ASHE AIRCRAFT ENTERPRISES LTD.
CALGARY, AB T3Z 3S4
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 488190 | $2.82M | 27 |
Contract Awards
23 awards found
NOAA/OMAO/AOC TWIN OTTER AIRCRAFT MAINTENANCE CONTRACT
NOAA/OMAO/AOC TWIN OTTER AIRCRAFT MAINTENANCE CONTRACT
NOAA/OMAO/AOC TWIN OTTER AIRCRAFT MAINTENANCE CONTRACT
NOAA/OMAO/AOC MAINTENANCE CONTRACT_30-MONTH INSPECTION AND AUDIO SYSTEM UPGRADE FOR N57RF
60 MONTH MAINTENANCE FOR NOAA AIRCRAFT OPERATIONS CENTER.
AVIONICS SYSTEM UPGRADE N56RF. NOAA AOC IS OVERHAULING THE AUDIO SYSTEMS ON BOARD ALL NOAA TWIN OTTERS. N56RF IS SCHEDULED TO BE THE FIRST AIRCRAFT TO RECEIVE THE UPGRADED SYSTEM ON/AROUND SEP 1, 2024. THE UPGRADES ARE TO BE MADE ON THE AIRCRAFT IN
COMPLETE 30-MONTH CORROSION INSPECTION FOR DHC-6-300 TWIN OTTER IN ACCORDANCE WITH MANUFACTURER'S CORROSION PREVENTION AND CONTROL MANUAL PSM 1-6-5 AND IAW INSPECTION REQUIREMENTS MANUAL PSM 1-6-7 (PER B.3 IN THE STATEMENT OF WORK). N56RF S/N
COMPLETE 30-MONTH CORROSION INSPECTION FOR DHC-6-300 TWIN OTTER IN ACCORDANCE WITH MANUFACTURER'S CORROSION PREVENTION AND CONTROL MANUAL PSM 1-6-5 AND IAW INSPECTION REQUIREMENTS MANUAL PSM 1-6-7 (PER B.3 IN THE STATEMENT OF WORK). N56RF S/N
AVIONICS SYSTEM UPGRADE N56RF. NOAA AOC IS OVERHAULING THE AUDIO SYSTEMS ON BOARD ALL NOAA TWIN OTTERS. N56RF IS SCHEDULED TO BE THE FIRST AIRCRAFT TO RECEIVE THE UPGRADED SYSTEM ON/AROUND SEP 1, 2024. THE UPGRADES ARE TO BE MADE ON THE AIRCRAFT IN
COMPLETE 30-MONTH CORROSION INSPECTION FOR DHC-6-300 TWIN OTTER IN ACCORDANCE WITH MANUFACTURER'S CORROSION PREVENTION AND CONTROL MANUAL PSM 1-6-5 AND IAW INSPECTION REQUIREMENTS MANUAL PSM 1-6-7 (PER B.3 IN THE STATEMENT OF WORK). N56RF S/N
AVIONICS SYSTEM UPGRADE N56RF. NOAA AOC IS OVERHAULING THE AUDIO SYSTEMS ON BOARD ALL NOAA TWIN OTTERS. N56RF IS SCHEDULED TO BE THE FIRST AIRCRAFT TO RECEIVE THE UPGRADED SYSTEM ON/AROUND SEP 1, 2024.
30 MONTH OVERHAUL AND MAINTENANCE OVER NOAA AIRCRAFT OPERATIONS
60 MONTH MAINTENANCE FOR NOAA AIRCRAFT OPERATIONS CENTER.
60 MONTH MAINTENANCE FOR NOAA AIRCRAFT OPERATIONS CENTER. MAINTENANCE, REPAIRS, UPGRADES, AND INSPECTION PARTS AND LABOR. THIS CLIN IS ON A TIME AND MATERIALS BASIS. THE NOT-TO-EXCEED (NTE) AMOUNT IS DETERMINED BY THE GOVERNMENT AT THE TIME OF AWARD.
60 MONTH MAINTENACE FOR NOAA AIRCRAFT OPERATIONS CENTER. MAINTENANCE, REPAIRS, UPGRADES, AND INSPECTION PARTS AND LABOR. THIS CLIN IS ON A TIME AND MATERIALS BASIS. THE NOT-TO-EXCEED (NTE) AMOUNT IS DETERMINED BY THE GOVERNMENT AT THE TIME OF AWARD
30 MONTH OVERHAUL AND MAINTENANCE OVER NOAA AIRCRAFT OPERATIONS
60 MONTH MAINTIENCE FOR NOAA AIRCRAFT OPERATIONS CENTER .
THE 30 MONTH CORROSION INSPECTION FOR DEHAVILLAND DHC-6-300 TWIN OTTER SN740, TAIL NUMBER N48RF FOR NOAA AIRCRAFT OPERATIONS CENTER.
60-MONTH MAINTENCE FOR AOC
60 MONTH CORROSION INSPECTION FOR NAOO/OMAO/AIRCRAFT OPERATIONS CENTER (AOC).
NOAA/OMAO/AIRCRAFT OPERATIONS CENTER (AOC), CORROSION INSPECTION AND RELATED MAINTENANCE FOR DHC-6-300 TWIN OTTER
OVER AND ABOVE MAINTENANCE ITEMS
OVER AND ABOVE MAINTENANCE ITEMS
Business Details
- UEI
- VA5MKL2PRJX5
- CAGE Code
- L4214
- Address
- 129 MACLAURIN DR
CALGARY, T3Z 3S4 - Phone
- 4032883305
Parent Company
417438 ALBERTA LTD
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov