RMF ENGINEERING, INC., P.C.
CATONSVILLE, MARYLAND 212284865
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541330 | $33.87M | 269 |
| 541310 | $-568,871.5 | 5 |
Contract Awards
50 awards found
C201611 - DEVELOP AND DESIGN A COMPREHENSIVE CODE-COMPLIANT SOLUTION THAT SEAMLESSLY INTEGRATES FIRE ALARM DETECTION, NOTIFICATION, AND CONTROL SYSTEMS INTO A UNIFIED PLATFORM - ELIZABETH OLUWAFEMI
C105559 - THIS MODIFICATION PROVIDES ADDITIONAL A/E CGMP SERVICES.
STEAM SERVICE CONSULTATION
C116130 - 15% SCHEMATIC DESIGN SERVICES, INCLUDING A PRELIMINARY AND PROFESSIONAL COST ESTIMATE FOR NIH BUILDING 21 IN BETHESDA, MD.
C107641 - THE REASON FOR THIS MODIFICATION IS TO ADD ENVELOPE COMMISSIONING SERVICES TO ENSURE A COMPLIANT USABLE FACILITY.
C112535 BLDGS 8 8A REPLACE REHEAT TERMINAL UNITS (PHASE 01) COMMISSIONING SERVICES
C108793 - PCAS REPLACE CHILLED WATER VERTICAL RISERS, BLDG. 10 - ACRF NEW CONTRACT ACTION FOR POST DESIGN
THIS AWARD IS TO PROCURE COMMISSIONING SERVICES FOR THE RENOVATION OF BUILDING 37 AT PORT ISABEL DETENTION CENTER.
C201565 - A STUDY OF EXISTING CONDITIONS WITH ANALYSIS TO DETERMINE THE MOST FEASIBLE APPROACH TO SUPPORT THE BLDG.62 WITH CENTRAL UTILITY SYSTEM FROM THE CENTRAL UTILITY DISTRIBUTION TUNNEL - MOHAMMED BISWAS
C112358 - BLDG. 10B ACRF PARKING GARAGE ASSESSMENT
C104573 - THIS AWARD IS ESSENTIAL TO PROVIDE POST DESIGN SERVICES FOR STEAM AND CHILLED WATER LINE REPLACEMENTS FROM VALVE VAULT 2 TO VALVE 2 VAULT 31C TO OPTIMIZE EFFICIENCY AND RELIABILITY TO PRODUCE AND DISTRIBUTE STEAM TO THE NIH BETHESDA CAMPUS.
C115324 AWARD IS ESSENTIAL FOR DESIGN SRVCS TO INSTALL NEW FEEDERS TO BLDG 101. THE CURRENT CONFIGURATION ON CAMPUS DOES NOT SUPPORT FULL REDUNDANCY TO THE NORTH CAMPUS ELECTRIC INFRASTRUCTURE, ENDANGERING ANIMAL HEALTHCARE AND RESEARCH ACTIVITIES.
C116120 BLDG 50 GENERAL EXHAUST UPGRADES
C104565- THE CONTRACT ACTION IS ESSENTIAL TO PROVIDE A DESIGN REFRESH FOR REPAIR AND REPLACEMENT OF AHUS #1,2,&3 IN BLDG 31A TO ENSURE THE FACILITY REMAINS COMPLIANT WITH ALL SAFETY, REGULATORY, AND FUNCTIONAL SPECIFICATIONS.
THIS MOD INCLUDES CONSTRUCTION SEQUENCING WHICH IS NECESSARY TO MINIMIZE THE IMPACT ON HOSPITAL & RESEARCH LABORATORIES. IT ADDS HMI THAT ELIMINATES LIFE-SAFETY RISK. WITHOUT THIS CHANGE, IT WILL NOT BE COMPLETE AND USABLE TO SUPPORT THE MISSION.
C107469 - PROVIDE ALL LABOR, SUPERVISION AND MATERIAL TO PROVIDE CQM AND CX SERVICES FOR THE BASE AND OPTION YEAR 1 FOR THE ELECTRICAL UPGRADE PROJECT PER THE STATEMENT OF WORK (SOW) DATED: 01/09/2025
THE REASON FOR THIS MOD. IS TO INCLUDE ADDITIONAL CONSTRUCTION QUALITY MANAGEMENT SERVICES. THE CONTRACT ACTION IS ESSENTIAL TO PROCUREMENT AND ALLOWED TO PROCEED AS CONSTRUCTION CHANGE ODER. IT WOULD NOT BE COMPLETE AND USABLE WITHOUT THIS MOD.
UPDATE THE INVOICE INSTRUCTIONS AND INVOICE ADDRESS CODE TO REQUIRE THE USE OF THE DEPARTMENT OF THE TREASURY'S ONLINE INVOICE PROCESSING PLATFORM (IPP) FOR ERBIL NCC PROJECT.
C115560-QA/QC SERVICES FOR VFD REPLACEMENT CO: CHRIS POSTEK COR: VANESSA ARGOTE MACIA
TO CANCEL CONTRACT AWARDED IN ERROR FOR C102867 - TASK ORDER - SECURITY ENHANCEMENTS - FEASIBILITY STUDY REPORT OF THE INSTALLATION OF INTERNAL SECURITY CAMERAS IN THE BUILDING 11 - HHSN292201500004I - MARTY HAGHJOU
UPDATE THE INVOICE INSTRUCTIONS AND INVOICE ADDRESS CODE TO REQUIRE THE USE OF THE DEPARTMENT OF THE TREASURY'S ONLINE INVOICE PROCESSING PLATFORM (IPP)
C103498 - ROCKLEDGE AND NHLBI PROJECT MANAGEMENT SUPPORT SERVICES. COST MOD TO EXTEND POP TO 9/30/25 WITH INCREASED LEVEL OF EFFORT. CO: ZACH PRICE CS: BRAD ARENSDORF COR: WOODY INSCOE PAST PERFORMANCE POC: STEVE O'REILLY
C200863 - FEASIBILITY STUDY, BLDG 11 (CUP) CONSOLIDATED COOLING TOWER (CT) BLOWDOWN TO SANITARY SEWER SYSTEM - HAITAO MA
THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE FUNDING FOR THE DESIGN SITE SUPPORT WELLINGTON CX PROJECT LOCATED IN NEW ZEALAND.
C116492 - CONTRACT AE PEER REVIEWS, LOGIC DIAGRAMS, CX/BAS SUPPORT, RCA FOR INTRAMURAL PROJECTS - BASE PERIOD - JORDAN BLACKBURN
C105672 - PROVIDE ALL WORK AND LABOR AND MATERIALS FOR CQM SERVICES OF ELECTRICAL SWITCHING STATION 57 CS: BRAD ARENSDORF CO: ZACH PRICE COR: SAM SERAJ
C103025 - BRIDGING DOCUMENTS FOR THE VENTILATION SYSTEM AT THE CUP, BUILDING 13
THIS TASK ORDER ENGAGES SPECIALIZED ENGINEERS TO INVESTIGATE AND PROVIDE SOLUTIONS TO OPERATIONAL ISSUES WITH TWO HIGH-EFFICIENCY SIDE STREAM FILTERS PURCHASED BY THE GOVERNMENT/NIH IN 2023, WHICH HAVE CAUSED BACTERIAL GROWTH AND WATER SYSTEM CONTAMI
C200282 -PROVIDE A DESIGN CONTRACT FOR MEP SERVICES TO DESIGN OF THE CHILLED WATER, ELECTRICAL, AND MECHANICAL UTILITIES FOR A NEW HELIUM COMPRESSOR IN THE NMR CENTER TO ACCOMMODATE THE FUTURE INSTALLED EQUIPMENT, CONSIDERING EXISTING EQUIP
C100234 - CENTRAL BOILER PLANT CONTROLS (BOILER 5)
UPDATE THE INVOICE INSTRUCTIONS AND INVOICE ADDRESS CODE TO REQUIRE THE USE OF THE DEPARTMENT OF THE TREASURY'S ONLINE INVOICE PROCESSING PLATFORM (IPP).
C115560-QA/QC SERVICES FOR VFD REPLACEMENT CS: BRAD ARENSDORF CO: ZACH PRICE COR: VANESSA ARGOTE MACIA
TASK 7 - CX SUPPORT FOR ECB4
C103498 - ROCKLEDGE AND NHLBI PROJECT MANAGEMENT SUPPORT SERVICES. CO: ZACH PRICE CS: BRAD ARENSDORF COR: JAY HULL PAST PERFORMANCE POC: STEVE O'REILLY
C102579- P00008 ADDITIONAL SERVICE CQM SERVICES FOR CUP CHILLER REPLACEMENT
C116662 CC BLDG 10 2C324 SITE PREP ROCHE COBAS PRO AND C6000 SOLUTIONS ANALYZER CS: CHRIS HSU CO: ZACH PRICE COR: JOE PARELLO
C107062-(REQ 6067309) - POST-DESIGN SERVICES FOR BIDDING AND NEGOTIATIONS SUPPORT AND OTHER TYPICAL CONSTRUCTION ADMINISTRATION SUPPORT SERVICES
C200313 UPS ROOM ENCLOSURE 100% DESIGN
CHANGE FOR ADDITIONAL DESIGN SERVICES.
C200558 BUILDING 33 HIGH CONTAINMENT GAP ANALYSIS PROJECT COR: KANIKA SHARMA
C200282 -PROVIDE A DESIGN CONTRACT FOR MEP SERVICES TO DESIGN OF THE CHILLED WATER, ELECTRICAL, AND MECHANICAL UTILITIES FOR A NEW HELIUM COMPRESSOR IN THE NMR CENTER TO ACCOMMODATE THE FUTURE INSTALLED EQUIPMENT, CONSIDERING EXISTING EQUIP
C106708 - CA/CQM - PROVIDE ALL LABOR AND SUPERVISION FOR THE BOILER FEEDWATER PUMP REPLACEMENT , BLDG 11, VANESSA ARGOTE MACIA
C115933- POST DESIGN SERVICES FOR 12 E CGMP UPS POWER- ASHISH PANDIT- PERIOD OF PERFORMANCE 9/30/2024- 12/29/2025
C104044 - ARCHITECT/ENGINEERING CONSTRUCTION SERVICES - REFRIGERANT MONITORING, BLDG 11
COMMISSIONING SERVICES TO PERFORM REVIEWS FOR PORT LOUIS NEC BRIDGING DESIGN DOCUMENTS.
C112358 - BLDG. 10B ACRF PARKING GARAGE ASSESSMENT CS: BRAD ARENSDORF COR: LENIN ANDRADE CO: LINDA LIU
AE C104550 DESCRIPTION - BASE AE SERVICES TO AWARD IN AID OF REPLACING OBSOLETE CIRCUIT BREAKER TRIP UNITS IN BUILDING 10 CO - DAVE SEID COR - ASHISH PANDIT VENDOR POC - DUSTIN BARRALL
C116662 CC BLDG 10 2C324 SITE PREP ROCHE COBAS PRO AND C6000 SOLUTIONS ANALYZER CS: CHRIS HSU CO: ZACH PRICE COR: JOE PARELLO
C116171 CQM & CX IN SUPPORT OF BUILDING 1, ROOM 323, 327 & 327A SECURE AREA CS: CHRIS HSU CO: ZACH PRICE COR: WOODY INSCOE
BELTSVILLE AREA RESEARCH CENTER (BARC) STEAM SYSTEM CONSTRUCTION DOCUMENTS AND CONSTRUCTION ADMINISTRATION. BELTSVILLE, MD
Business Details
- UEI
- Y7YJFTG997E7
- CAGE Code
- 0FRJ3
- Address
- 5520 RESEARCH PK DR STE 300
CATONSVILLE, MD 212284865 - Congressional District
- MD-07
- Phone
- 4105760505
Parent Company
RMF ENGINEERING, INC., P.C.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov