YOY INC
DBA: VERDIS
COEUR D ALENE, IDAHO 838158395
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 237990 | $4.00M | 9 |
| 236220 | $2.90M | 72 |
| 237310 | $2.15M | 11 |
| 238210 | $1.57M | 7 |
| 238220 | $1.28M | 12 |
| 237130 | $766K | 4 |
| 236210 | $711K | 1 |
| 541330 | $701K | 8 |
| 238910 | $539K | 5 |
| 562910 | $459K | 5 |
Contract Awards
50 awards found
REGION 4 MULTI-TRADE FACILITIES CONSTRUCTION, REPAIR, AND REMODEL MATOC IDIQ MINIMUM GUARANTEE TASK ORDER THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE CONTRACTING OFFICER FROM AMELIA VELASCO TO TANYA SPANFELLNER. THIS CONTRACT IS HEREBY MODIFIE
REPLACEMENT OF SEPTIC DRAIN FIELD TO ACCOMMODATE INCREASED STAFF IN BUILDING 103 AND ADDRESS LONG-STANDING ISSUES WITH SEWAGE BACKING UP. EXCAVATE AND INSTALL A DRAIN FIELD IN COMPLIANCE WITH WHITMAN COUNTY HEALTH DEPARTMENT SOIL TEST EVALUATION.
FABRICATION AND INSTALLATION OF A NEW VAULT TOILET AT THE GOLD HILL TRAIL HEAD.
DENA - REPLACE BACKUP GENERATOR
EAST LEWISTON LEVEE AREA 380 APRON CLEAN OFF
REMOVE AND REPLACE EXISTING CHILLER
DHS CBP DESIGN BUILD CONSTRUCTION SERVICES FOR A NEW K-9 KENNEL AT THE LUKEVILLE AZ LPOE. THIS MODIFICATION IS TO ADD FUNDS FOR THE A PEDESTRIAN BRIDGE FOR SAFELY EXITING THE BACK OF THE KENNEL AND IDS, DOOR CONTROLS
SMOKEJUMPER LOFT FIRE RECOVERY BUILDING RECONSTRUCTION REPAIRS PER ATTACHED SOW, DRAWINGS, SPECIFICATIONS AND CONTRACT CLAUSES. WORK INCLUDES INTERIOR REFINISHING WORK, HVAC, AND ELECTRICAL. SBA REQUIREMENT NUMBER FOR THIS 8(A) AWARD: WG1731958082
MAR TOWER
STOP WORK REA FOR PUMPING CONTRACT F OR AFD PRIEST RIVER PAVING PROJECT AT PRIEST RIVER, ID REFERENCE NO. R00003
REMOVE AND REPLACE EXISTING CHILLER
COEUR D'ALENE DISPATCH OFFICE REORGANIZATION
INRC PARKING LOT SEALING/RESTRIPING.
SEE SECTION C
REPLACE OVERHEAD DOORS, CENTRAL FERRY ELECTRICAL, AND SCREENHOUSE REPAIRS
DWA DENT ACRES & LLA LEWISTON LEVIES REPAVING
CONTRACT FOR AFD PRIEST RIVER PAVING PROJECT AT PRIEST RIVER, ID. REFERENCE NO. R00002 SP002 SUBGRADE REPAIRS
FY24 ELECTRICAL SURVEY
CONTRACT FOR AFD PRIEST RIVER PAVING PROJECT AT PRIEST RIVER, ID. REFERENCE NO. R00001 SP001 DUMP STATION ASPHALT
EXERCISING OPTION YEAR 3
INSTALLATION OF ELECTRIC VEHICLE SUPPLY EQUIPMENT FOR ARIZONA LAND PORTS OF ENTRY - LPOES AT MARIPOSA AND SAN LUIS II
TO DE-OBLIGATE UNUSED FUNDS IN CLIN 0002 AND CLIN 0005
GREENHOUSE HEATERS, COEUR D'ALENE NURSERY, IDAHO PANHANDLE NATIONAL FORESTS
INSTALL COVERED WALKWAY 8510 US-2 SPOKANE, WA 99224-6164
MODIFICATION 0002 TO THE MINIMUM GUARANTEE -- WAS SATISFIED BY THE FIRST TASK ORDER ISSUANCE CO, BY TONY TAYLOR IN SEPTEMBER 2023. THIS WILL SATISFY THE GOVERNMENTS GUARANTEED TO THE VENDOR UNDER THE TERMS OF THE ORIGINAL IDIQ REQUIREMENT.
GAOA- R4 FACILITIES MATOC THIS PROJECT INCLUDES WORK TO PREVENT WATER INFILTRATION, REPAIR WATER DAMAGE, AND RESTORE THE BALD MOUNTAIN LOOKOUT ON THE KETCHUM DISTRICT OF THE SAWTOOTH NATIONAL FOREST A. THE WORK INCLUDES THE FOLLOWING WORK ITEMS
REMOVE EXISTING SMOLT RELEASE PIPE & REPLACE.
CLIN 0002 - FULL REPLACEMENT OF CAMPGROU
SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE, 30 DAY CONTRACT EXTENSION TO 11/5/2023.
CROSS CONNECTION SURVEY
PORT OF BENTON SILL CAP REPAIR
REPLACE BACKUP GENERATOR
THIS PROJECT CONSISTS OF STORING A TOTAL OF 2630 LINEAR FEET (APPROXIMATELY 0.5 MILE) OF ROAD ON FOREST SERVICE ROAD 4505.
REPAIRS CRACKS AND SPALLS ON THE PLAZA AT THE THOMAS FOLEY COURTHOUSE IN SPOKANE, WASHINGTON.
GRAFFITI REMOVAL FROM RETAINING WALL - EUGENE, OR
EXERCISING OPTION YEAR 2
GAOA- R4 FACILITIES MATOC THIS PROJECT INCLUDES WORK TO PREVENT WATER INFILTRATION, REPAIR WATER DAMAGE, AND RESTORE THE BALD MOUNTAIN LOOKOUT ON THE KETCHUM DISTRICT OF THE SAWTOOTH NATIONAL FOREST A. THE WORK INCLUDES THE FOLLOWING WORK ITEMS
LLA/LGA ANCHOR CONCRETE DEMO/REMOVAL
FY23 ETOC - REPLACEMENT OF PLAYGROUNDS AT WARRIOR PARK.
FY23 ETOC - SELECTIVE DEMO AT MILLER PARK FAIRCHILD AIR FORCE BASE, WASHINGTON
REPLACE DRINKING FOUNTAINS IN RICHLAND, WA SPOKANE, WA AND LEWISTON, ID.
CONSTRUCTION SERVICES TO BUILD-OUT A NEW OFFICE SPACE FOR SENATOR MURRAY'S STAFF AT THE THOMAS S. FOLEY U.S. COURTHOUSE IN SPOKANE, WA.
STAIRS, DRAIN, AND CURB CHANGES
FY23 ETOC - SEED PROJECT
FY23 ETOC - ORIENTATION SEMINAR
ELECTRIC VEHICLE SUPPLY EQUIPMENT FOR AZ LPOES - AT MARIPOSA, 200 N MARIPOSA RD., NOGALES, AZ 85621-2429, AND SAN LUIS II, 1375 SOUTH AVENUE E, SAN LUIS, AZ 85349
THE PURPOSE OF THIS PROJECT IS TO DISSIPATE HEAT FROM THE TWO (2) AIR COMPRESSORS LOCATED IN THE NORTH-WEST CORNER OF THE BOILER ROOM.
REPLACE ROOFTOP HVAC UNIT AT TWF AIR TRAFFIC CONTROL TOWER IN TWIN FALLS, ID
MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR DESIGN-BUILD CONSTRUCTION SERVICES FOR THE DEPARTMENT OF INTERIOR AND FOREST SERVICE
GAOA- R4 FACILITIES MATOC THIS PROJECT INCLUDES WORK TO PREVENT WATER INFILTRATION, REPAIR WATER DAMAGE, AND RESTORE THE BALD MOUNTAIN LOOKOUT ON THE KETCHUM DISTRICT OF THE SAWTOOTH NATIONAL FOREST A. THE WORK INCLUDES THE FOLLOWING WORK ITEMS
Business Details
- UEI
- Y4CBP2VLNQC7
- CAGE Code
- 6A1F9
- Address
- 3906 N SCHREIBER WAY
COEUR D ALENE, ID 838158395 - Congressional District
- ID-01
- Phone
- 2086671214
Parent Company
YOY INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov