CHILDS ENGINEERING CORPORATION
BELLINGHAM, MASSACHUSETTS 020191527
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541330 | $12.94M | 69 |
Contract Awards
44 awards found
REPAIR ATON UPPER CHESAPEAKE BAY, AT AIDST TO NAVIGATION TEAM BALTIMORE PER SOW IN ACCORDANCE WITH PARAGRAPH 2(D) IMPLEMENTING THE PRESIDENT'S "DEPARTMENT OF GOVERNMENT EFFICIENCY" COAST EFFICIENCY INITIATIVE FEB 26, 2025.
A/E SERVICES - FY25 DISTRICT 1 CRITICAL AIDS TO NAVIGATION (ATON) STRUCTURE INSPECTIONS, SECTOR SOUTHEASTERN NEW ENGLAND
ADDITIONAL ANALYSIS
WATERFRONT INSPECTION AND ASSESSMENT AT NAVAL SHIPYARD PORTSMOUTH
WATERFRONT INSPECTION AND ASSESSMENT REGION 1, NAVSTA MAYPORT PLEASE SEE SECTION J LIST OF ATTACHMENTS FOR THE SCOPE OF ARCHITECT-ENGINEER SERVICES (SAES).
FULL TERMINATION FOR CONVENIENCE AND DE-OBLIGATE $65,552.10.
WATERFRONT INSPECTION AND ASSESSMENT REGION 1, NSA MECHANICSBURG
THE PURPOSE OF THIS T.O. IS TO PROVIDE AN ENGINEERING ANALYSIS OF THE MATERIAL CONDITION OF ALL ACTIVE NSWCPD SUSTAINED WATERFRONT FACILITIES AT PHILIDELPHIA, PA IN ACCORDANCE WITH THE SAES.
A/E DESIGN RECAP WATERFRONT SECTOR DELAWARE BAY
P00001 PCAS OPTION EXERCISED & FUNDED
FY24 D5 AND D9 WATERFRONT STRUCTURES INSPECTIONS
THE PURPOSE OF THIS MODIFICATION IS TO PERFORM THE ADDED WORK OF REDESIGNING THE UTILITY SYSTEMS (WATER, SEWER, ELECTRIC AND DATA). THE CCD REMAINS THE SAME.
PERFORM A DYNAMIC ANALYSIS ON PIER 17. CONFIRM THE STRENGTH OF T
PIER 15 - GRIPPER & FENDER SYSTEM A&E DESIGN FOR SPUD MOORING NAVAL SUBMARINE BASE NEW LONDON, GROTON CT.
A-E SERVICES: WATERFRONT INSPECTIONS @ NAVSTA, NSA, NOSC
THIS MODIFICATION IS TO CHANGE THE KO TO AMANDA JORDAN, KS TO MARIA DAVILA; PERFORM THE BSA; EXTEND THE POP FROM 1/16/2024 TO 5/6/2024.THIS MODIFICATION CONSTITUTES FULL AND COMPLETE COMPENSATION FOR ALL COSTS AND DELAYS ARISING FROM THIS CHANGE
X007 REVIEW AND REVISE COMPLETED DESIGN - P1097
WFI AT MCB CAMP LEJEUNE, NC
PIER 15 DYNAMIC ANALYSIS FOR HEAVY SEAS NAVAL SUBMARINE BASE NEW LONDON
X007 REVIEW AND REVISE COMPLETED DESIGN - P1097
FY23 WATERFRONT INSPECTIONS D7/D8
THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE THE OPTION FOR CONSTRUCTION PHASE SERVICES AND TO EXTEND THE CONTRACT COMPLETION DATE TO DECEMBER 14, 2023.
FY23 MAJOR ATON INSPECTIONS D7 & D8 PNUM 21537096
INSPECT INDUSTRIAL WHARVES/PIERS AND STA CURTIS BAY PIERS AT USCG BLATIMORE YARD BALTIMORE, MD
POST CONSTRUCTION AWARD SERVICES (PCAS) FOR UNDERWATER ELECTRO-MAGNETIC MEASUREMENT SYSTEM (UEMMS) RELOCATION AT NAVAL SUBMARINE BASE NEW LONDON.
PIER 2 REPAIRS, BERTH 21 - NOAA
A-E SERVICES: WATERFRONT INSPECTIONS AND ASSESSMENT AT US MCAS BEAUFORT AND US MCRD PARRIS ISLAND.
A-E SERVICES: WATERFRONT INSPECTIONS MODIFICATION TO ADD IN-SCOPE EFFORT FOR MOORING HARDWARE PULL TESTING.
WFI AT NAS JACKSONVILLE, FL
WFI AT MFR NEW ORLEANS : BROOKLYN, NY
WFI AT NAVSTA MAYPORT
DESIGN SERVICES TO UPGRADE ROCK HARBOR ISLAND DOCK ON ISLE ROYALE NATIONAL PARK. MODIFICATION TO DEOBLIGATE UNUSED TRAVEL FUNDING AND REDUCE THE TOTAL VALUE OF THE PURCHASE ORDER IN PREPARATION FOR CLOSEOUT.
THE PURPOSE OF THIS MODIFICATION IS TO MAKE IN-SCOPE CHANGES FOR ADDITIONAL WORK DUE TO UNFORESEEN SITE CONDITION. CONTRACTOR SHALL PERFORM ADDED DESIGN WORK FOR A NEW PUMP STATION FOR EAGLE IAW ATTACHMENT NO. 1. CCD IS EXTENDED TO 12-31-2023.
PERFORM ALL A-E SERVICES THAT ARE REQUIRED FOR WATERFRONT INSPECTIONS
PERFORM ALL A-E SERVICES THAT ARE REQUIRED FOR WATERFRONT INSPECTIONS
AE SERVICES FOR REPAIR OF CONCRETE PIER AT U.S. COAST GUARD SECTOR DETROIT DETROIT, MI
PIER 15 DYNAMIC ANALYSIS STUDY, NAVAL SUBMARINE BASE NEW LONDON, GROTON CT, 06349
P-1097
FY22 MAJOR AIDS TO NAVIGATION INSPECTIONS @ USCG OFFSHORE AND INLAND SITES
CHANGE ACCOUNTING LINE TASK CODE FROM 22PROJEXEC TO 22PROFSD
A-E SERVICES: WATERFRONT FACILITIES INSPECTION AND ASSESSMENT AT SUBASE NEW LONDON, CT.
THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE ENGINEERING LOAD RATING ANALYSIS SERVICES TO DETERMINE IF THE NEW FOUR AXLE TRANSPORTER CAN BE SUPPORTED OVER THE CURRENT THREE AXLE TRANSPORTER.
THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE AN ENGINEERING ANALYSIS OF THE MATERIAL CONDITION OF ALL ACTIVE WATERFRONT FACILITIES AT NUWC SENECA LAKE, NY
FY22 WATERFRONT INSPECTIONS
Business Details
- UEI
- ZMGLVGCKMDA3
- CAGE Code
- 5L893
- Address
- 34 WILLIAMS WAY
BELLINGHAM, MA 020191527 - Congressional District
- MA-04
- Phone
- 5089669092
Parent Company
CHILDS ENGINEERING CORPORATION
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov