ADVON CORPORATION
DBA: ADVON CORP FL
TALLAHASSEE, FLORIDA 323083757
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $111.77M | 69 |
| 236210 | $44.38M | 80 |
| 238220 | $1.20M | 4 |
| 238160 | $0 | 1 |
Contract Awards
50 awards found
SPS RENOVATION - SETTLEMENT AGREEMENT PAYMENT.
THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE CONSTRUCTION OF THE SPECIALTY TREATMENT EXPANSION (MINOR) CONSTRUCTION PROJECT.
CONSTRUCT RENOVATE JACC PENSACOLA FL
UPGRADE MECHANICAL SYSTEMS AT THE COMPONENT REFURBISHMENT AND CHEMICAL ANALYSIS (CRCA) FACILITY CLEANROOM
DESIGN BUILD DB 573 20 608 CORRECT DEFICIENCIES AT SPS MALCOM RANDALL VAMC
ROOM CHANGES
THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE CONSTRUCTION OF THE SPECIALTY TREATMENT EXPANSION (MINOR) CONSTRUCTION PROJECT.
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE RFP01-ASI-01 UTILITY REVISION AND RFP02-ELECTRICAL CHANGES.
THE PURPOSE OF THIS MODIFICATION IS FOR THE EXPANSION OF PHASE I SCOPE OF WORK (SOW) TO INCLUDE REQUIREMENTS FROM PHASE II TO DELIVER ADDITIONAL PARKING AREA TO THE VA AS REQUESTED. THE EXTRA SPACE ADDED TO THE PARKING AREA IS 36 PARKING SPACE.
CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, & SHALL DO ALL THINGS NECESSARY RESULTING IN COMPLETION OF EXPAND VERTICAL PARKING GARAGE #2 (MINOR) CONSTRUCT PROJECT, IN ACCORDANCE WITH THE SPECS & DRAWINGS.
DESIGN BUILD DB 573 20 608 CORRECT DEFICIENCIES AT SPS MALCOM RANDALL VAMC
INSTALL LIQUID NITROGEN SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER.
ELEVATED WATER TANK PROJECT
INSTALL LIQUID NITROGEN SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY. MODIFICATION TO INCORPORATE TECHNICAL NARRATIVE (TN) 21. THE END DATE REMAINS 7/31/2026.
RENOVATE CLINICAL RESEARCH LABORATORIES
INSTALL LIQUID NITROGEN SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY. MODIFICATION TO INCORPORATE TECHNICAL NUMBER (TN)07 AND 22. THE END DATE REMAINS 7/31/2026.
INSTALL LIQUID NITROGEN SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FLORIDA
TN112 RPL GRAVEL DB
INSTALL LIQUID NITROGEN SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY. INCORPORATING TECHNICAL NUMBER (TN) 15. THE PERIOD OF PERFORMANCE END DATE REMAINS 7/31/2026.
INSTALL LIQUID NITROGEN SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY. INCORPORATING TECHNICAL NUMBER 16 (TN). THE PERIOD OF PERFORMANCE REMAINS 7/31/2026.
MFR WACO WHOLE CENTER RENOVATIONS
INSTALL LIQUID NITROGEN SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FLORIDA
INSTALL LIQUID NITROGEN SYSTEM AT LAUNCH COMPLEX 39B, NASA KSC MOD 6: INCORPORATE 2 TECHNICAL NUMBERS(TNS) TN-13 AND TN 18 AND REQUEST FOR EQUITABLE ADJUSTMENT (REA)-01. EXTEND PERIOD OF PERFORMANCE.
INSTALL LIQUID NITROGEN SYSTEM AT LAUNCH COMPLEX 39B, NASA KSC MOD 5: INCORPORATING 2 TECHNICAL NUMBERS (TNS)(TN02 AND TN09)
PRIMARY FACILITY
OKLAHOMA CITY VA HEALTH CARE SYSTEM PARKING GARAGE 2
THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE CONSTRUCTION OF THE SPECIALTY TREATMENT EXPANSION (MINOR) CONSTRUCTION PROJECT.
INSTALL LIQUID NITROGEN SYSTEM AT LAUNCH COMPLEX 39B, NASA KSC MOD 4: INCORPORATE 4 TECHNICAL NUMBERS (TNS)(TN06,TN10,TN11& TN14).
CONSTRUCTION OF VA CLINIC AT JBC
OKLAHOMA CITY VA HEALTH CARE SYSTEM PARKING GARAGE 2
NC115 STANDBY ER GENERATOR DESIGN/CONSTRUCTION
INSTALL LIQUID NITROGEN SYSTEM AT LAUNCH COMPLEX 39B, NASA KSC MOD 3: INCORPORATE 3 TECHNICAL NUMBERS (TNS), TN 03, TN 04, & TN05.
RENOVATE CLINICAL RESEARCH LABORATORIES REA
CONSTRUCT RENOVATE JACC PENSACOLA FL
ELEVATED WATER TANK PROJECT
INSTALL LIQUID NITROGEN SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FLORIDA
SETTLEMENT FOR CBCA 7533
PROJECT 520-19-117 REPAIR WATER SUPPLY MOD 4. CHANGE TO SOW, EXTEND POP AND INCREASE FUNDING.
CONSTRUCT COMMUNITY LIVING CENTER - AUGUSTA VAMC
SPS RENOVATION - DESCOPE IN THE AMOUNT OF $59,390.00 BI-LATERAL MODIFICATION.
REPLACE ROOFS AT BOOSTER FABRICATION FACILITY COMPLEX PHASE 2. INCORPORATES REQUEST FOR EQUITABLE ADJUSTMENT 01.
SEWER SYSTEM AND CONVEYANCE PH 1 AT STENNIS SPACE CENTER, MS
IMPROVE PATIENT PRIVACY 4A BLDG. 500
THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE CONSTRUCTION OF THE SPECIALTY TREATMENT EXPANSION (MINOR) CONSTRUCTION PROJECT.
REPLACE ROOFS AT BOOSTER FABRICATION FACILITY COMPLEX (BFF) PHASE 2, MOD 4 INCORPORATE TRACKING NUMBER (TN) 6. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
ELEVATED WATER TANK PROJECT
MODIFICATIONS TO LAUNCH COMPLEX 39B FOR EMERGENCY EGRESS SYSTEM. MOD 27: INCORPORATES REQUEST FOR EQUITABLE ADJUSTMENTS. CONTRACT VALUES AND FUNDING ARE INCREASED. **NOTE: THIS MOD IS LISTED AS MOD 26 IN PPS AND ON DOCUMENTS.**
ELEVATED WATER TANK PROJECT
SEWER SYSTEM AND CONVEYANCE PH 1 AT STENNIS SPACE CENTER, MS
REPLACE ROOFS AT BOOSTER FABRICATION FACILITY COMPLEX (BFF) PHASE MOD 3: INCORPORATE TRACKING NUMBERS (TN) 2, ADDITIONAL STRUCTURAL STEEL SUPPORT.
Business Details
- UEI
- YKS4HYJHGHS7
- CAGE Code
- 5VG02
- Address
- 2882 REMINGTON GREEN LN
TALLAHASSEE, FL 323083757 - Congressional District
- FL-02
- Phone
- 8507277626
Parent Company
ADVON CORPORATION
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov