ENVIRONMENTAL COST MANAGEMENT, INC.
DBA: ENVIRONMENTAL COST MANAGEMENT
COSTA MESA, CALIFORNIA 926261480
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 562910 | $4.37M | 96 |
| 541620 | $2.16M | 75 |
| 541330 | $500 | 5 |
Contract Awards
50 awards found
FUNDING FOR OPTIONS ON WATER SAMPLING AND RISK EVALUATION FOR CONTAMINATED SOIL AND WATER AT THE CLEAR CREEK SHOOTING RANGE FROM 12443924F0033.
20 - CON - REGIONAL WATER SYSTEM PFAS TESTING BASE YEAR FOR REGION 5 (R5) ENVIRONMENTAL SITE INVESTIGATION AND CLEANUP MULTIPLE AWARD IDIQ (NON-CERCLA) (1 OF 2) NRE-3302 DOGE APPROVED WILL LOSE FUNDING IF NOT AWARDED FY 25
PREPARATION OF A PRELIMINARY ASSESSMENT /SITE INSPECTION (PA/SI) REPORT FOR MINES LOCATED IN THE CAVE CREEK RANGER DISTRICT OF THE TONTO NATIONAL FOREST, IN YAVAPAI COUNTY, ARIZONA. THE TASKS ARE OUTLINED IN THIS STATEMENT OF WORK. TASKS INCLUDE
GROUNDWATER MONITORING - EXERCISE OPTION YEAR 3
THIS IS FOR A BASE PLUS FOUR OPTION YEAR CONTRACT
RED MOUNTAIN MINES EECA INCORRECT UEI NUMBER CORRECTION- TO REPLACE 127EAU25P0013. NRE-0495 P0013 WAS DE OBLIGATED PER INSTRUCTION OF KAREN HUNT FINANCIAL ANALYST, AND REPLACED BY NEW REQUISITION. THE INCORRECT UEI ON THE TO IS: CKRMJU7MD296, AND TH
VERIFICATION OF RISK AT AML SITES
THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, TRANSPORTATION, PERMITS, TESTING AND INCIDENTALS NECESSARY FOR THE PERFORMANCE OF THE TASKS SPECIFIED IN THIS STATEMENT OF WORK. IN THIS SOW, THE PROJECT CONSISTS OF THE HERMITS PEAK/CALF CANYON RE
THIS IS FOR A BASE PLUS FOUR OPTION YEAR CONTRACT
SHUREE PONDS SITE MONITORING CERCLA ENVIRONMENTAL SERVICES IDIQ
BPA CALL ESS FINALIZE AA EE/CA 2023 IAW STATEMENT OF WORK
CORONADO NATIONAL FOREST SOLDIER BASON MINES IDIQ-TASK ORDER PURPOSE OF MODIFICATION: A. TO CHANGE THE CONTRACTING OFFICER FROM BRANDON JONES TO MARIA DE LA LUZ PINO. ALL FURTHER COMMUNICATIONS MUST GO TO, AND NEW ACTIONS MUST BE SIGNED BY MARIA
THIS IS FOR A BASE PLUS FOUR OPTION YEAR CONTRACT
MINIMUM GUARANTEE TASK ORDER FOR ASSOCIATED SEAPORT NXG MAC AWARD.
AACC MINE ENVIRONMENTAL REMEDIATION
ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) SMALL BUSINESS MULTIPLE AGENCY CONTRACT (MAC)
RED MOUNTAIN MINES PRP SEARCH
WALKER MINE 5-YEAR TAILINGS WATER QUALITY MONITORING
POST FIRE BAER HAZMAT REMOVAL
MOD-RIPARIAN RESTORATION IN THE FFO PLAN
VERIFICATION OF RISK AT AML SITES
MOD P00001: POP END DATE EXTENSION AND ADDITIONAL ASBESTOS CLEANUP THE CHANTRY PHASE 1 AND 2 HAZARDOUS WASTE, DEBRIS AND ASH REMOVAL AND DISPOSAL PROJECT IS A COMPETITIVE TO UNDER THE R5 NON-CERCLA ENVIRONMENTAL SITE INVESTIGATION AND CLEAN-UP IDI
CONDUCT A COMPREHENSIVE METADATA ANALYSIS OF BIOLOGICAL AND SOIL DATA FROM 13 CONTAMINATED SITES AT JOSHUA TREE NP FOR USE IN FUTURE ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) REPORTS. MOD 1 ADDS RELATED ANALYSES TO RESOLVE EXISTING DATA GAPS.
SIERRA VISTA MINES PASI
FOREST SERVICE, SOUTHERN REGION ENVIRONMENTAL CONSULTING SERVICES BPA
GROUNDWATER MONITORING - EXERCISE OPTION YEAR 2
CARPENTER MINES EE/CA SW REGIONAL OFFICE ENGINEERING GILA NF
BPA CALL ESS FINALIZE AA EE/CA 2023 IAW STATEMENT OF WORK
2024 CORONADO NF WRIGHTSON MINES EE/CA
THIS IS FOR A BASE PLUS FOUR OPTION YEAR CONTRACT
THE PURPOSE OF THIS MODIFICATION IS TOO DE-OBLIGATE THE REMAINING FUNDS IN ORDER TO FACILITATE THE CONTRACT CLOSEOUT. THE FOLLOWING SHOW THE ASSOCIATED LINE ITEMS THAT ARE EFFECTED: LINE ITEM 0001: REMAINING $772.78 TO BE DE-OBLIGATED; LINE ITEM
CASELTON RI/FS PROJECT
THIS TASK ORDER IS BEING ISSUED UNDER ACTIVITY I- (NON-CERCLA SITE INVESTIGATION, CLEANUP AND RESTORATION) OF THE FOREST SERVICE REGION 5 ENVIRONMENTAL SITE INVESTIGATION AND CLEANUP INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT (12970223D0
SOLDIER BASIN MINES POTENTIALLY RESPONSIBLE PARTY SEARCH
SHUREE PONDS SITE MONITORING TASK 1 SAMPLING AND ANALYSIS (INCLUDING MOBILIZATION): $30,276.68 TASK 2 MONITORING REPORT: $13,309.00
REGION 3 CERCLA ENVIRONMENTAL SERVICES IDIQ RISK ASSESSMENT - GALLINAS CANYON HPCC PROJECT
P00001 - CHANGE ORDER MODIFICATION INCLUDES CHANGE REQUESTS 01-03 AND TO EXTEND PERIOD OF PERFORMANCE 60 DAYS TO COMPLETE ADDITIONAL WORK AND REPORTS.
THE WALKER TAILINGS DAM SPILLWAY REMEDIAL DESIGN PLAN PROJECT IS A COMPETITIVE TO UNDER THE R5 ENVIRONMENTAL RESPONSE IDIQ (CERCLA UNDER FOLLOW-ON MAS 12970223D0017), ACTIVITY V, IN SUPPORT OF THE ONGOING REMEDIAL ACTION AT THE WALKER MINE TAILINGS S
ADMIN MOD CORRECTION FOR POP EXTENSION
THIS TASK ORDER IS BEING ISSUED UNDER ACTIVITY I- (NON-CERCLA SITE INVESTIGATION, CLEANUP AND RESTORATION) OF THE FOREST SERVICE REGION 5 ENVIRONMENTAL SITE INVESTIGATION AND CLEANUP INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT (12970223D0
THIS PROJECT IS A COMPETITIVE TASK ORDER UNDER THE REGIONAL ENVIRONMENTAL SITE INVESTIGATION &CLEANUP IDIQ ON THE ANGELES NATIONAL FOREST FOR THE DEMOLITION AND REMOVAL OF FIRE RETARDANT AND WATER TANKS.
THE REGION 5 CERCLA ENVIRONMENTAL RESPONSE IDIQ IS A MULTI-AWARD SERVICE CONTRACT FOR CONTAMINATED SITE ENVIRONMENTAL RESPONSE SERVICES. THESE ACTIVITIES INCLUDE EXECUTION OF VARIOUS EVALUATIONS, STUDIES, AND REPORTS AS SPECIFIED IN THE NCP FOUND IN
THE CHANTRY PHASE 1 AND 2 HAZARDOUS WASTE, DEBRIS AND ASH REMOVAL AND DISPOSAL PROJECT IS A COMPETITIVE TO UNDER THE R5 NON-CERCLA ENVIRONMENTAL SITE INVESTIGATION AND CLEAN-UP IDIQ, ACTIVITY II, FOR POST NATURAL DISASTER HAZARDOUS MATERIAL SITE CLEA
HARRISON GULCH BARRACKS AND OFFICE IMPROVEMENTS
R8 ENVIRONMENTAL SERVICES BPA CALL TO PROVIDE A COMPLETED CERCLA COMBINED PRELIMINARY ASSESSMENT/SITE INSPECTION (PA/SI) FOR THE CLEAR CREEK SHOOTING RANGE. THE WORK TO BE PERFORMED BY THE CONTRACTOR IS LOCATED ON THE CUMBERLAND RANGER DISTRICT OF T
BLINCOE MILL SAMPLING AND ANALYSIS PLAN (SAP) FOR A SITE INSPECTION (SI) AT MOJAVE NATIONAL PRESERVE MOD P00002 PROVIDES A TIME EXTENSION AND ADDITIONAL FUNDING.
THIS TASK ORDER IS FOR THE GOLINSKY MINE WATER DELIVERY SYSTEM PIPELINE TO BE ASSESSED, REPAIRED AND REDESIGNED IN ORDER TO MAKE IT WORK BETTER WITH MINIMAL MAINTENANCE NEEDS IN THE FUTURE. TASK 1 CONDUCT ENGINEERING INSPECTION AND ASSESSMENT. DESCR
ALPINE LOOP CAMPGROUNDS PRE-CERCLA EVAL CERCLA SCREENINGS FOR DISPERSES CAMPSITES
SERVICE: CERCLA ENVIRONMENTAL RESPONSE - SHUREE PONDS MONITORING
BPA CALL ESS FINALIZE AA EE/CA 2023 IAW STATEMENT OF WORK
Business Details
- UEI
- Y42NVBJCBEV4
- CAGE Code
- 3XVW7
- Address
- 3525 HYLAND AVE STE 200
STE 200
COSTA MESA, CA 926261480 - Congressional District
- CA-47
- Phone
- 7146622757
Parent Company
ENVIRONMENTAL COST MANAGEMENT, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov