APPLEDORE MARINE ENGINEERING, LLC
PORTSMOUTH, NEW HAMPSHIRE 038014370
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541330 | $19.26M | 132 |
Contract Awards
50 awards found
THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE THE OPTION FOR CONSTRUCTION PHASE SERVICES.
THE GENERATE CONSTRUCTION READY PLANS, SPECIFICATIONS AND PERMITS FOR THE RECONSTRUCTION/REPAIR OF ATON ASSETS IN THE COAST GUARD FIRST DISTRICT AREA OF RESPONSIBILITY IN SECTOR SOUTHERN NEW ENGLAND.
A/E DESIGN: REPAIR & DEMO ATON WOODS HOLE (FY24 CPOP), A/E PSN 22020804 & PSN 24868364
PERFORM ENGINEERING ASSESSMENT FOR DELTA AND ECHO WHARVES, WITH STRUCTURAL, MOORING, AND BERTHING ANALYSIS, WITH OPTION 1: DBRFP PREPARATION EMERGENT REPAIRS AND OPTION 2: IMMEDIATE REPAIR IAW SAES DATED 18 MARCH 2025.
MODIFICATION IS TO DESCOPE THE 20 HOURS OF KEY SUBMITTAL REVIEW AND PROVIDE RECOMMENDATION FOR ACCEPTANCE OR RESUBMISSION. THIS MODIFICATION CONSTITUTES FULL AND COMPLETE COMPENSATION FOR ALL COSTS AND DELAYS ARISING FROM THIS CHANGE.
PROJECT TITLE: WATERFRONT INSPECTIONS PROGRAM AT VARIOUS UNITS THROUGHOUT DISTRICTS 11 AND 13 (PSN 2418070)
WATERFRONT INSPECTION AND ASSESSMENT REGION 4, NAVMAG INDIAN ISLAND AND SWFPAC
THE PURPOSE OF THIS MODIFICATION IS TO ADD CRADLE ZONE CERTIFICATIONS AND LEVEL I INSPECTIONS OF EAST WHARF AT THE YARD IN ACCORDANCE WITH CONTRACTORS REVISED PROPOSED DATED MAY 16, 2025.
A/E DESIGN: REPAIR ATON SOUTHERN MAINE
ENGR ASSMT/RPRS AT DELTA/ECHO WHARVES
WATERFRONT INSPECTIONS SSNE, TO CONDUCT ABOVE AND BELOW WATER, WATERFRONT CONDITION INSPECTIONS OF THE SUBJECT FACILITIES, AND SUBMITTAL OF INSPECTION REPORTS. SECTION 2(D) APPLIES TO THIS ACTION
FISCAL YEAR 2025 AID TO NAVIGATION TRAINING FOR US COAST GUARD WATERWAYS OPERATIONS PRODUCT LINE. CONTRACT EXEMPTION OF EXECUTIVE ORDER "IMPLEMENTING THE PRESIDENT'S 'DEPARTMENT OF GOVERNMENT EFFICIENCY' COST EFFICIENCY INITIATIVE" VIA SECTION 2(D)
A-E SERVICES - WATERFRONT INSPECTIONS
AE DESIGN: REPAIR ATON LONG ISLAND SOUND (FY23 RPOP)
INSPECT INDUSTRIAL WHARVES/PIERS AT USCG YARD
PROJECT TITLE: WATERFRONT INSPECTIONS PROGRAM AT VARIOUS UNITS THROUGHOUT DISTRICTS 11 AND 13 (PSN 2418070)
OCEAN A-E D17 SE ALASKA WATERFRONT INSPECTIONS
FY24 INSPECT D5 AND D9 MAJOR ATON STRUCTURES
FY 2024 WATERFRONT INSPECTIONS PNUM 23946241
INSPECT D1 ATON STRUCTURES FY24, PSN 25594148
AE DESIGN: REPAIR ATON LONG ISLAND SOUND (FY23 RPOP)
SHIPLIFT LIFE CYCLE COST ANALYSIS
WATERFRONT INSPECTIONS PROGRAM AT VARIOUS UNITS THROUGHT DISTRICT 11 AND 13K.
AE DESIGN SERVICES FOR MARINE RAILWAY ON BASE KETCHIKAN
WATERFRONT INSPECTIONS SEC NY PERFORM ALL PROFESSIONAL ENG SERVICES, TO CONDUCT ABOVE AND BELOW WATER, WATERFRONT CONDITION INSPECTIONS OF THE SUBJECT FACILITIES, TO INCLUDE PREPARATION AND SUBMITTAL A WATERFRONT INSPECTION REPORT FOR EACH FACILITY
WFI AND ASSESSMENT AT NUWC KEYPORT
A&E SERVICES FOR DESIGN WATERFRONT REPAIRS AT TONGUE PT, ASTORIA, OR; PSN: 20410246
PROVIDE PROFESSIONAL ENGINEERING SERVICES TO INSPECT VARIOUS WATERFRONT FACILITIES
A-E SERVICES - WATERFRONT INSPECTIONS
AE DESIGN SERVICES FOR MARINE RAILWAY ON BASE KETCHIKAN
A-E SERVICES: ROUTINE WATERFRONT INSPECTIONS AND ASSESSMENTS OF DFSP MANCHESTER ISLAND & NAS WHIDBEY ISLAND
A/E DESIGN: REPAIR & DEMO ATON WOODS HOLE (FY24 CPOP), A/E PSN 22020804 & PSN 24868364
TO AWARD A TASK ORDER FOR THE A/E WATERFRONT LBS INSPECTION AND REPAIR TO CONDUCT STRUCTURAL INSPECTIONS AND ASSESSMENTS OF THE U.S. COAST GUARD ACADEMY WATERFRONT FACILITIES AND SHORE-SIDE LOAD-BEARING STRUCTURES (LBS).
A/E DESIGN: REPAIR ATON SOUTHERN MAINE
MOD TO ADD ADDITIONAL WORK.
PARTIAL TERMINATION FOR CONVENIENCE FOR THE INSPECTION OF THE GUAM GLASS BREAKWATER AWARDED IN MODIFICATION P00001.
AE DESIGN SERVICES MOORING BUOY SECTOR SAN JUAN
MODIFICATION TO DESCOPE SOW AND PROVIDE CREDIT TO GOVERNMENT
WATERFRONT INSPECTIONS PROGRAM
FY23 WATERFRONT INSPECTIONS TO @ VARIOUS USCG DISTRICT FIVE
AE DESIGN: REPAIR ATON LONG ISLAND SOUND (FY23 RPOP)
TO AWARD WATERFRONT INSPECTIONS FOR U.S. COAST GUARD STATIONS GLOUCESTER, POINT ALLERTON AND MERRIMACK RIVER.
TO AWARD THE WATERFRONT INSPECTION FOR U.S. COAST GUARD, BASE BOSTON, BOSTON, MA.
FY23 WATERFRONT INSPECTIONS TO @ VARIOUS USCG DISTRICT FIVE
WATERFRONT INSPECTION IS TO PROVIDE AN ENGINEERING ANALYSIS OF THE MATERIAL CONDITION OF ALL ACTIVE DLA SUSTAINED WATERFRONT FACILITIES AT WAKE ISLAND. ALL DEFECT DATA AND UPDATED CONDITION INDEXES ULTIMATELY POPULATING THE NAVYS FACILITY DATABASES.
RESURVEY UNDERWATER PORTION OF GLASS BREAKWATER AT NB GUAM.
THE PURPOSE OF THIS MODIFICATION IS FOR UNFORESEEN CONDITION. CONTRACTOR SHALL REDUCE THE SCOPE OF WORK FOR INSPECTION AND REPORT OF WINTHROP POINT LIGHT IAW ATTACHMENT NO. 1 - SCOPE OF WORK FOR MOD P00001. THE CCD REMAINS UNCHANGED.
FY23 INSPECT & CERTIFY CRADLE ZONES AT USCG YARD, BALTIMORE, MD
WFI, ASSESSMENT AND SLA AT DLA GUAM
POTABLE WATERLINE INSPECTION, WHIDBEY
Business Details
- UEI
- QGMDLA2YJ9C4
- CAGE Code
- 34GQ8
- Address
- 600 STATE ST STE E
PORTSMOUTH, NH 038014370 - Congressional District
- NH-01
- Phone
- 6037661870
Parent Company
APPLEDORE MARINE ENGINEERING, LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov