ARCHITECTURAL RESOURCES GROUP, INC.
DBA: ARCHITECTURAL RESOURCES GROUP
SAN FRANCISCO, CALIFORNIA 941111498
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541330 | $10.35M | 78 |
| 541990 | $328K | 1 |
| 541370 | $240K | 3 |
| 541620 | $0 | 1 |
| 541310 | $-123,579.46 | 32 |
Contract Awards
50 awards found
ORCA 150025 CHATEAU STABILIZATION DD-CD-SS AE-DOR SERVICES.
SAMO 303051/310132 TITLE III SERVICE FOR AE SERVICES DURING CONSTRUCTION OF THE RECONSTRUCT ROCKY OAKS AND PARAMOUNT RANCH PROJECTS AT SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA
ARCH EXPAND VISITOR CENTER BOOKSTORE
CAVE DESIGN TASK ORDER FOR UNITS 6 & 8 TIME EXTENSION
GOGA CHINA BEACH TITLE 3 SERVICES A-E
AE TITLE III SERVICES IN SUPPORT OF THE AHWAHNEE HOTEL SEISMIC PROJECT AT YOSEMITE NATIONAL PARK, CALIFORNIA
MOD 5 TO REMOVE REMAINDER OF FUNDS FOR CLOSEOUT OF ORCA 150025 CORRECT CRITICAL LIFE SAFETY ISSUES IN CHATEAU, TITLE III A&E SERVICES DURING CONSTRUCTION
MOD 5- DE OB FUNDS FOVA 241806 REHAB BARRACKS BLD. 993 TIII
BEOL CONCEPT STUDY A/E
BIBE 259631 317515 - UAS SURVEY-
BIG BEND NATIONAL PARK - CHISOS MOUNTAIN LODGE RESTAURANT SURVEY MONITORING, STRUCTURAL ASSESSMENT UPDATE, SHORT TERM RECOMMENDATION, AND CONSTRUCTION DOCUMENTS. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE TO 12/31/23
BIBE 317515 - CHISOS BASIN DD-CD FINAL D MOD 005
OTHER, LYJO ALEXANDER HOUSE HSR
BEOL CONCEPT STUDY A/E
ROMO-ETHNOGRAPHIC LANDSCAPE REPORT
ARCH EXPAND VISITOR CENTER BOOKSTORE
ZION - WMCG LOOP D & E LDSCP MGMNT PLAN
SAAN-TITLE III AE HARRIS HOUSE REHAB
ORCA 339686 CHATEAU DEVELOPMENT OF LONG-TERM PROJECT OPTIONS
ORCA 150025 LONG TERM STABILIZATION OF THE OREGON CAVES CHATEAU SD.
SAMO 303051 PARAMOUNT RANCH DD - CD THE PURPOSE OF THIS MODIFICATION P00002 IS TO DEOBLIGATE EXCESS FUNDS AND CLOSE OUT THE CONTRACT.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE A TOTAL OF $8.50 AND CLOSEOUT THE TASK ORDER.
BIBE 317515 - CHISOS BASIN DD-CD FINAL D MOD 004
HUTR HISTORIC STRUCTURES REPORT FOR 6 BUILDINGS
FACLJ CHANCERY FACADE RENOVATION ASSESSMENT
BIBE 317515 - CHISOS BASIN DD-CD FINAL D MOD 003
SAMO 303051/310132 TITLE III SERVICE FOR AE SERVICES DURING CONSTRUCTION OF THE RECONSTRUCT ROCKY OAKS AND PARAMOUNT RANCH PROJECTS AT SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA - ACOUSTIC/LIGHTING MOD
BIBE 317515 - CHISOS BASIN DD-CD FINAL D MOD 002
BIBE 317515 - CHISOS BASIN DD-CD FINAL D
BIBE 317515 - CHISOS BASIN DD-CD FINAL D
SAMO 303051/310132 TITLE III SERVICE FOR AE SERVICES DURING CONSTRUCTION OF THE RECONSTRUCT ROCKY OAKS AND PARAMOUNT RANCH PROJECTS AT SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA
THE PURPOSE OF THIS MODIFICATION P00003 IS TO DEOBLIGATE EXCESS FUNDS AND CLOSE OUT THE CONTRACT.
ZION - WM CG LOOP C LDSCP MGMNT PLAN
VISITOR CENTER FOUNDATION REPAIRS AT CHACO CULTURE NATIONAL HISTORIC PARK, PMIS 334364AE SERVICES, DESIGN SERVICES FOR SCHEMATIC DESIGN (SD) DOCUMENTS AND VALUE ANALYSIS THE INTENT OF THIS PROJECT IS TO IDENTIFY SOLUTIONS TO RECTIFY THE HEAVING F
THE PURPOSE OF THIS MODIFICATION P00005 IS TO DEOBLIGATE EXCESS FUNDS AND CLOSE OUT THE CONTRACT.
CAVE DESIGN TASK ORDER FOR UNITS 6 & 8
MOD 3- TENANT TAILORING FW REDUCTION AND POP EXTENSION FOVA 241806 REHAB BARRACKS BLD. 993 TIII
AE TITLE I-II DESIGN SERVICES TO REHABILITATE AND SEISMICALLY RETROFIT HISTORIC PRISONER'S WAREHOUSE FOR VISITOR CONTACT STATION, CHANNEL ISLANDS NATIONAL PARK, CALIFORNIA, PMIS 174389 - DEDUCTIVE MODIFICATION FOR WORK WITHIN SCOPE.
LCAI ROUND 13 - 3D DOCUMENTATION OF LINCOLN COUNTY ROCK ART AND MINING STRUCTURES
SAAN REHABILITATE HARRIS HOUSE_DESIGN
SAMO 310131 PETER STRAUSS RANCH PREDESIGN AND SCHEMATIC DESIGN MODIFICATION P00001 TO DE-OBLIGATE REMAINING FUNDS AND CLOSE OUT THE TASK ORDER.
THE PURPOSE OF THIS MODIFICATION P00003 IS TO DEOBLIGATE EXCESS FUNDS AND CLOSE OUT THE CONTRACT.
YOSE 231984 THE PURPOSE OF THIS MODIFICATION P00002 IS TO DEOBLIGATE EXCESS FUNDS AND CLOSE OUT THE CONTRACT.
MOD 2- TENANT TAILORING FW FOVA 241806 REHAB BARRACKS BLD. 993 TIII
MODIFICATION TO INCORPORATE THE HIDDEN VALLEY SITE, INCREASE FUNDS, AND INCREASE LEVEL OF EFFORT IAW SOW REV2 FOR THE ROMO TRAIL RIDGE ROAD CULTURAL LANDSCAPE REPORT.
40496713_LIBI CULTURAL LANDSCAPE REPORT, MOD P00002 SUPP. AGREEMENT FOR WK. W/IN SCOPE
CARE M66 CLI AND NRHP NOM
YOSE 196447 REHABILITATE WAWONA WASTE WATER TREATMENT PLANT THE PURPOSE OF THIS MODIFICATION P00005 IS TO DEOBLIGATE EXCESS FUNDS AND CLOSE OUT THE CONTRACT.
SAAN-REPLACE VC HVAC A&E SERVICES TITLE III
EVALUATION OF CURRENT AND PROPOSED COLLECTIONS STORAGE LOCATED AT KLONDIKE GOLD RUSH NATIONAL HISTORICAL PARK, SEATTLE, WA
Business Details
- UEI
- PEALJFCMKGN4
- CAGE Code
- 3NGZ4
- Address
- 9 PIER STE 107
SAN FRANCISCO, CA 941111498 - Congressional District
- CA-11
- Phone
- 4154211680
Parent Company
ARCHITECTURAL RESOURCES GROUP, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov