIME DIFFERENTIAL AND CREDIT THE GOVERNMENT BACK FOR UNUSED FUNDS IN THE AMOUNT OF $6,524.00.
47PM0223F0010, ROOF ANCHOR REPAIRS, HARVEY W. WILEY FEDERAL BUILDING, 5001 CAMPUS DRIVE, COLLEGE PARK, MD 20740 IS MODIFIED TO DEOBLIGATE THE REMAINING FUNDS ON THE CONTRACT AND CLOSE.
MODIFICATION OC REFRESH RONALD REAGAN BUILDING, WASHINGTON D.C
PROVIDE LABOR, MATERIALS, SUPERVISION AND EQUIPMENT TO COMPLETE THE SOWS FOR LIGHTING CHANGES, RFI 115 AND LL2-301 PULL DOWN LADDER, RFI 149
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO PERFORM WALL PENETRATION SEALING IN THE ITOC WALL UNDER RAF, AS REQUESTED IN THE ITOC RFI-0001, DATED DECEMBER 15, 2003, AND SUBSEQUENT ITOC-RFI #001.
REROUTE ELECTRICAL CONDUIT RESPONSELL2-520, SPEAKER RESPONSE , EMERGENCY LIGHTING, COVE LIGHTING CONTROLS, WALKABLE LID LIGHTING & POWER, CONTRACT EXTENSION COMPENSABLE COSTS, POWER PANEL RELOCATION, TV WALL IMPACTS
47PM0121F0021 PS0006 - MOD TO ADD FUNDS INSTALL ADDITIONAL FIRE ALARM INDICATING DEVICES - MOD EXTENDS POP 731 DAYS, FROM 03/31/2023 TO 03/31/2025, CORRECTS INCORRECTLY ANCHORED JUNCTION BOXES, AND ADDS A COST DIFFERENTIAL FOR WEEKEND OVERTIME HOURS.
47PM0121F0021, MOD PS0005 - DE-OBLIGATION FOR INSTALL FIRE ALARM DEVICES - DESCOPE SEVERAL DEVICES FROM ORIGINAL PROJECT SCOPE.
SINKHOLE DE OBLIGATION DUE TO NEW DESIGN REQUIREMENTS.
CENSUS HEALTH UNIT REFRESH AT 4600 SILVER HILL ROAD, IS MODIFIED TO INCORPORATE CHANGES REQUESTED TO INCLUDE CHANGING THE FINISHES/ SPECIFICATIONS AND ADDITIONAL WORK TO THE UNIT REFRESH PROJECT. THIS ADDITIONAL WORK WILL HELP ALIGN WITH PROJECT.
OFFICE OF THE COMMISSIONER REFRESH AT THE RONALD REAGAN BUILDING LOCATED AT 1300 PENNSYLVANIA AVE. N.W. WASHINGTON D.C
CONTRACTOR SHALL PROVIDE THE LABOR, MATERIALS, AND EQUIPMENT TO PROVIDE ALL SUBMITTALS AND RELATED WORK ASSOCIATED WITH RFI 118.1 RESPONSES INTERIOR SIGNAGE.
CREDIT ON THE BOND PAID FOR THE NBIC ENCLOSURE WORK COMPLETED AS PART OF THE MUNRO OPTIMIZATION PROJECT.
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO PROVIDE ADDITIONAL SERVICES TO COMPLETE THE NBIC ENCLOSURE IN THE USCG HQ
THIS MODIFICATION IS FOR THE UPGRADE RESTROOM EXHAUST SYSTEM AT THE BOWIE COMPUTER CENTER (BCC). THIS IS TO INCLUDE ADDITIONAL REQUIREMENT TO ADJUST THE LABOR COST FOR THE NIGHTTIME DIFFERENTIAL.
CONTRACTOR SHALL PURCHASE, INSTALL SPEAKERS, SUPPORTING DEVICES AT GATEHOUSES 1,3,5, AND 6 ON THE ST E W CAMPUS. CONTRACTOR SHALL BE RESPONSIBLE FOR INSPECTION OF FIRE ALARM AND MASS NOTIFICATION SYSTEMS AND BE PRESENT DURING SYSTEMS COMMISSIONING.
CONTRACTOR SHALL FURNISH AND INSTALL ONE 42 BY 20 DUCT MOUNTED SECURITY BAR IN THE EXISTING 42 X 20 RETURN DUCT INSIDE THE LL3 CYBER SUITE. CANVAS FLEXIBLE CONNECTOR AND AN ACCESS DOOR SHALL BE PROVIDED.
PROVIDE AL LABOR, MATERIALS, SUPERVISION, AND EQUIPMENT TO DEMO RELOCATE WATER LINES AND EXISTING ELECTRICAL PATHWAY RFI 37.1 AND TO ESTABLISH BAS ADDL POWER RFI 111
THIS MODIFICATION IS TO UPGRADE RESTROOM EXHAUST SYSTEM AT BCC TO ADD TWO EXHAUST FAN AIR VENTILATION AND ADDITIONAL ROOF WORK IN ROOF AREA TO INSTALL THE EXHAUST VENTS, AND COMPENSATE THE GC TO CONVERT PDF DRAWINGS TO CADD DRAWINGS FOR THE DESIGN.
CENSUS HEALTH UNIT REFRESH AT 4600 SILVER HILL ROAD, IS MODIFIED TO INCORPORATE CHANGES REQUESTED TO INCLUDE CHANGING THE FINISHES/ SPECIFICATIONS AND ADDITIONAL WORK TO THE UNIT REFRESH PROJECT. THIS ADDITIONAL WORK WILL HELP ALIGN WITH PROJECT.
PDL NTE BULLETIN 2 & BULLETIN 3
SINKHOLE PROJECT
UNFORESEEN CONDITIONS
PROVIDE LABOR, MATERIALS, SUPERVISION, AND EQUIPMENT FOR 5 MISC. SCOPES OF WORK NEEDED TO MOVE FORWARD WITH THE DOC A 2D TENANT BUILDOUT PROJECT.
DEFINITIZE PC0005 NTP/NTE FOR BULLETIN 1.
PROVIDE LABOR, MATERIALS, SUPERVISION, EQUIPMENT TO INTEGRATE THE VOICE AND FIRE PANEL OF THE MASS NOTIFICATION SYSTEM FOR ST. ELIZABETHS INTO THE BLACKBERRY ADHOC SYSTEM
PROVIDE THE DESIGN, AS WELL AS PROVIDE THE LABOR, MATERIALS, SUPERVISION AND EQUIPMENT FOR AUDITORIUM LIGHTING UPGRADES IN HITCHCOCK HALL PURCHASE AND INSTALLATION OF NEW STUDIO BACKDROPS FOR HITCHCOCK HALL AND THE CENTER BUILDING.
PROVIDE LABOR, MATERIALS, SUPERVISION, AND EQUIPMENT TO PERFORM SCOPE OF WORK PER BULLETIN 1. 101 CAL DAY EXTENSION
PROVIDE ADDITIONAL SUPERVISION, AND PROVIDE LABOR, MATERIALS, SUPERVISION, AND EQUIPMENT FOR ACCESS PANELS AND DUCT LINER/SHADES FOR THE MUNRO OPTIMIZATION PROJECT AT USCG HQ.
Business Details
- UEI
- NLGMVCHN9433
- CAGE Code
- 6CP08
- Address
- 1131 BENFIELD BLVD STE J
MILLERSVILLE, MD 211082633 - Congressional District
- MD-03
- Phone
- 4433544077
Parent Company
CFM/SEVERN ASSOCIATES JOINT VENTURE
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov