BRINKERHOFF EXCAVATING AND CONSTRUCTION, INC.
OGDEN, UTAH 844049722
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 237310 | $10.48M | 30 |
Contract Awards
25 awards found
DOCK REPAIR AT BUILDING 5. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE MOST CURRENT STATEMENT OF WORK ATTACHED TO THE BASE IDIQ CONTRACT, AND THE MOST CURRENT STATEMENT OF WORK ATTACHED TO THIS TASK ORDER.
ALABAMA HAWTHORNE HMA ASPHALT REMOVE AND REPLACE AT HILL AFB. DUE TO FUNDING, THIS TASK ORDER ENCOMPASSES ONLY OPTIONS B AND C OF THE TASK ORDER STATEMENT OF WORK AND OPTION A IS HEREBY EXCLUDED.
AIRFIELD MAINTENANCE FY25 AT HILL AFB. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE MOST CURRENT STATEMENT OF WORK ATTACHED TO THE BASE IDIQ CONTRACT, AND THE MOST CURRENT STATEMENT OF WORK ATTACHED TO THIS TASK ORDER.
REPAIR LAUNCH FACILITY PAVEMENT AT BLDG. 11536.
PZIOC/IDIQ: B2721 POND EXTENSION DRAINAGE BASIN PARKING LOT AT HILL AFB.
COMPREHENSIVE 309TH PAVING PROJECT INCLUDES REPAIR/REPLACE/CONSTRUCT PAVEMENTS AND APPURTENANCES AROUND BLDGS 238, 265, 507, 510, 586 AND 746 AT HILL AFB TO BE PERFORMED IN ACCORDANCE TO MOST CURRENT BASE IDIQ CONTRACT, IDIQ SOW AND TASK ORDER SOW.
REMOVING AND REPLACING PAVING ON WEST ALASKA AT HILL AFB. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE MOST CURRENT STATEMENT OF WORK ATTACHED TO THE BASE IDIQ CONTRACT, AND THE MOST CURRENT STATEMENT OF WORK ATTACHED TO THIS TASK ORDER.
CONCRETE AND ASPHALT PAVING CONSTRUCTION- UTTR REPAIR PAVEMENT LAMBERT BLVD. THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE $253.03 FROM THE REMAINING BALANCE.
WORK TO BE PERFORMED ON BLDG 5 BAY C.
PAVING CHANGE ORDER ON 508 P-LOT.
REMOVE AND REPLACE PAVING ALONG SOUTHBOUND E ST.
PAVEMENT PROJECT ON H AVE
REPLACING PAVING FROM BALMER TO 6TH.
REMOVE AND REPLACE PAVEMENT ON WEST ALASKA.
REPAIR BUILDING 5 DOCK
REPLACE PAVING AT MUSEUM LOT AND ROAD
REMOVE AND REPLACE 508 LOT FOULIOS RD. HMA
TURN EXPANSION FOR THE NORTH AND SOUTH END OF THE RAMPS.
MINIMUM GUARANTEE FOR HILL AFB PAVING IDIQ
FULL DEPTH RECLAMATION AND PAVEMENT OF ALASKA DRIVE PART 2 AT HILL AFB.
MILLING AND REPLACING ASPHALT ON WARDLEIGH FROM ARSENAL TO JUST BELOW THE TANKS, AT HILL AFB.
REMOVAL AND REPLACEMENT OF THE DORM PARKING LOT NORTH AND WEST OF BUILDING 341 AT HILL AFB.
FULL-DEPTH RECLAMATION OF 65,000 SQUARE FEET OF ALASKA DRIVE AT HILL AFB.
INSTALL ASPHALT, CONCRETE, AND BLOCK HEATERS AT PARKING LOT 3 AT HILL AFB
EXTEND PARKING LOT PAVING BLDG 843
Business Details
- UEI
- KJ6EN85S5KC6
- CAGE Code
- 1RP79
- Address
- 3738 N HIGLEY RD
OGDEN, UT 844049722 - Congressional District
- UT-01
- Phone
- 8017313391
Parent Company
BRINKERHOFF EXCAVATING AND CONSTRUCTION, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov