BARR ENGINEERING CO.
MINNEAPOLIS, MINNESOTA 554355423
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541330 | $2.42M | 53 |
| 541199 | $99K | 2 |
| 541620 | $-4,010.49 | 2 |
Contract Awards
25 awards found
MODIFICATION P00005 IS TO: REVISE THE SOW TO 100% DESIGN, EXTEND THE COMPLETION DATE 6/30/2026, AND ADD LINE 30 AS AN EQUITABLE ADJUSTMENT FOR THE CHANGE.
MOD 3 TO ADD CA OPTION WORK AND EXTEND POP PLUM ISLAND EAST PIER SCHEMATIC DESIGN OPTIONS
MN DIVISION OF REFUGE/R3 HOGBACK RIDGE MOD 4 TO ADDRESS THE MNDOT REVIEW COMMENTS THAT WERE SUBMITTED THAT REQUIRE ADDITIONAL REVISIONS TO BRING THE DESIGN DOCUMENTS TO 100% COMPLETION.
MOD 2 TO ADD GEOTECH INVESTIGATION AND EXTEND POP PLUM ISLAND EAST PIER SCHEMATIC DESIGN OPTIONS
MOD 2 TO INCORPORATE OPTIONAL DELIVERABLES AND EXTEND POP ON FORD MARSH FISH PASSAGE INVESTIGATION 1.5
DWP AE MAC
DEOBLIGATION OF RESIDUAL FUNDS AFTER RECEIPT OF THE RELEASE OF CLAIMS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
MOD 7: TO DEOBLIGATE THE MINIMUM GUARANTEE
2024 IDALIA AND WATER VALLEY AND SIKESTON RELAY REPLACEMENT INSTALLATION SUPPORT
FORD MARSH FISH PASSAGE INVESTIGATION 1.5
WINDOM TRAIL, BRIDGE REPLACEMENT, AND PARKING LOT DESIGN
PLUM ISLAND EAST PIER SCHEMATIC DESIGN OPTIONS
MN DIVISION OF REFUGE/R3 HOGBACK RIDGE
PPNM ROCK BLOCK MONITORING SERVICES
FY23ECU193 - EXPERT WITNESS
GAOA - CIVIL IDIQ FOR SENEY NWR VISITOR CENTER AND ADMIN BUILDING WEEKLY CONSTRUCTION INSPECTION SERVICES
IL-CRAB ORCH NWR-LINE RD & PARKING LOTS MOD 1 TO ADD FUNDS TO ACCELERATE AE DESIGN SERVICES OF THE DK PARKING LOTS, AND BOAT LAUNCH.
IL-CRAB ORCH NWR-LINE RD & PARKING LOTS
THIS SCOPE OF WORK IS ONLY FOR A PHASE 1 ARCHEOLOGICAL STUDY AND GEOTECHNICAL INVESTIGATION. THE FWS REQUIRES PROFESSIONAL SERVICES FOR THE PROPOSED RECONSTRUCTION AND REDESIGN OF THE LYNDALE AVENUE BOAT LANDING PARKING LOT. THE BOAT LANDING & PA
ND-SALYER NWR-ELECTRIC FISH BARRIER
MOD 1, ADD'L IN SCOPE WORK FOR THE FORD MARCH FEASIBILITY STUDY
GAOA - SEISMIC REVIEW AT CRAB ORCHARD NWR MOD 1: ADDITIONAL WORK WITHIN SCOPE
PPNM ROCK BLOCK MONITORING SERVICES
MN-FWS DIV OF REFUGES/RF-3-AE DSGN TRAIL
GAOA - SEISMIC REVIEW AT CRAB ORCHARD NWR
Business Details
- UEI
- KHK9VCJE7SJ1
- CAGE Code
- 0FDR4
- Address
- 4300 MARKETPOINTE DR, STE 500
MINNEAPOLIS, MN 554355423 - Congressional District
- MN-03
- Phone
- 9528322600
Parent Company
BARR ENGINEERING CO.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov