MX CONSTRUCTION, INC.
NIPOMO, CALIFORNIA 934445626
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 237130 | $11.66M | 14 |
| 236220 | $8.01M | 26 |
| 238220 | $6.36M | 11 |
| 236210 | $4.26M | 3 |
| 238910 | $3.33M | 2 |
| 238210 | $1.80M | 6 |
| 238320 | $503K | 12 |
| 238290 | $294K | 2 |
| 221310 | $235K | 10 |
| 238990 | $204K | 3 |
Contract Awards
50 awards found
N6247325D2609 MINIMUM GUARANTEE TASK ORDER
CORROSION CONTROL AND PROTECTIVE PAINT
DDJC TRACY W-16 COLUMN REPAIRS
DEMOLITION OF BUILDINGS 886/887/888
PROVIDE PS200 GALVANIZED UNISTRUT BEAM CLAMPS, AND 12-GA HANGAR WIRES AT 48-INCHES ON CENTER BETWEEN EXISTING I-BEAMS TO SUSPEND NEW T-BAR CEILING SYSTEM. CONTRACT PRICE INCREASED BY $21,323.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED.
W912PL24C0021 B1819 ADMIN RENO-MDA (MX) MODIFICATION NO. R00004 - FURR OUT CMU WALLS ROOMS 102,103,105. TOTAL CONTRACT PRICE INCREASED BY $12,941.06.THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
B1819 ADMIN RENOVATION W912PL24C0021 B1819 ADMIN RENO-MDA (MX) MODIFICATION NO. R00003 - INFILL 2ND FLOOR HVAC DUCT PENETRATIONS. TOTAL CONTRACT PRICE INCREASED BY $22,330.93. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
PROVIDE A CREDIT FOR CHANGING THE DRYWALL FINISHES REQUIRED IN SPECIFICATION SECTION 09 29 00, PARAGRAPH 3.3, FROM A LEVEL 5 FINISH TO A LEVEL 3 FINISH. PRICE IS DECREASED BY $6,481.72. CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MOD.
CONTRACT FOR B1819 ADMIN RENO MDA (MX) AT VANDENBERG SFB, CA REFERENCE NO. R00001 WC002 LOBBY AND CORRIDOR TOTAL CONTRACT PRICE IS INCREASED BY $142,276.97. CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION
CONSTRUCTION, SWWTF
THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, PERSONNEL, VEHICLES, EQUIPMENT, TOOLS, PARTS, MATERIALS, SUPPLIES, LABOR, PLANS, AND OTHER ITEMS AND SERVICES NECESSARY TO PERFORM CORROSION CONTROL AND PROTECTIVE COATINGS IAW THE STATEMENT OF WORK.
DEMO CANNISTER ERECTION STRUCTURE, AND BACK FILL, VSFB, CA
B236 GAS VALVES REPLACEMENT
B702 REPAIR MAIN ELECTRICAL SERVICE
THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, PERSONNEL, VEHICLES, EQUIPMENT, TOOLS, PARTS, MATERIALS, SUPPLIES, LABOR, PLANS, AND OTHER ITEMS AND SERVICES NECESSARY TO PERFORM CORROSION CONTROL AND PROTECTIVE COATINGS IAW THE STATEMENT OF WORK.
THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, PERSONNEL, VEHICLES, EQUIPMENT, TOOLS, PARTS, MATERIALS, SUPPLIES, LABOR, PLANS, AND OTHER ITEMS AND SERVICES NECESSARY TO PERFORM CORROSION CONTROL AND PROTECTIVE COATINGS IAW THE STATEMENT OF WORK.
DEOB OF UNUSED FUNDS
THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, PERSONNEL, VEHICLES, EQUIPMENT, TOOLS, PARTS, MATERIALS, SUPPLIES, LABOR, PLANS, AND OTHER ITEMS AND SERVICES NECESSARY TO PERFORM CORROSION CONTROL AND PROTECTIVE COATINGS IAW THE STATEMENT OF WORK.
B1819 ELECTRICAL UPGRADE R00003 RELAY BACKUP AND CYBER SECURITY WC003 CONTRACT SHALL BE INCREASED BY $95,525.70. CONTRACT DURATION IS UNCHANGED.
B702 (UNFO) HVAC DUCTWORK
THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, PERSONNEL, VEHICLES, EQUIPMENT, TOOLS, PARTS, MATERIALS, SUPPLIES, LABOR, PLANS, AND OTHER ITEMS AND SERVICES NECESSARY TO PERFORM CORROSION CONTROL AND PROTECTIVE COATINGS IAW THE STATEMENT OF WORK.
CLIN 0001 FY24 NSWC B575 ELECTRICAL MODE
CONTRACT FOR LACDA SANTE FE DAM ELECTRICAL MODERNIZATION. REFNO.R00002 SS002 REPLACE 2" ELECTRICAL CONDUIT. TOTAL CONTRACT PRICE IS INCREASED BY $22,500.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
8510882833!OTHER WAREHOUSE BUILDINGS, RE
8510862834!LIGHTING FIXTURES WAREHOUSES
B1819 ADMIN RENOVATION
REHABILITATE KELSO DEPOT HVAC AND WATER HEATING SYSTEMS, MOJAVE NATIONAL PRESERVE
CONTRACT FOR MDS B1819 ELECTRICAL AT VSFB,CA. REFNO.R00001 WC001 COORDINATION STUDY MATERIALS. TOTAL CONTRACT PRICE IS INCREASED BY $144,475.40. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CAMP PARKS GENERATOR CONSTRUCTION
DESIGN BID BUILD CONSTRUCTION OF BACKUP GENERATOR FOR THE ARMY SCHOOL SYSTEM BUILDING 517 OF CAMP PARKS IN DUBLIN, CALIFORNIA, AND MANUAL TRANSFER SWITCHES TO FORT HUNTER LIGGETT, IN JOLON, CALIFORNIA.
MOD TO ADD WORK AND PARTS TO REPAIR A.C. IN BLDG 3360 AT FHL.
MAIDIQ FIVE YEAR CONTRACT - MINIMUM GUARANTEE
BASE (FFP) B448 BATTERY AND CABINET REPLACEMENT
LOS ANGELES COUNTY DRAINAGE AREA (LACDA) SANTA FE DAM ELECTRICAL MODERNIZATION AT LOS ANGELES COUNTY, CALIFORNIA
PICKLEBALL COURTS
DENTAL CLINIC FLOORING, B220, NSA MONTEREY
USDA-WRRC ELECTRICAL UPGRADE DISHWASHER, AUTOCLAVES, STEAM GENERATOR INSTALLATION.
UNFORESEEN WITHIN SCOPE - DB REPAIR FIRE PROTECTION SYSTEMS
THIS MODIFICATION ADDS ADDITIONAL REQUIRED PARTS TO RESTORE FUNCTIONALITY TO FHL A/C SYSTEMS
B1819 ELECTRICAL UPGRADE
MODIFICATION TO BUY ADDITIONAL REQUIRED PARTS AND INSTALL TEMPORARY A/C IN BLDG 3000, 3012, & 3020.
MAINTENANCE, REPAIR, DIAGNOSTICS
B702 HVAC
DIAGNOSIS AND REPAIR OF A/C AT FHL BUILDINGS A-E AND 3360.
B234 HIGH VOLTAGE SWITCH AND TRANSFORMERS
R3/A2 INCREASE TANK COVER SIZE
CONTRACTFOR FY20 MMG B8145 RELOCATE EQUIPMENT.REF.NO.R00001 WC001 CODE COMPLIANCE ELECTRICAL OPERABILITY.TOTALCONTRACT PRICE IS INCREASED BY $19,562.22.THECONTRACT COMPLETION DATE SHALL BE EXTENDED BY 120 CALENDAR DAYS BY REASON OF THIS MODIFICATION.
FACILITY 14410, REPAIR ARMY AND AIR FORCE EXCHANGE SERVICE BRINE LINE GAS LEAK
FALL PROTECTION AND ROOF REPAIRS
ABA SWING GATE INSTALLATION
Business Details
- UEI
- Z1L4N6APMQA6
- CAGE Code
- 7BWH6
- Address
- 720 SOUTH FRONTAGE ROAD, SUITE 106
STE 106
NIPOMO, CA 934445626 - Congressional District
- CA-24
- Phone
- 8057235201
Parent Company
MX CONSTRUCTION, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov