BIRMINGHAM INDUSTRIAL CONSTRUCTION, LLC
DBA: BIRMINGHAM INDUSTRIAL CONSTRUCTION LLC
ALABASTER, ALABAMA 350074863
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $151.90M | 205 |
| 236210 | $44.74M | 39 |
| 238160 | $0 | 1 |
Contract Awards
50 awards found
CONSTRUCTION PROJECT 619-21-102 CORRECT PHYSICAL SECURITY DEFICIENCIES, RENOVATION BLDG 18 AND SMART KEYING SYSTEM
ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM) INFRASTRUCTURE UPGRADES, VETERANS AFFAIRS MEDICAL CENTER (VAMC) BIRMINGHAM, ALABAMA
564-24-104 P00003 CHANGE ORDER FOR ELECTRICAL CONDUIT CDRN-07
RENOVATION OF APPROXIMATELY 25,000 SQ FT OF EXISTING SCI WARD IN BUILDING 137C AND APPROXIMATELY 3,200 SQ FT OF NEW CONSTRUCTION ATTACHED TO EXISTING BUILDINGS. ONCE COMPLETED AREA WILL CONTAIN BEDROOMS AND CONNECT PATIENT ROOMS WITH DINING AREA.
RENOVATE 5B NORTH AND EAST FOR SPECIALTY CLINIC
THE PURPOSE OF THIS TASK ORDER IS TO REPLACE THE ROOF OF THE MAIN MANUFACTURING BUILDING AT MICHOUD ASSEMBLY FACILITY, BUILDING 103, WHICH SUPPORTS SPACE LAUNCH SYSTEM (SLS) AND ORION MANUFACTURING.
SANITARY SEWER PHASE 1
619-20-103 | CORRECT FCA DEFICIENCIES IN BOILER PLANT, BUILDING #14
PURPOSE OF THIS MODIFICATION IS TO CHANGE PERIOD OF PERFORMANCE TO 25 AUGUST 2025.
REPLACE AND REPAIR OF SANITARY SEWER SYSTEMS AT NASA LANGLEY RESEARCH CENTER - PHASE 1.
MODIFICATION P00005. EXECUTING PR 010, 011, 012. THIS IS AN IN SCOPE MODIFICATION TO CORRECT ISSUES FOUND DURING THE RENOVATION.
ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM) INFRASTRUCTURE UPGRADES, VETERANS AFFAIRS MEDICAL CENTER (VAMC) BIRMINGHAM, ALABAMA
A1 LEVEL 4 ASPIRATOR DECK REFURBISHMENT BUILDING 4120
MODIFICATION 009. FUNDING PRS 005, 006, 014, 016, 017 AND 018. MODIFICATION WILL CLOSE OUT CREDITS AND INITIATE PERFORMANCE ON PR 014 AND PR 018.
LOW VOLTAGE ARC FLASH DESIGN/BUILD
NATIONAL CENTER FOR CRITICAL INFORMATION PROCESSING AND STORAGE IPS ZONE H1 BUILDOUT AT STENNIS SPACE CENTER, MS
BASE AUTOMATED RECORD FIRE PLUS RANGE
ALL LABOR, EQUIPMENT, TRANSPORTATION, AND TOOLS REQUIRED A FULL RENOVATION OF B454 INTO WASH RACK. SEE STATEMENT OF WORK (SOW), ELECTRICAL, PLUMBING, DRYWALL, IAW 100% DESIGN, 100% SPECS, AND ALL RELATED AF REQUIREMENTS AND OTHER CODES AND REFERENCES
MULTIPLE AWARD TASK ORDER CONTRACT LOCATION 3-ALABAMA OPTION YEAR 4 RENEWAL
LOW VOLTAGE ARC FLASH DESIGN/BUILD
VUZ VOR STAIRWAY REFURBISH AND REPAIR
564-24-104 P00002 CHANGE ORDER FOR MED GAS LINES.
EXECUTE PR007 AND PRO10, RELINING SEWER PIPES AND UPDATING WIRE MOLDING
B603 FACILITY GENERATOR REPLACMENT
PURPOSE OF THIS MODIFICATION IS TO REDUCE THE EXTENTS OF THE SITE DEMOLITION, CHANGING OF THE COLOR OF THE ROOF PANELS, RELOCATION OF DOOR 105, CHANGE PERIOD OF PERFORMANCE TO 22 AUGUST 2025. CONTRACT AWARD AMOUNT WILL BE INCREASED BY $14,737.11.
REPLACE AND REPAIR OF SANITARY SEWER SYSTEMS AT NASA LANGLEY RESEARCH CENTER - PHASE 1.
PROJECT NO. 619A-18-901 PHARMACY USP 797/800 COMPLIANCE FOR CEILING ACCESS PANELS.
CONSTRUCTION PROJECT 521-21-101 - 4TH AND 5TH FLOOR NEW FINISHES
B603 FACILITY GENERATOR REPLACMENT
MODIFICATION P00007 TO RE-WORK LMERS PAD. NEEDED TO ADDRESS UNFORESEEN SITE CONDITION AND RELOCATE FIRE HYDRANT AND EXTEND CONCRETE.
NATIONAL CENTER FOR CRITICAL INFORMATION PROCESSING AND STORAGE IPS ZONE H1 BUILDOUT AT STENNIS SPACE CENTER, MS
MODIFICATION 003 TO REPAIR ROOF AFTER IT WAS DETERMINED TO BE LEAKING, REPAIR BATHROOM WALL AND HOSE BIBB. ALL ITEM FOUND DURING THE RENOVATION.
MODIFICATION P00005, EXECUTING PROO4, PR0008, PR0011 AND PR0012
VISN 7 MATOC IDIQ BASE AWARD. TASK ORDERS WILL BE AWARDED OFF THIS CONTRACT AT ALL VISN7 MEDICAL FACILITIES
564-24-104 RENOVATE SPACE FOR LOGISTICS
REPLACE AND REPAIR OF SANITARY SEWER SYSTEMS AT NASA LANGLEY RESEARCH CENTER - PHASE 1.
REPAIR BLDG 410 ROOF
TO PROVIDE REVISED CONCRETE FOUNDATION SIZE FOR RELOCATED FLIGHT LINE SECURITY LIGHTING POLE BASE.
REPAIR BLDG 410 ROOF
ALL LABOR, EQUIPMENT, TRANSPORTATION, AND TOOLS REQUIRED A FULL RENOVATION OF B454 INTO WASH RACK. SEE STATEMENT OF WORK (SOW), ELECTRICAL, PLUMBING, DRYWALL, IAW 100% DESIGN, 100% SPECS, AND ALL RELATED AF REQUIREMENTS AND OTHER CODES AND REFERENCES
PROJECT NO. 619A-18-901 PHARMACY USP 797/800 COMPLIANCE. TIME EXTENSION
NATIONAL CENTER FOR CRITICAL INFORMATION PROCESSING AND STORAGE IPS ZONE H1 BUILDOUT AT STENNIS SPACE CENTER, MS
MOD TO INCORPORATED CHANGES IN PR-0001 THROUGH PR-0004 IAO $11,514.00
PROJECT # 619A4-19-101 - CORRECT CRITICAL ELECTRICAL PLUMBING AND ARCHITECTURE DEFICIENCIES IN BUILDING 129 ON TUSKEGEE VETERAN MEDICAL CENTER
MSFC THERMAL ENERGY STORAGE TANK
THIS PROJECT WILL ADD A SECOND THERMAL ENERGY STORAGE (TES) TANK TO THE CENTRAL CHILLED WATER PLANT (CCWP) SYSTEM. THE TANK IS DESIGNED TO REPLICATE THE EXISTING TES TANK (APPROXIMATELY 1.2M GALLONS) AT THE CCWP.
RELOCATE EXISTING COPPER AND FIBER OPTIC CABLING SERVICING B1403(WHICH IS BEING DEMOED IN THIS PROJECT) AND REPLACE APPROXIMATELY 250 CUBIC YARDS OF UNSUITABLE SAND LIKE SOILS.
CONSTRUCTION REQUIREMENT TO REPLACE FIRE ALARM AT BIRMINGHAM VAMC.
CONSTRUCTION PROJECT 521-21-101 - 4TH AND 5TH FLOOR NEW FINISHES
LOW VOLTAGE ARC FLASH DESIGN/BUILD
Business Details
- UEI
- ZN18CLHUHKK4
- CAGE Code
- 4NRN3
- Address
- 105 CORPORATE WOODS CIR
ALABASTER, AL 350074863 - Congressional District
- AL-06
- Phone
- 2059305995
Parent Company
BIRMINGHAM INDUSTRIAL CONSTRUCTION, LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov