Contract Awards
43 awards found
DOOR & WALL REPAIRS HANDLED THRU THE BUILDING LESSOR
GYM REPAIR & 8TH FL CONDENSATE PUMPS HANDLED BY LESSOR
WOR 988 BARRIER IMPACT REPAIR
HVAC PM SERVICES
HVAC PM SERVICES
CHILLED WATER PIPE REPAIR
3150-WOR 730 RAMP HEATER REPLACEMENT
Q4 BARRIER PM REPAIRS
BARRIER REPAIR
SOUTH EXIT REPAIR
MICHIGAN STATE UNIVERSITY WAS SELECTED AS THE LOCATION FOR THE ALL EMPLOYEE CONFERENCE FOLLOWING THE SHOOTING INCIDENT THAT OCCURRED ON THE MSU CAMPUS ON FEBRUARY 13, 2023. IDENTIFICATION OF THE BRESLIN STUDENT EVENTS CENTER AS THE VENUE ON THE MSU
SERVICES FOR A NEW LIGHT POLE TO INCLUDE PARTS SUPPLIED BY THE CONTRACTOR.
BUILDING MAINTENANCE PROVIDED BY LESSOR
LANDLORD INSTALLING LIGHTNING PROTECTION
WOR USAA 684 AND 954
CONTRACTOR TO PROVIDE AND INSTALL NEW CUSTOM SIGNAGE FOR THE MUSEUM TO READ FIDELITY BRAVERY INTEGRITY.
WORK ORDERS - LESSOR
SOLE SOURCE TO LANDLORD
WOR 947
WE ARE PAYING THE LESSOR FOR FOUR WORK ORDERS THAT THE CHICAGO DIVISION WAS BILLED FOR.
ALL EMPLOYEE CONFERENCE
ELECTRICAL CONTRACTOR CREATED A TEMPORARY POWER TO ENSURE MINIMUM LOSS OF POWER DURING ESSENTIAL RISER SHUTDOWN. A DISCONNECT WAS ADDED ALONG WITH TWO 100 AMP BREAKERS TO CREATE A BACK FEED OF NORMAL POWER TO ESSENTIAL CIRCUITS ON THE 4TH AND 5TH FLO
REPAIRS TO INCLUDE THE REPLACEMENT OF (2) TWO MAIN HYDRAULIC CYLINDERS, (4) FOUR MAIN CYLINDER PINS, (4) FOUR BRASS BUSHINGS, (2) TWO DIRECTIONAL VALVES LOCATED WITHIN THE HPU CABINET, AND BIODEGRADABLE HYDRAULIC OIL. THE SOUTH EXIT AND ENTRY BARRIER
CONTRACTOR TO PROVIDE AND INSTALL NEW (UP,DOWN, STOP) BUTTON CONTROLLERS TO COINCIDE WITH THE RESPECTIVE OVERHEAD DOORS. CONDUIT AND WIRE WILL BE EXTENDED OVER FOR THE SAME.
THIS PROPOSAL IS IN REGARDS TO SOW (FBI 125) ADDING POWER AND DATA IN ROOM 225 FOR A NEW TV LOCATION AND ADDITIONAL POWER WITHIN THE ROOM.
THIS PROPOSAL IS IN REGARDS TO SOW FBI 126 ADDING POWER OUTLETS TO THE SOUTHWEST CORNER OF B2 GARAGE. WORK TO INCLUDE PULLING TWO NEW DEDICATED CIRCUITS FOR A TOTAL OF FOUR OUTLETS TO BE PLACED ALONG THE SW CORNER OF THE B2 LEVEL OF THE GARAGE NEAR T
INVOICE IN REGARDS TO THE WEST ENTRY BARRIER NOT OPERATING PROPERLY, THE INITIAL SATURDAY CALL OUT TO PERFORM TROUBLESHOOTING, AND THE SERVICE CALL/VISIT THAT WAS NEEDED FOR REPAIRS. ENGINEERING WAS CALLED ONSITE ON SATURDAY, NOVEMBER 19TH, TO TROUBL
STRUCTURAL ANALYSIS TO INCLUDE A SITE VISIT, STRUCTURAL AND BUILDING PRINT REVIEW, WEIGHT LOAD CALCULATIONS OF EXISTING FIXED EQUIPMENT, NEW VEHICLE WEIGHT REVIEW, AND A FORMAL REPORT OF FINDINGS.
REMOVE WALLCOVERING FROM ALL WALLS IN MEDIA ROOM AND PREP WALLS FOR NEW FINISHES. PAINT WALLS AND COLUMN WITHIN SPACE. MATCH EXISTING COLOR. FURNISH AND INSTALL CUT VINYL LETTERS 6". COLOR TO BE WHITE.
WORK TO INCLUDE INSTALLING ONE NEW DEDICATED 208V/20AMP OUTLET FROM PANEL NA3A OVER TO THE WEST WALL OF THE AUTO SHOP AND INSTALL A NEW L620R TYPE RECEPTACLE. WORK WILL ALSO INCLUDE MOVING AN EXISTING OUTLET OVER TO THE NEW LOCATION FOR FUTURE EQUIPM
TO REPLACE BARRIER EQUIPMENT TOE GUARD SIDE PANELS ON ALL FOUR BARRIER PLATES.
ADDITIONAL SURGE PROTECTION BACK UP ON THE EXISTING CAMERA SYSTEM POWER LOCATIONS IS NEEDED. ALSO, IT IS RECOMMENDED THAT THE CLASS 2 CAMERA WIRING AND CAMERA ELECTRONIC EQUIPMENT AT THE LIGHT POLE BE CHECKED TO MAKE SURE IT ISNT GROUNDING TO THE MET
TRANSFORMING CONFERENCE ROOM 432 INTO FOUR WORKSTATIONS WILL INCLUDE ADDING POWER, DATA & A TV LOCATION WITHIN THE SPACE. WORK WILL TAKE PLACE MONFRI 8:00AM TO 4:00PM AND IT IS ASSUMED THAT ESCORTS WOULD BE PROVIDED BY TENANT DURING THOSE NORMAL WORK
CONTRACTOR TO PROVIDE AND INSTALL NEW CUSTOM SIGNAGE FOR THE MUSEUM TO READ FIDELITY BRAVERY INTEGRITY.
REPAIRS TO SOUTH EXIT BARRIER
CONTRACTORS WILL SUPPLY LABOR AND MATERIALS TO REMOVE EXISTING GLUED ON STENCILING, PATCH WALLS AND REPAINT. ONCE PAINT IS DRY, CONTRACTORS WILL SUPPLY AND INSTALL NEW STENCILING IF EXISTING STENCILING CANNOT BE REUSED.
CONTRACTOR TO PROVIDE AND INSTALL NEW (UP,DOWN, STOP) BUTTON CONTROLLERS TO COINCIDE WITH THE RESPECTIVE OVERHEAD DOORS. CONDUIT AND WIRE WILL BE EXTENDED OVER FOR THE SAME.
ELECTRICAL WORK
ERT BAY FLOORING TO RE EPOXY ROOMS
A VEHICLE IMPACT TOOK PLACE AT THE SOUTH EXIT BARRIER/GATE CAUSING DAMAGE TO THE GATE ARM AND MOUNT. REPAIRS WILL INCLUDE REMOVING THE EXISTING (UNDAMAGED) LED LIGHT BAR FROM THE DAMAGED GATE ARM AND BRACKET, REPLACING THE EXISTING ARM GATE AND BRACK
CONTRACTORS WILL SUPPLY LABOR AND MATERIALS TO REMOVE EXISTING GLUED ON STENCILING, PATCH WALLS AND REPAINT. ONCE PAINT IS DRY, CONTRACTORS WILL SUPPLY AND INSTALL NEW STENCILING IF EXISTING STENCILING CANNOT BE REUSED.
REMOVE WALLCOVERING FROM ALL WALLS IN MEDIA ROOM AND PREP WALLS FOR NEW FINISHES. PAINT WALLS AND COLUMN WITHIN SPACE. MATCH EXISTING COLOR. FURNISH AND INSTALL CUT VINYL LETTERS 6". COLOR TO BE WHITE.
THE LESSOR WILL PICK A COMPANY TO SUPPLY LABOR AND MATERIAL FOR REMOVING EVERYTHING OFF THE WALLS INCLUDING CABINETS, PATCHING, PRIMING, AND REPAINTING THE WALLS ADMIRAL BLUE 206510.THE COMPANY WILL THEN REINSTALL THE CABINETS AND CERTAIN PICTURES TO
Business Details
- UEI
- WV1HBD93NU93
- CAGE Code
- 4C8H9
- Address
- 9830 COLONNADE BLVD STE 600
STE 600
SAN ANTONIO, TX 782302209 - Congressional District
- TX-21
- Phone
- 3128296570
Parent Company
FBI CHICAGO PARTNERS LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov