MFS CONSTRUCTION LLC
SOUTH PLAINFIELD, NEW JERSEY 070802516
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $26.01M | 132 |
| 237310 | $1.11M | 1 |
| 238220 | $1.07M | 9 |
| 238140 | $462K | 2 |
| 237990 | $337K | 7 |
| 238910 | $179K | 2 |
| 238320 | $119K | 2 |
| 236210 | $20K | 1 |
| 236118 | $-34,121.59 | 3 |
Contract Awards
50 awards found
DISASTER RECOVERY: PROVIDE OPERATIONAL STARLINK CAPABILITIES CONSISTING OF A SECURE (CONFIDENTIAL) LINE ACCESSIBLE ONLY TO THE DEPARTMENT OF INTERIOR, AND A SEPARATE PUBLIC LINE CAPABLE OF LIVE STREAMING AVIARY ACTIVITIES FROM ONSITE CAMERAS. SEVER
140P4524F0038: REPLACE FLAT ROOF MEMBRANE - ELLIS B&C BUILDING AND REPAIR TILE ROOFS OF COVERED WAY 4,5 & 7, STATUE OF LIBERTY NATIONAL MONUMENT, NEW YORK & NEW JERSEY
PR- VIEQUES NWR-RVQ23/25/26-REHAB TRAILS
GA-DIV OF ENGINEERING-REHAB RT#015/929
MORR DESIGN_REPAIR GW HQ ROOF
VAMA REPLACE ROOF TEES
HOFR REPLACE AC & FURNACE AT RATH & TIC
P00001 FOR THE ADDITION OF FOR 10KW-DC OF THE PHOTOVOLTAIC (PV) MODULES TO BE USED IN THE SOLAR ENERGY SYSTEM AT THE BUNKHOUSE.
GATE-REPAIR BUILDING COMPONENTS AT SAHO MULTIPLE BUILDINGS- THE CONTRACTOR SHALL COMPLY WITH ALL ASPECTS OF THE SOW.
B300 FITNESS CENTER FLOOR PROJECT: REPLACE EXISTING FLOORING, INSTALL ELECTRICAL OUTLETS, INSTALL DIAMOND PLATE ON WALLS, ETC.
NEA HPRL#1 - RENOVATE HEADHOUSE #2 AT RUTGERS MARUCCI CENTER PH2
140P4523F0057: REPAIR EXTERIOR OLD MASTIC HOUSE - FIRE ISLAND NATIONAL SEASHORE, PATCHOGUE, NY
THE SELECTED CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT TO COMPLETE THE PROJECT CONSTRUCT FREEZER/COOLER BLDG. 5754.
REMOVE THE RUNWAY 16 MALSR AT THE WESTCHESTER COUNTY AIRPORT IN WHITE PLAINS, NY.
MORR PASSAIC BRIDGE - CONSTRUCTION
EDISON REHABILITATE MECHANICAL SYSTEMS
MOD-P00001 FOR GREAT SWAMP NWR MULTI-PURPOSE (ADDITION TO FENSKE VC) IS ISSUED TO INCREASE THE TOTAL CONTRACT VALUE BY $16,119.10 TO A NEW TOTAL CONTRACT VALUE OF $4,955,535.58, FOR THE FOLLOWING ADDITIONAL WORK: REMOVAL OF FIVE TREES, NOT ORIGINALLY
MODIFICATION CONSTRUCTION SERVICES TASK REPAIR AND REPLACEMENT WINDOW & SHUTTER
MODIFICATION P00003: 1. THIS MODIFICATION FOR THE INSTALLATION OF OF AN EXHAUST FAN IN EACH BATHROOM, INSTALLATION OF 2 VENTILATION EXHAUST IN THE ROOF AREA AND THE REPLACEMENT OF 2-BATHROOM DOORS WITH METAL-LOUVER DOOR FOR MOLD REMEDIATION FOR THE
PR-VIEQUES NWR-MAINT SHOP 303 REHAB
NEA HPRL#1 - RENOVATE HEADHOUSE #2 AT RUTGERS MARUCCI CENTER PH2
PR-VIEQUES NWR-PHOTOVOLTAIC PW SYS REHAB
SPECIALIZED HIGH VOLTAGE ELECTRICAL REPAIRS AND RELATED INFRASTRUCTURE MAINTENANCE WORK AT THE SABANA RESEARCH FIELD STATION AND TRACE PROJECT.
PR-CULEBRA NWR-QUARTERS 1 REHABILITATION
140P4524F0038: REPLACE FLAT ROOF MEMBRANE - ELLIS B&C BUILDING AND REPAIR TILE ROOFS OF COVERED WAY 4,5 & 7, STATUE OF LIBERTY NATIONAL MONUMENT, NEW YORK & NEW JERSEY
PR-VIEQUES NWR-MAINT SHOP 303 REHAB
TO REPLACE THE EXISTING CHEMICAL LABORATORY FACILITY. THE COMPOUND IS LOCATED INSIDE THE UNIVERSITY OF PUERTO RICO'S JARDIN BOTANICO AT RIO PIEDRAS.
EDISON REHABILITATE MECHANICAL SYSTEMS
140P4523F0057: REPAIR EXTERIOR OLD MASTIC HOUSE - FIRE ISLAND NATIONAL SEASHORE, PATCHOGUE, NY
140P4524C0036: PERFORM WATER INFILTRATION MITIGATION - GATEWAY NATIONAL RECREATION AREA
PURPOSE OF MODIFICATION: 1) UPDATING CONTRACTING OFFICER FROM S. PACKARD TO M. KEITH; 2) ADDING DEAERATOR SOW FOR WORK WITHIN SCOPE
NEA HPRL#1 - RENOVATE HEADHOUSE #2 AT RUTGERS MARUCCI CENTER PH2
GATE-REPAIR AND LINE SEWER MANHOLES-SAHO MODIFICATION 4 IS TO DELETE -.01 FROM FUNDING DUE TO ROUNDING ISSUES, ALLOWING FOR CONTRACT CLOSEOUT.
REHABILITATE BLUESTONE WALKWAY-THIS IS A FIRM FIXED PRICE CONTRACT TO REHABILITATE THE BLUESTONE PANEL WALKWAY IN FRONT OF HISTORIC FORD MANSION. THE CONTRACTOR SHALL PERFORM WORK IN ACCORDANCE WITH THE STATEMENT OF WORK.
IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK, THIS AWARD IS TO CONSTRUCT A NEW MULTI-PURPOSE FACILITY ADDITION AT GREAT SWAMP NWR-NJ.
THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING AND EXTEND THE PERIOD OF PERFORMANCE END DATE. GATE-INSTALL EV CHARGING STATIONS
PR-VIEQUES NWR-MAINT SHOP 303 REHAB
PR-CULEBRA NWR-QUARTERS 1 REHABILITATION
BUNKHOUSE REHABILITATION
THE PURPOSE OF THIS MODIFICATION IS FOR RIO SABANA ADDITIONAL WORK.
140P4522F0066: REHABILITATE CRITICAL SYSTEMS OF THE SUM BUILDING - PATERSON GREAT FALLS NATIONAL HISTORICAL PARK, PATERSON, NJ
GATE 318201 - ROOFING STABILIZATION FOR ADDITIONAL IN-SCOPE REQUIREMENTS MOD 07 - RFPS 4.5, 4.6, 5.0, 6.0
GATE RIIS PARK - PAINT AND REHAB FLAGPOLES THIS MODIFICATION IS A NO-COST TIME EXTENSION.
GATE-INSTALL EV CHARGING STATIONS
140P4523F0057: REPAIR EXTERIOR OLD MASTIC HOUSE - FIRE ISLAND NATIONAL SEASHORE, PATCHOGUE, NY
MORR FORD MANSION ACCESSIBILITY DRAINAGE: THE CONTRACTOR SHALL COMPLY WITH ALL ASPECTS OF THE STATEMENT OF WORK.
DEWA 251812, RENOVATE RESTROOMS, DELAWARE WATER GAP NATIONAL RECREATION AREA, BUSHKILL, PA AND COLUMBIA, NJ
GATE-INSTALL EV CHARGING STATIONS
PURPOSE OF MODIFICATION: 1) UPDATING CONTRACTING OFFICER FROM M. YATES TO S. PACKARD; 2) ADDING CLAUSE 52.204-27 AS IT'S NOW REQUIRED FOR ALL SOLICITATION AND CONTRACTS EFFECTIVE JUNE 2023; 3) ADDING ASBESTOS ABATEMENT; BOLLARDS; FENCING 4)
GATE-REPAIR BUILDING COMPONENTS AT SAHO MULTIPLE BUILDINGS- THE CONTRACTOR SHALL COMPLY WITH ALL ASPECTS OF THE SOW.
Business Details
- UEI
- ZNDWJV6WGFU9
- CAGE Code
- 65Y98
- Address
- 2780 HAMILTON BLVD
SOUTH PLAINFIELD, NJ 070802516 - Congressional District
- NJ-06
- Phone
- 9083155932
Parent Company
MFS CONSTRUCTION LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov