BAE SYSTEMS LAND AND ARMAMENTS L.P.
STERLING HEIGHTS, MICHIGAN 483124648
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 336992 | $1.78B | 361 |
| 336999 | $223.86M | 41 |
| 541330 | $173.87M | 137 |
| 541715 | $1.17M | 7 |
Contract Awards
50 awards found
FSR SUPPORT FOR 11TH MEU
FSR SUPPORT FOR 11TH MEU
THIS EFFORT IS FOR THE DEVELOPMENT AND INTEGRATION OF GROUND VEHICLE SURVIVABILITY TECHNOLOGIES, AND THE HARDWARE, SOFTWARE, MATERIAL, TRAVEL, AND TESTING.
DELIVERY ORDER FOR PARTS UNDER CLIN 0001 IN THE AMOUNT OF $238,675.76
ORDER FOR COLD WEATHER ALL-TERRAIN VEHICLES AND INCIDENTAL SERVICE SUPPORT.
INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES.
FUNDING FOR TI 30 FACARS SUSTAINMENT.
THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE M113 IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
DELIVERY ORDER FOR PARTS UNDER CLIN 0001 IN THE AMOUNT OF $179,205.65
ARMORED MULTIPURPOSE VEHICLE(AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL SUPPORT, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT.
THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 5C SLINS 7301AC, 7302AC, 7303AC, AND 7304AC PURSUANT TO FAR CLAUSE 52.217-7, OPTION FOR INCREASED QUANTITY, SEPARATELY PRICED LINE ITEM AND ADJUST THE QUANTITY FOR SLIN 7301AC FROM 30 TO 31.
DELIVERY ORDER FOR CATV SERVICES
BILATERAL MODIFICATION TO UPDATE CLINS 8103, 8104, AND 8105 TO CPFF COMPLETION, DEOBLIGATE $1,311,800.00 OFF OF CLIN 8105, AND UPDATE ATTACHMENTS 2, 10.2, AND 33.
ARMORED MULTIPURPOSE VEHICLE(AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT.
ARMORED MULTIPURPOSE VEHICLE(AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL SUPPORT, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT.
ORDER FOR 15 GPS
ARMORED MULTIPURPOSE VEHICLE(AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL SUPPORT, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT.
ARMORED MULTIPURPOSE VEHICLE(AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL SUPPORT, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT.
THIS MOD IS TO DOCUMENT THE INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5B IN ACCORDANCE WITH SECTION G.14, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND TO INCREMENTALLY FUND CLIN 8201, ACV-R MRV, AND CLIN 8203, ACV-R TEST SUPPORT
THE PURPOSE OF THIS MOD IS TO INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5B IN ACCORDANCE WITH SECTION G.14, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND TO INCREMENTALLY FUND CLIN 8201, ACV-R MRV PHASE 2, AND CLIN 8203, ACV-R PHASE 2
ARMORED MULTIPURPOSE VEHICLE(AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL SUPPORT, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT. THIS MODIFICATION ESTABLISHES WD# FOV-A-25-F0007-069 CDECA PHASE II
FRP LOT 5B OPTION EXERCISE
CATV SPARE PARTS DELIVERY ORDER #1
ARMORED MULTIPURPOSE VEHICLE(AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL SUPPORT, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT. THIS MODIFICATION ESTABLISHES WORK DIRECTIVE FOV-P-24-F0007-058 AMPV NMWR.
SUSTAINMENT SYSTEMS TECHNICAL SUPPORT. THIS MODIFICATION ESTABLISHES VPS BASE KIT WITH LWR AMPV INTEGRATION WD# FOV-R-23-F0007-010 REV 1.
INCORPORATE FUNDING FOR THE FIELD SERVICE REPRESENTATIVE (FSR) GAP BETWEEN FULL RATE PRODUCTION (FRP) LOTS 4B AND 5A FOR CLIN 7203, FIELDING AND SUPPORT COSTS FRP LOT 4, FOR CAMP PENDLETON, CAMP LEJEUNE, AND OKINAWA
ARMORED MULTIPURPOSE VEHICLE(AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL SUPPORT, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT.
INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5A AND TO UPDATE FAR 52.216-16, INCENTIVE PRICE REVISION-FIRM TARGET, FROM "BY REFERENCE" TO "BY FULL TEXT"
CATV ORDER FOR 16 GPS
ACV-30 FRP LOTS 5-6 (EXERCISE CLINS FOR FRP LOT 5A)
ARMORED MULTIPURPOSE VEHICLE (AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL SUPPORT, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT. THIS MODIFICATION ESTABLISHES 3UE FSR NET SUPPORT WD FOV-P-25-F0378-076
ACV-30 FRP LOTS 5-6 (EXERCISE CLINS FOR FRP LOT 5A)
INCREMENTALLY FUND CLIN 8103, ACV-30 PRODUCTION READINESS TEST VEHICLES (PRTV) DESIGN AND DEVELOPMENT PHASE 4
DELIVERY ORDER FOR PARTS UNDER CLIN 0001 IN THE AMOUNT OF $137,428.20
ARMORED MULTIPURPOSE VEHICLE(AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL SUPPORT, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT. THIS MODIFICATION ESTABLISHES 2UE POST NET FSR SUPPORT WD FOV-P-25-F0378-074.
ARMORED MULTIPURPOSE VEHICLE(AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL SUPPORT, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT. THIS MODIFICATION ESTABLISHES REVISION 3 TO OBSOLESCENCE 2 WD FOV-P-23-F0378-046.
UPDATE THE VALUE AND FUNDING FOR CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR NRE COSTS FOR ECP 65 DESIGN EFFORT, AND INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
DELIVERY/TASK ORDER SUPPORT TO FUND CLIN 0004 FOR ORDERING PERIOD 5
ARMORED MULTIPURPOSE VEHICLE(AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL SUPPORT, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT. THIS MODIFICATION ESTABLISHES OBSOLESCENCE 4 WD AND REVISES APF FSR SUPPORT WD.
ARMORED MULTIPURPOSE VEHICLE(AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL SUPPORT, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT. THIS MODIFICATION ESTABLISHES FRP DEPROCESSING CYCLIC MAINT SUP WD FOV-P-24-F0378-061
INCREMENTALLY FUND CLINS 8201 AND 8203
DELIVERY ORDER FOR PARTS UNDER CLIN 0001 AND 0003 IN THE AMOUNT OF $8,669,278.95
ARMORED MULTIPURPOSE VEHICLE(AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL SUPPORT, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT. THIS MODIFICATION ESTABLISHES ENGINEERING CONFIGURATION STUDY WORK DIRECTIVE.
THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
INCORPORATE VALUE AND FUNDING UNDER CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR ACV-30 DRAWINGS UPDATE FOR FULL RATE PRODUCTION (FRP) LOTS 5-6, TASK INSTRUCTION (TI) NO. 29 EXTEND THE PERIOD OF PERFORMANCE (POP) ON CLINS 6203AB, FSR 15TH MEU: 1ST FIELD SERVICE REPRESENTATIVE (FSR) DEPLOYMENT, AND 6203AE, FSR 15TH MEU: 2ND FSR DEPLOYMENT AND UPDATE ATTACHMENTS 16, 16.1, AND 16.2, TECHNICAL MANUAL CONTRACT REQUIREMENT (TMCR)
ARMORED MULTIPURPOSE VEHICLE(AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL SUPPORT, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT. THIS MODIFICATION ESTABLISHES OCONUS FSR SUP 1-3ID AND EXTENDS THE POP FOR OBSO 2.
DELIVERY ORDER FOR 36 CATV GP UNDER CONTRACT W56HZV-22-D-0082
INCORPORATE INCREMENTAL FUNDING FOR CLIN 8201, ACV-R POST-CDR DESIGN AND DEVELOPMENT (PHASE 2), AND TO UPDATE DFARS 252.232-7006, WIDE AREA WORKFLOW (WAWF) PAYMENT INSTRUCTIONS.
ARMORED MULTIPURPOSE VEHICLE(AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL SUPPORT, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT. THIS MODIFICATION ESTABLISHES A WORK DIRECTIVE FOR TDP MAINTENANCE YR 4.
ARMORED MULTIPURPOSE VEHICLE(AMPV) AND M113 FAMILY OF VEHICLES SYSTEMS TECHNICAL SUPPORT, POST PRODUCTION SYSTEM SUPPORT, AND SUSTAINMENT SYSTEMS TECHNICAL SUPPORT. THIS MODIFICATION ESTABLISHES WORK DIRECTIVES FOR APG FSR SUPPORT AND GEN LOG 3.
Business Details
- UEI
- D2ETMTLWJCJ1
- CAGE Code
- 7B726
- Address
- 34201 VAN DYKE AVE
STERLING HEIGHTS, MI 483124648 - Congressional District
- MI-10
- Phone
- 5867957525
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov